Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont

Slides:



Advertisements
Similar presentations
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Advertisements

Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 32 Started with luminosity production…
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Coordination: G. Arduini, E.B. Holzer
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Main aims: LHCb polarity switch, Luminosity production
Coordination: Gianluigi Arduini & Jan Uythoven
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Scrubbing progress - 09/12/2012
Scrubbing progress - 10/12/2012
Coordination by E. B. Holzer & J. Wenninger Production
Mike Lamont, Jorg Wenninger
LHC Morning Meeting - G. Arduini
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
LHC Morning Meeting - G. Arduini
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
LHC Morning Meeting - G. Arduini
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Saturday 3rd November - morning
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
Another Immortal Fill….
Monday 27th August & night
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Saturday 26 November 2011.
Tuesday
Presentation transcript:

Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont Main aims: Luminosity production, 25 ns test to verify feasibility of scrubbing run after change of MKI8D Many thanks to the injectors for the quick setting-up of the 25 ns beam on Q20: H. Bartosik, S. Cettour-Cave, Y. Papaphilippou Damper team: W. Höfle, G. Kozian, D. Valuch Injection team: W. Bartmann, C. Bracco, G. Vanbavinckhove

Summary of week 40 - G. Arduini 7x1033 cm-2s-1 25 ns test – CMS solenoid Access Cryo-Pt4 LATLAS LCMS IB2 IB1 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini Last 24 hours 06:30 ALICE DIPOLE power converter trip. End of fill #3135. 158 pb-1 in 10h3m. 07:41 OK from power piquet to restart the ALICE dipole power converter but reason of the fault not understood 09:00 ATLAS have a gas leak in TRT detector - urgent access of ~1h required (LHC is anyway waiting for the injection kickers to cool down) 10:32 ATLAS access finished PS RF expert (H. Damerau) increasing longitudinal blow-up to enhance satellite population 11:04 MKI kicker temperature below threshold 11:00-11:40 Steering TI2/TI8. Some more losses at injection (satellites?) 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini Last 24 hours 12:41 Loss of communication of vacuum valve status in point 7 (Beam 2). Beam dump during the squeeze. Access required. 15:23 Injecting after vacuum intervention. 17:03 STABLE BEAMS #3138. Initial luminosity ~7.3x1033 cm-2s-1 ALICE head-on luminosity reaching 1031 cm-2s-1 with enhanced satellites after further adjustment in the PS in the morning. No need to change filling scheme. Several trips of damper H1B2. No more able to reset it. 00:57 MKI2 faulty  heater module to be replaced 02:58 Dump trigger from BLM L1 (spurious?) Start preparation of MD (problem with line 3B1) and call piquets (MKI, RF) Access ongoing for RF in point 4 08/10/2012 Summary of week 40 - G. Arduini

Main faults Mon 01/10 2.5 (6.3) 13 MKI8 power supply and sublimation Date Duration [h] Description Mon 01/10 2.5 (6.3) 13 MKI8 power supply and sublimation CMS solenoid (shared with 25 ns test) Tue 02/10 2 MKD-B1 ASI safety bus corruption (access required) Wed 03/10 2.2 6.7 MKB-B2 PLC Access (Miscellaneous) Thu 4/10 9.4 1 Cryo point 4 (PLC) OP (QPS reset with Q6 at high current) Fri 5/10 2.5 1.7 Vacuum valve control rack power supply (B1) – TZ76 RQ8.L1 trip (QPS-noise) Sun 7/10 2.6 2.7 MKI heating Vacuum valve control rack power supply (B2) – TZ76 Mon 08/10 MKI2 heater power supply RF (damper+RF cavity) Total 48.3 (29%)

Summary of week 40 - G. Arduini Main faults by system System Time [h] Comments Experiments 13 CMS solenoid (shared with 25 ns test) Kickers 10.3 MKI temperature, MKI8 power supply and sublimation, MKD-B1 safety bus, MKB-B2 PLC, MKI2 heater power supply Cryogenics 9.4 Point 4 – PLC Cold-box Miscellaneous 6.7 Access for (cryogenics, beam instrumentation, power converters, vacuum, ATLAS, TOTEM, QPS, ventilation door in UJ33) Vacuum 5.2 Vacuum valve control rack power supply (B1&B2) – TZ76 QPS 1.7 RQ8.L1 trip (QPS-noise) RF 1 Damper+RF cavity OP QPS reset with Q6 at high current Total 48.3 (29 %) 08/10/2012 Summary of week 40 - G. Arduini

