Introduction: FCC beam dumping system

Slides:



Advertisements
Similar presentations
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
Advertisements

CLIC collimator survival IWLC 2010 J.L. Fernández-Hernando – ASTeC/Cockcroft Institute (Daresbury Lab.) 21/10/2010 J.L. Fernández-HernandoASTeC/CI21/10/2010.
CAS June Stored energy and risks Failures Protection systems Beam Instrumentation Case studies Conclusions Machine Protection Rüdiger Schmidt CAS.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Concept & architecture of the machine protection systems for FCC
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
FCC-hh Injection and Extraction
Beam Dynamics Tutorial, L. Rivkin, EPFL & PSI, Prague, September 2014 Synchrotron radiation in LHC: spectrum and dynamics The Large Hadron Collider (LHC)
Beam Dumping System – Failure Scenarios Brennan Goddard, CERN AB/BT How the dump system can fail Catalogue of primary failures Failure classes and protection.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
Aperture in case of an asynchronous beam dump with ATS optics R. Bruce, E. Quaranta, S. Redaelli With valueable input from: A. Bertarelli, C. Bracco, F.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Beam absorbers for Machine Protection at LHC and SPS
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
2 nd BLMTWG meeting, B. Auchmann, O. Picha, with A. Lechner.
R.Schmidt and J.Wenninger - Lumi ‘061 Rüdiger Schmidt Jörg Wenninger CERN LUMI 06 in Valencia / Spain Friday 20 October 2006 Machine protection for PS2,
PS2 WG Injection and extraction systems Basics and assumptions
Aperture measurements during LHC commissioning 2017
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Ion Commissioning: Thursday & Friday
The TV Beam Observation system - BTV
LINAC4 ADVISORY COMMITTEE
1st LHC MD Period Started
Surviving an Asynchronous Beam Dump?
The LHC Beam Dumping System
LHC beam dump 7.56 TeV operation
MKD/MKB Review Meeting Scope and Definition
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
Jan Uythoven For discussion
Case Study - Group 2 FCC-ee Top-Up Injection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Risk Review: Kicker Magnet Reliability
FCC hh dump kicker - switch topologies and impact on beam
Overview on LHC Machine Failure Scenarios
FCC-hh injection group 7
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Initial Experience with the Machine Protection System for LHC
Beam collimation for SPPC
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Machine Protection Xu Hongliang.
LHC Injection and Dump Protection
Lost at 12:05 to power converter (RTQX2.R1) problem
2017 CAS Erice case study: Design of a beam dumping system for FCC
LHC Morning Meeting - G. Arduini
Saturday 2/4/ :00-09:00 Problems with SPS:
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Planning at 5 o’clock meeting Friday
Protection against accidental beam loss at the LHC
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Machine protection and closed orbit
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
Wednesday 23/2 Thanks CRYO!!!.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Powering scheme for Hollow Electron Lens
Large emittance scenario for the Phase II Upgrade of the LHC
What systems request a beam dump? And when do we need them?
Presentation transcript:

Introduction: FCC beam dumping system The energy of 8 GJ in the FCC beams is impressive Studies o hydrodynamic tunnelling: 8000 bunches travel more than 100 m (preliminary) We manage to safely dump beam of up to 150 MJ We have a lot of operational experience with LHC A scaling of the LBDS might be possible, but we should also explore other options Thinking outside the box, coming up with crazy ideas that, even if discarded, sometimes trigger other thoughts These thoughts be considered as encouragement to consider other «crazy» ideas Challenge of asynchronous beam dump Challenge of dumping the beam in the beam dump block

FCC beam dumping system Concentrate of designing a beam dumping system for top energy, if we can design the beam dumping system for top energy, it will also work for lower energy Can we conceive a beam dumping system that will not generate asynchronous beam dumps? If yes, consequences on triggering and parameters of beam dump kickers If no, design protection systems accordingly (TCDQ like absorber, collimators must stand impact) What is the damage potential of one single bunch at top energy with FCC parameters? Depends on the beam size What is the beam size that will allow to stop one bunch with light material (such as carbon) without damage?

No asynchronous beam dump Wrong trigger to all kicker magnets to be avoided Electronics safety system to prevent such wrong trigger Coincidence of trigger signal with observation of abort gap, by beam monitors (BPM using sum signal) Similar safety level as in airplanes ….not allowed to switch engine off, no failsafe status Challenging, but I consider it to be possible…..

No asynchronous beam dump Assume that spontaneous firing of one kicker magnet cannot be excluded Amplitude must be limited, say, to very few sigma (one or two) for one kicker -> many kicker magnets are required, each with a limited kick strength A similar failure case is considered for crab cavities of HL-LHC….. Space between beam tail and collimators required – need to be monitored and interlocked, similar for as for HL-LHC No direct retriggering of other kicker magnets Triggering a synchronous dump a little later can be considered At top energy, the total kick should be as small as possible…. Consequence if it goes wrong – what happens in case of asynchronous beam dump? Depending on consequences, one asynchronous beam dump in, say, 20 years might be acceptable for a downtime of, say, 2-3 month

HL-LHC: Gaussian beam collimated at 4  99.9% of protons collimator collimator Example: a collimator is positioned at 4 , and we assume a dipole magnet failure. The beam starts to move, assume by 1.7 . All particles beyond 2.3  are lost.

Asynchronous beam dump Wrong trigger to kicker magnets Minimum number of bunches to hit material at top energy Use orbit bump to reduce requirement on deflection angle for kicker magnets Minimum rise time At injection, lot of aperture is required At top energy, aperture requirements are much smaller Can this be used in the design of fast kicker magnets? Is it possible to make kicker magnets that close during the energy ramp such as collimators?

Asynchronous beam dump Maximise beam size: what is the maximum possible beta function at top energy? Change of optics in beam dump insertion during energy ramp could be considered – increase beam size at top energy Assume 25 ns bunch distance 5 us rise time = 200 bunches: difference of about 1 sigma / bunch 1 us rise time = 40 bunches: difference of about 5 sigma / bunch

Beam dumping block Beam size at exit window with sigma of about 4 mm (window of carbon should survive, to be confirmed) Corresponds to beta function of 400 km (why not?) 1m beta waist after 1000 m gives 1000 km Beam can be stopped in gas, water, …. some material that is not too dense