WATER for TEXAS Water for the Future

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

Sustainable Management of Rural and Small Systems Workshop Multi System Workshop.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
UPDATE on water resources management and infrastructure
City of Modesto FY Proposed Budget Utility Funds Utility Planning & Projects Public Works Finance.
WATER for TEXAS Water for the Future Carlos Rubinstein, Chairman Bech Bruun, Director Kathleen Jackson, Director.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
1 U.S. EPA State Revolving Fund: Providing Affordable Financing George Ames U.S. EPA IADF Conference on Financing Municipalities and Sub-National Governments,
KENTUCKY INFRASTRUCTURE AUTHORITY Office of the Governor Governor’s Office for Local Development 1024 Capital Center Drive, Suite 340 Frankfort, Kentucky.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
Water Conservation Annual Report. Mission Statement The mission of the Texas Water Development Board is to provide leadership, planning, financial assistance,
Elizabeth Fazio, J.D., LL.M. Director, House Natural Resources Committee Chick Bend at Sunrise, Brazos River near Kyle, Copyright © 2010 Photographs by.
Long Range Infrastructure Planning The Gilbert, Arizona Experience Kenneth C. Morgan, PE Public Works Director.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
1 Economic Recovery: Water Quality Infrastructure February 2009 State Water Resources Control Board Clean Water State Revolving Fund Program.
1 PLEASE NOTE: This information was presented during previous Economic Recovery Workshops. Since then, the information has been updated. Please refer to.
NC Water Resources Congress Annual Meeting Raleigh, NC October 30, 2014 State Water Infrastructure Update: The State of NC and Water, Wastewater and Stormwater.
Energy, Utilities, and Telecommunication Summer Study Committee Meeting September 2, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of.
KENTUCKY INFRASTRUCTURE AUTHORITY GOVERNOR’S LOCAL ISSUES CONFERENCE August , 2011.
Texas Water Development Board Financing Programs Presentation by Ignacio Madera, Jr. Office of Project Finance & Construction Assistance December 2, 2003.
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Texas Water Development Board and the State Water Implementation Fund for Texas (SWIFT) Doug Shaw Agriculture and Rural Texas Ombudsman.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
Department of Environmental Quality Water Infrastructure November 17, 2015 Water Infrastructure Funding to Financing.
1 PLEASE NOTE: This information was presented during the February 18, 2009 webcast of the Economic Recovery Workshop. Since then, the information has been.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Water and Wastewater Infrastructure Project Financing 1.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Loan Programs.  What is the PFA?  How does PFA financing work?  What is the Capital Financing Program?  What is the State Revolving Fund Program?
Dr. Andrew Sawyers, Director Office of Wastewater Management
Sustainable Water Infrastructure through Innovative Financing
RUSSELL - ROSSBURN WATER SUPPLY
Drinking Water State Revolving Fund and Performance Based Infrastructure Janet Cherry, PE Office of Drinking Water.
Welcome to the Green.Arkansas.gov Question & Answer Session
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Wisconsin’s Safe Drinking Water Loan Program
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Utah Water Conservation Forum – 5/12/2017
Finance and Governance Infrastructure Challenges in North Carolina
FY Proposed Budget and Rates
Agricultural Water Conservation Grants: Current Investments & Future Opportunities Winter Season Outlook and Impacts Forum for Agriculture in the Lower.
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Texas Water Development Board
Water Conservation in the 2016 Region C Water Plan
WATER for TEXAS Water for the Future
Strategic directions in the water industry
Joshua Basin Water District Draft Findings & Rate Scenarios
Water Conservation and Efficiency Projects for SWIFT Funding:
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Finance Options: Funding Water Infrastructure Projects George Bryan South Carolina Department of Health and Environmental Control State Revolving Fund.
Department of Environmental Quality
WATER POLICY And Management in AlabamA
ACEC Environmental Business &
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
SAFE, ABUNDANT WATER IS A PRIORITY FOR OKLAHOMA’S FUTURE Oklahoma Water Resources Board Infrastructure Financing Strategies Western States Water Council.
WATER RELATED INFRASTRUCTURE Programs & FUNDING IN KANSAS
Capital Improvement Plans
City of Sunrise Wastewater Reuse Program
Paul D. Jones II, P.E., General Manager August 25, 2016
The Small Communities Environmental Infrastructure Group of Ohio
The Wausau Wastewater Treatment Facility
Indiana Finance Authority (IFA)
Presentation transcript:

