Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.

Slides:



Advertisements
Similar presentations
GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Advertisements

Joining Forces Europe's first cross-border Transmission System Operator J.M. Kroon MBA, CEO TenneT Holding Düsseldorf, 10 November 2009.
Chisinau International Airport Modernization Project II.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Building of Research Team in the Field of Environmental Modeling and the Use of Geoinformation Systems with the Consequence in Participation in International.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Astana - November 2008 “Break Through Projects of the National Company “KazMunayGas”
Longyuan Mulilo De Aar 2 WEF MW Onshore Wind Energy Facility
Ministry of Energy and Water Resources of the Republic of Tajikistan
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
Africa Geospatial Forum Geospatial Empowering Utilities.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Turkish Power System Overview March 2012
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
1 Republic of Armenia Reforms in the area of ​​ public procurement and next steps Skopje May, 2013.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Nikolai Kravtsov Public Foundation «Youstin» (Consumer Association) Washington, USA April, 2010 ELECTRICITY GOVERNANCE INITIATIVE AND REGIONAL ELECTRICITY.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
Donor Conference Ministry of Energy of Georgia. Current situation Technical problems –Power sector of Georgia – not build to operate independently Economic.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
SEMINAR ON ENERGY: ELECTRICITY TRANSMISSION A presentation to the KENYA – SPAIN MULTILATERAL PARTNERSHIP MEETING By Dr. (Eng.) John M. Mativo Chief Manager.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Pacific Aviation Investment Program. US$125 m Adaptable Program Loan Phase 1 Phase 2, 3, 4 Objective: improve operational safety and oversight of international.
Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz.
“Electricity System Operator” EAD S tate and Prospects for Development of the Bulgarian Electrical Power System Ventsislav Zahov, Head of Electrical Regimes.
Better Energy, Better World Cooperation in Natural Gas Industry between Russia and Korea Sept Better Energy, Better World.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 15 – Energy Bilateral screening: Chapter.
Hanoi, October GROWTH RATE OF ELECTRICITY DEMAND Growth rate of Electricity consumption, period Growth rate of Electricity consumption,
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
Development of Renewable Energy Challenges and Prospects
Irvine Ranch Water District Distributed Energy Storage Case Study
(Energy Market Regulatory Authority)
“Electricity Supply Reliability Project - Additional Financing”
GEORGIAN ELECTRICITY MARKET OPERATOR
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Gas Supply to the EU – the Role of the Slovak Republic
GRI-S : Infrastructures The Union list of projects of common interest
Ensuring Security of Supply in Estonian Transmission Grid
Presentation to the Enron Corp. Finance Committee
TRANSIT OF OIL AND GAS ACROSS TURKEY
Cross-border Infrastructure Projects
Interconnection Practice, Policies, Procedures ComEd Illinois
Energy, Finance, Partnerships: Transforming Clean Business
REPUBLIC OF ARMENIA Seoul, Korea September 2017.
Yangon Region Rural electrification plan
Construction of Balkhashskaya TPS
HVDC Transmission Systems:
DIVERSIFICATION OF TRANSPORT ROUTES AS
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas DG ENLARGEMENT D3.
The Eastern Partnership
Energy Sector Overview
Energy Strategy Center of Scientific Research Institute of Energy
Background The electrification programme was started by Eskom during the late 1980’s It was further refined by the National Electrification Forum.
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Electricity Transmission Network Improvement Project Grant for preparation
International Conference
ECE 476 POWER SYSTEM ANALYSIS
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation

Terms and conditions of Provided Investment Facilities Based on the Memorandum of Mutual Understanding signed on May 17, 2006 between the Republic of Armenia and the Islamic Republic of Iran a Contract (N4777/85EPC) was signed between SUNIR Company and Ministry of Energy and Natural Resources of RA “High Voltage Electric Networks’’ CJSC for “Design, Engineering, Procurement of Goods and Equipment, Supply and Construction of Iran-Armenia 400kV third power transmission line” (hereinafter Project). The Project cost is 107,9 mln. Euro. The financing of 77% of Contract total price will be carried out by the Export Development Bank of Iran (EDBI). (Financial Agreement N900/M/ARM/09, 26.07.2011 ), and 23% (24,8 Euro) by Company «SUNIR International FZE» (Bond Contract N1390/1195/57175, 23.02.2012)

Signing of additional Contract of financing recommencement with EDBI The length of OTL is 268 km, the number of towers are 706. The construction works of Project were kicked-off on August 2012 but they had been suspended at the beginning of 2013. On August 9, 2015 EDBI has recommenced financing and as a recommencement date was defined 01.09.2015. Signing of additional Contract of financing recommencement with EDBI

Project Objectives The Project implementation will enable: Enhancing the power flows from 350 MW up to about 1,000 MW between the Republic of Armenia and the Islamic Republic of Iran Increasing the reliability and stability of parallel works of RA and IRI Energy systems Increasing the Energy Security level Increasing the reliability and stability of Energy systems of RA by strengthening the North-South power connection of Republic Using the entire volume gas pipeline capacity of Iran-Armenia in the framework of the program "Gas Towards Electricity“.

Expected Project Results In the result of Project Implementation 400 kV double circuit OTL will enter into operation with the length of 268 km from “ Ddmashen” substation up to the southern border of RA (Agarak) and after construction of Armenia-Georgia 400kV OTL Armenia will become a transit country of Energy power.  

Project Implementation Deadlines According to Performance schedule, Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“Noravan’’ 400/220/20 kV) and related substation should be completed in 2017.

Loan and Grant Project of The impact on Electricity tariff in the result of Project Implementation Project name   01.08.2016-01.08.2017 01.08.2017-01.08.2018 01.08.2018-01.08.2019 01.08.2019-01.08.2020 01.08.2020-01.08.2021 01.08.2021-01.08.2022 01.08.2022-01.08.2023 01.08.2023-01.08.2024 01.08.2024-01.08.2025 01.08.2025-01.08.2026 01.08.2026-01.08.2027 01.08.2027-01.08.2028 01.08.2028-01.08.2029 01.08.2029-01.08.2030 Loan and Grant Project of “Construction of Iran-Armenia 400kV third power transmission line and substation ” Mln. dram 4,044.1 11,535.2 19,518.8 10,112.2 9,667.7 9,223.3 4,444.9 0.0 Impact on tariff 0.5944 1.6954 2.8687 1.4862 1.4209 1.3556 0.6533 0.0000

The impact on Electricity tariff in the result of Project Implementation