Overview of the RFCC Module and 201-MHz Cavity Design

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Muon Front End Buncher, Phase Rotation, Cooling Schematics & CAD model based on MICE Cavities Alan Grant Daresbury (April 10, 2012)
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 26, 2010 University of California, Riverside,
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
201 MHz Cavity Studies Derun Li Lawrence Berkeley National Laboratory MuCool RF Workshop (Fermilab) July 7 and 8, 2009.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
201-MHz NCRF Cavity Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at Fermilab March 16, 2006.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MICE RFCC Module Status: RF Cavities Derun Li A. DeMello, S. Virostek, M. Zisman Lawrence Berkeley National Laboratory NFMCC Collaboration Meeting The.
MUCOOL RF Program Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 18, 2007.
MICE RFCC Module and 201 MHz Cavity Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 15, 2009.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Progress on the MICE RFCC Module Mike Zisman/Steve Virostek Lawrence Berkeley National Laboratory MuCool Test Area RF Workshop October 15, 2008.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
RFCC Module and RF Cavity Construction
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
PXIE RFQ Design Overview Derun Li for PXIE RFQ Design Team Center for Beam Physics Accelerator and Fusion Research Division Lawrence Berkeley National.
Progress on Beryllium Cavity Design R. Fernow, D. Li, R. Palmer, D. Stratakis, S. Virostek as told to Michael S. Zisman Center for Beam Physics Accelerator.
RF R&D (Issues) for Muon Ionization Cooling Channels
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

Overview of the RFCC Module and 201-MHz Cavity Design RFCC Module RF Cavity Design Review October 21, 2008 Derun Li Lawrence Berkeley National Laboratory

Outline Introduction of RFCC module of MICE cooling channel and charge of the review Review of the 201-MHz cavity design MuCool 201-MHz prototype cavity: baseline design for MICE Physics design and cavity fabrications Cavity body RF coupler Be windows Tuners Recent progress Vendor identification Engineering CAD model and FEA analysis Tuners and cavity support Integration and interface Schedule Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Eight 201-MHz Cavities for MICE Eight 201-MHz RF cavities MICE Cooling Channel Courtesy of S. Q. Yang, Oxford Univ. RFCC modules Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

RFCC Module SC coupling Coil Curved Be window Cavity Couplers Vacuum Pump 201-MHz cavity Curved Be window Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Charge of this Review Evaluate the engineering design of RFCC module and the RF cavity Evaluate engineering design and fabrication schemes of the 201-MHz cavity Spinning of cavity shells e-beam welding Port extruding Tuners Cavity support Cavity assembly Evaluate overall module concept Interface with other modules Site interfaces Integration and shipping Detailed design of CC is not part of this review CC design review scheduled: Dec. 6-8, 2008 at ICST of HIT, Harbin Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

RFCC & Cavity Design Review Agenda 15:300 – 18:30 October 21, 2008 at RAL Overview of RFCC Module and Recent Progress Li 201 MHz Cavity Fabrication Plan DeMello Assembly, Installation and Interface Virostek Coffee break RFCC Module and Subcomponents Mechanical Design DeMello Schedule and Manpower Virostek Discussion Executive Session Committee Closeout Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

MICE RF Cavity Summary MICE RF cavity design is based on the successful prototype cavity for the US MuCool program Fabrication of the prototype cavity was successful A slight reduction in cavity diameter to raise the frequency has been specified and analyzed The fabrication techniques used to produce the prototype will be used to fabricate the MICE RF cavities Preliminary cavity design was reviewed at CM21 at DL Copper sheets have been ordered and expected to arrive mid-December 2008 A detailed WBS schedule for the design and fabrication of the MICE RF cavities has been developed Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