WATER for TEXAS Water for the Future Kathleen Jackson, Director

OUR MISSION To provide leadership, information, education, and support for planning, financial assistance, and outreach for the conservation and responsible development of water for Texas. -TWDB ultimate mission - (Texas Water Development Board – change noun to verb = “developing water for Texas”) -”Pray for Rain, Plan for Drought” -Goal: to address the state’s water needs to ensure a healthy & vibrant economy -Plan for kids / grandkids The Texas Water Development Board's (TWDB) mission is To provide leadership, information, education, and support for planning, financial assistance, and outreach for the conservation and responsible development of water for Texas.  Our mission is a vital part of Texas' overall vision and its mission and goals which relate to maintaining the viability of the state's natural resources, health and economic development.  To accomplish its goals of planning for the state's water resources and for providing affordable water and wastewater services, the TWDB provides water planning, data collection and dissemination, financial assistance and technical assistance services to the citizens of Texas.  The tremendous population growth that the state has and will continue to experience, and the continual threat of severe drought, only intensify the need for the TWDB to accomplish its goals in an effective and efficient manner.

PERCENT TIME IN DROUGHT

TEXAS DROUGHT April 2015 vs. April 2016

STATEWIDE RESERVOIR STORAGE August 3, 2016 85% full 84% full a year ago www.waterdatafortexas.org

PROJECTED TEXAS POPULATION GROWTH Texas Population (Millions) Decade

Brackish groundwater desal Seawater desal Aquifer storage and recovery HOW CAN WE RESPOND TO DROUGHT & GROWTH? Conservation Reuse Brackish groundwater desal Seawater desal Aquifer storage and recovery Aquifers Reservoirs

Conservation and REUSE Russell Schreiber Director of Public Works City of Wichita Falls Lake Arrowhead Tom Kula Executive Director, NTMWD John Bunker Sands Wetland Center Seagoville

REGIONAL WATER PLANNING GROUPS Region B (North Central) Region C (Northeast) Local Political Subdivision serves as administrator Public, consensus-driven Local/regional decision making process Region D (Northeast)

2017 State Water Plan

Conservation - 2017 State Water Plan Conservation makes up over one quarter of strategy supplies in 2070 Most frequently recommended strategy in the 2017 Plan Over $4 billion in capital costs Demand management (long-term conservation and temporary drought management restrictions) and reuse combined make up 45% of total strategy volumes.

ONLINE 2017 state water plan New tool – online state water plan Demonstrate the new interactive, online SWP that shows -the anticipated need (shortage) by decade -projects to address that need -the current source of water supply http://texasstatewaterplan.org

EXAMPLES OF PROJECTS REGION C IDENTIFIED TO ADDRESS POTENTIAL NEEDS -projects to address that need Most all entities are included in the state water plan. It’s important for the community to participate and have an active role in identifying current sources or supply, water needs, and strategies to address those needs or someone else will. Pro-active is important because water supply projects cannot typically be implemented quickly on a re-active basis when running out of water Pro-active is always cheaper than re-active Local engineers can help communities to identify the ‘trigger point’ for initiating the project

STATE WATER IMPLEMENTATION FUND FOR TEXAS Turns Planning into Projects

$900 million in financial assistance in 2015 (approximately) PROGRAM YEAR 2015 $900 million in financial assistance in 2015 (approximately) $3.9 billion in financial assistance (approximately) 20 project sponsors 30 projects $106 million in projected savings AAA rating 2016 SWIFT HIGHLIGHTS 795,255,000 financial assistance approved on 7/21/16 board meeting FOR 2016 program year 4.6 bill authorized to date (includes amount from 7/21 meeting) 15 additional commitments Turns Planning into Projects