Fills from 01/10 – 08:00 Fill Nb@SB start [1011] # bunches Duration Lint [pb-1] Dump reason 3121 1.54 1230 11.3 150 OP dump 3124 1.55 0.9 19 Wrong reading current lead temp. RCBVX2.R2 3126 1374 6.4 114 RQF.A45 (QPS – noise) 3128 1.49 0.2 5 SIS – orbit distortion trip RCBH29.R6B2 3129 4.6 83 Cryo – Pt 4 (PLC) 3130 1.59 0.3 7 Vacuum control rack power supply (B1) – TZ76 3131 1.56 3.5 66 UFO (29.L3) 3133 1.57 14.5 187 3134 12.5 178 3135 1.60 10.0 157 ALICE dipole power converter 3138 1.58 9.9 BLM (spurious?) Total 74 1116 STABLE BEAMS 74 h (44.6 %) 08/10/2012 Summary of week 40 - G. Arduini

Lost fills before stable beams (>450 GeV) c/o Post-Mortem DB Event Timestamp Phase Beam Energy [TeV] Fill Number Comment 02-OCT-12 16:17 RAMP 3.3 3122 LBDS internal trigger 02-OCT-12 19:41 FLAT TOP 4 3123 BBQ front-end frozen. Dump after reboot. 07-OCT-12 12:41 SQUEEZE 3137 Vacuum control rack power supply (B2) – TZ76

286 pb-1 delivered on Sat 6/10 from 00:00 to 24:00 UTC At least one record 286 pb-1 delivered on Sat 6/10 from 00:00 to 24:00 UTC

Summary of week 40 - G. Arduini Performance ~16.4 fb-1 ~1.6 fb-1 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini Performance Q20 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini Performance 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini Performance 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini 25 ns test: MKI8 Hit (new) interlock on interconnect pressure after 1 or 2 72 bunch trains. No significant decrease unless losses. No effect of solenoid. Hit interlock on MKID pressure when injecting B1 (444 bunches) IB1 IB2 VGPB.192.5R8.R (interconn. to Q5) MKID (tank) Solenoid curr. [A] 12 12+72 12 12+2x72 12+72+144+216 12+72 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini 25 ns test: MKI2 Hit interlock on interconnect pressure after with 444 bunches on B1. Interlock added after TS3 IB1 IB2 VGPB.4.5L2.B (interconnect) In the present conditions the scrubbing run cannot be performed efficiently without an increase of the vacuum thresholds in particular at the interconnects (new) Considered too risky for the operation of the injection kickers LMC decision to postpone the scrubbing run 12 12+72 12 12+2x72 12+72+144+216 12+72 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini 2012 after technical stop Sublimation & 25 ns test High intensity 50 ns 08/10/2012 Summary of week 40 - G. Arduini

W. Höfle, G. Kotzian, D. Valuch Damper bandwidth New filter coefficients for enhanced frequency response (flat up to 20MHz) as part of the 25 ns set-up Almost ideal bunch-by-bunch damper. Signal edges are fast and bunches should not see each other through the impulse response. W. Höfle, G. Kotzian, D. Valuch 50 ns beam could profit of that  some more tests with 50 ns beams required at injection and during the ramp. 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini Q20 Q20 optics in operation in the SPS since 2 weeks (H. Bartosik, Y. Papaphilippou with support from RF and BT teams) Emittances at injection in the LHC are smaller by approximately 5-10% and good reproducibility. Not yet profited by that reduction in collision Q20 vs. Q26  smaller longitudinal emittance from SPS  IBS likely to induce larger blow-up importance of batch by batch longitudinal blow-up  to be put in operation 08/10/2012 Summary of week 40 - G. Arduini

Unexplained increase in termperature Kicker heating Clear eduction of the temperature on MKI8D Thresholds on the other magnets increased (M. Barnes) after analysis of pulse waveforms taken during soft-start above threshold temperature. Unexplained increase in termperature 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini To be followed up BSRT B2 not available. B1 doubtful. ALFA roman pot temperature Vacuum control equipment in point 7 (various faults in the last period. Radiation?) S. Jakobsen 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini MD3 starting… 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini Pending LHCb polarity switch after MD3 Operational Development Gated tune measurement with reduced damper gain on first 6 bunches (ongoing) Damper test at injection of the increased bandwidth with 50 ns beam  can be tested during pilot run for LHCb polarity switch Longitudinal Batch by batch blow-up Next coordination team: J. Uythoven, J. Wenninger 08/10/2012 Summary of week 40 - G. Arduini

Summary of week 40 - G. Arduini 08/10/2012 Summary of week 40 - G. Arduini