MICE RF Cavity Design 3-D Microwave Studio RF parameterized model including ports and curved Be windows to simulate frequency, Epeak, etc. Hard to reach the design frequency by spinning technique Frequencies between cavities should be able to achieve within  100 kHz Approaches Modification the prototype spinning form Targeting for higher frequency Fixed tuner to tune cavity close to design frequency (deformation of cavity body) Tuners are in push-in mode  lower frequency Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Cavity Design Parameters The cavity design parameters Frequency: 201.25 MHz β = 0.87 Shunt impedance (VT2/P): ~ 22 MΩ/m Quality factor (Q0): ~ 53,500 Be window diameter and thickness: 42-cm and 0.38-mm Nominal parameters for MICE and cooling channels in a neutrino factory 8 MV/m (~16 MV/m) peak accelerating field Peak input RF power: 1 MW (~4.6 MW) per cavity Average power dissipation per cavity: 1 kW (~8.4 kW) Average power dissipation per Be window: 12 watts (~100 watts) Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

201 MHz Cavity Concept Spinning of half shells using thin copper sheets and e-beam welding to join the shells; extruding of four ports; each cavity has two pre-curved Beryllium windows, but also accommodates different windows Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

RF Cavity Fabrication Overview The same fabrication techniques used to make the prototype cavity will be used for the MICE RF cavities Engineering CAD Model of the RF Cavity Cavity half-shells to be formed by metal spinning Precision milling of large parts (1.2 m diameter) Precision turning of mid-sized parts (0.6 m dia.) Precision manufacture of smaller parts CMM measurements throughout the process To limit any annealing and maintain cavity strength, e-beam welding will be used for all cavity welding cavity equator, stiffener rings, nose rings, port annealing and port flanges Cavity inside surfaces are finished by electro-polishing Prototype RF Cavity Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Progress Summary RF Cavities Cavity tuners Material to arrive 12/08 Fabrication steps identified RF, thermal, structural analyses done Detailed design complete Fabrication drawings nearly done Vendor qualification under way Be windows being ordered Final vendor selection not complete Electropolish not fully defined Cavity tuners RF, structural analyses complete Actuation cylinder type identified Detailed design, drawings not complete Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Progress Summary (cont.) Cavity Struts Structural analysis complete LBNL standard detailed design Fabrication, installation dwgs not done Coupling Coil Interface Magnet gusset mod sent to ICST Additional interface details TBD Cavity Cooling Water Feedthrough concept developed Detailed design not complete Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Progress Summary (cont.) Module Vacuum Vessel Conceptual design/CAD model complete Structural analysis not complete Detailed design, drawings not complete Module Vacuum System Conceptual design complete Lumped parameter analysis soon Failure analysis not complete RF Couplers Design previously developed for MuCool cavity Modifications for MICE not complete vacuum Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Progress: Other Module Components Beryllium Window Dynamic Tuners Cavity Suspension Vacuum System RF Coupler Module Support DeMello’s talk for more details Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008 15

Liquid Nitrogen Cooling Considerations Suspension of cavities on struts provides low heat leak from cavity to vacuum vessel Beryllium window FEA thermal analysis will need to be performed with new parameters The cavity frequency will be shifted (approximately 600 kHz), therefore tuning system or RF power source modifications will be needed Insulators will need to be added to the RF couplers Coaxial LN feedthrough tubes will be needed to insulate the connection outside of vacuum Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008

Summary Good progress since last CM and review, details of technical designs, interface and schedules (DeMello and Virostek) Responses to last review (DeMello) RFCC & Cavity Design Review Agenda (15:30 – 18:30 October 21, 2008 at RAL) Overview of RFCC Module and Recent Progress Li 201 MHz Cavity Fabrication Plan DeMello Assembly, Installation and Interface Virostek Coffee break RFCC Module and Subcomponents Mechanical Design DeMello Schedule and Manpower Virostek Discussion Executive Session Committee Closeout Overview of the RFCC Module and 201-MHz Cavity Design Derun Li - Lawrence Berkeley National Lab - October 21, 2008