Communities Served TWDB has committed over $19B in loans and grants since inception (1957) 2015/2016 SWIRFT Financial Assistance Total Funding Commitments* (Loans and Grants) Post-SWIRFT 1957 – December 2015 Multi-Year Financial Assistance Request* _______________ * Preliminary, subject to change ** Multi-year commitments include the 2015 financial assistance requests

WATER SUPPLY & INFRASTRUCTURE Water supply is not the only issue impacting communities Existing infrastructure is often an overlooked and neglected yet critical component to every community Large cities often develop a capital improvement plan (CIP) that addresses timely rehab or replacement of aging infrastructure. Our experience in meeting with smaller local communities across the State is that there often isn’t any kind of pro-active approach for replacement of infrastructure. Infrastructure replacement tends to be re-active.

INFRASTRUCTURE REHAB & REPLACEMENT Have you developed a Capital Improvement Plan (CIP)? Are you aware of existing infrastructure needs? Are you replacing infrastructure pro-actively rather than re-actively? INTERACTIVE SLIDE Take a poll of communities/engineers on whether they have developed a CIP It is incumbent on local officials and local engineers to evaluate existing infrastructure and needs associated with maintaining, rehabbing, or replacing aging distribution systems, collection systems, storage facilities, and water and wastewater treatment facilities. Many of the local elected officials may not even be aware of issues with existing infrastructure or the useful life of that asset and as such probably have not planned for replacement Development of CIP’s will prioritize project rehab and replacement. Local engineers and utility officials need to be able to communicate effectively to communities on the benefits of a project and ‘trigger point’ for needing to complete the project so that a community could plan appropriately and move forward on a pro-active basis instead of a re-active basis. Benefits can include increased revenues for the community and decreased operational costs due to improved operational efficiency, more efficient electrical equipment, less repairs and maintenance, less water loss, and accurate meter readings. These savings can offset some or most of the cost for financing the project. Pro-active is always cheaper than re-active. If a community does have a re-active project then a community with a CIP could look at expanding the project to include some needed pro-active improvements.

TWDB PROGRAMS Turns Planning into Projects Water Development Fund (DFund) Economically Distressed Areas Program (EDAP) Drinking Water State Revolving Fund (DWSRF) State Participation (SP) State Water Implementation Revenue Fund for Texas (SWIRFT) TX Agricultural Water Conservation Bond Program Clean Water State Revolving Fund (CWSRF) Rural Water Assistance Fund (RWAF) Mention TWDB financing programs Describe the programs the Board has for financing these type infrastructure projects. Note that the ALL of these programs can be accessed at any time except SWIFT and EDAP It is important for the local engineer or utility official to know the TWDB has multiple options for financing these projects. Turns Planning into Projects

TWDB Challenges in past that have now been addressed: TWDB Changes/Improvements One Point of Contact – Regional Teams with Team Manager Streamlined Environmental Review Ability to Obtain Release of Funds Developed an online application to make it easier to apply for TWDB loans Online State Water Plan

REGIONAL WATER PLANNING GROUPS & twdb regional TEAMs OUTREACH - Changes/Improvements -A Team Manager is their single point of contact to help discuss and guide them to the appropriate financing program(s) Point of Contact Communities and engineers did not have a single point of contact when trying to evaluate funding programs available from the Board.  This required the applicant and its consultants to know the benefits, incentive, and differences between the various TWDB funding options or to contact multiple people at the TWDB.  The agency reorganization has been a huge success in customer service by providing a single point of contact that can assist and guide applicants and their consultants through the multiple funding options to find the best or sometimes combined funding options for developing projects.  We can also help identify the potential cost savings for using the various programs compared to a market issue.

TWDB FIELD OFFICES Lubbock Mesquite Harlingen Houston

Streamlined Environmental Review TWDB Changes/Improvements Replace guidance documents with template forms Ensure that level of review is commensurate with potential impacts Develop new process for federal cross-cutter compliance Clarify requirements

Ability to quickly Obtain Release of Funds TWDB Changes/Improvements Outlay Excel Template Through the SRF programs, there were often delays in an applicant completing outlays and obtaining the release of funds.  The TWDB has updated and streamlined this process since the reorganization.  The agency now provides an outlay template (an excel spreadsheet) with instructions to each entity receiving SRF funds.  This process is used for documenting expenses and requesting the release of funds for all programs except DFund, RWAF, and SWIFT.  The TWDB is able to release funds in less than 14 days from receipt of the outlays.  This allows entities that submit outlays after receiving invoicing from contractors on construction projects to obtain the funds to pay the contractors promptly without needing to use any local funds. TWDB releases funds in <14 days from receipt of outlays Enables communities to pay contractors without using local funds

ONLINE LOAN APPLICATION TWDB Improvements https://ola.twdb.texas.gov

TWDB Funded projects in North East Texas Arlington Collection System Improvements 2015 Replace 16,525 linear feet of 6 and 10-inch pipelines with 8 thru 12-inch diameter pipe in five different segments throughout the City Proposed work is 100% eligible for Green Project funding Clean Water State Revolving Fund; $2,439,700 loan and loan forgiveness (CWSRF) Arlington TX

TWDB Funded projects in North East Texas Fort Worth Conservation - Advanced Metering Infrastructure Project Planning and construction funds to implement a full scale Advance Metering Infrastructure (AMI) project along with an automated leak detection system An annual volume of approximately 9,450 acre-feet/year is anticipated to be saved as a result SWIFT; $ 76,000,000 loan Fort Worth TX

TWDB Funded projects in North East Texas Euless Bear Creek Reclaimed Water System Extend services to additional commercial and residential customers along waterline alignment Eliminates the use of potable water for irrigation along new waterline, reducing the City’s demand for potable water Clean Water State Revolving Fund $2,755,300 in loan and loan forgiveness (CWSRF) Euless TX

TWDB Funded projects in North East Texas Sulphur Springs Wastewater Treatment Plant Upgrade Existing WWTP required upgrades to address compliance issues and maintain treatment standards Exceeded limitations for residual chlorine and ammonia Project included new aeration basins and SCADA upgrades $18,200,000 commitment through Clean Water State Revolving Fund (CWSRF)

TWDB Funded projects in North East Texas Alba Wastewater Treatment Plant Improvements Aging wastewater treatment plant Not meeting effluent limitations Rehabilitation includes removal of vegetation and sludge Floating aerators and disinfection also added $840,000 commitment through Texas Water Development Fund (DFund) Alba TX

TWDB Funded projects in North East Texas Paris Water Line Replacement Old, deteriorated water lines throughout distribution system Frequent leaks and breaks require constant repair Project replaces nearly 6 miles of water line between 40 and 100 years old $3,400,778 project commitment through Drinking Water State Revolving Fund (DWSRF) Project qualified for partial principal forgiveness

HOW CAN TWDB ASSIST MOVING PROJECTS FORWARD? Concerns in using TWDB for funding of projects? Challenges for utilities to move forward? Need for upgraded infrastructure? Feedback? COME TALK TO US FIRST! INTERACTIVE SLIDE Direct interaction with the board members - a board member will now come to you If want to think of responses to these questions, I will come back and meet with you individually GOAL – COME TALK TO US FIRST if you have a project and are seeking financing. You are certainly welcome to go out on the market, but come talk to us first

TWDB Regional Financial assistance workshops

TEXASFLOOD.ORG

Save the date!

BUILDING A STRONGER TEXAS Fort Worth April 18, 2016 Austin April 19, 2016 Midland April 21, 2016 Corpus Christi June 7, 2016 Rio Grande Valley June 15, 2016 Lubbock – Caprock June, 23, 2016

HOW TO CONTACT ME Kathleen Jackson, P.E. @twdb_kathleen 512.463.7847 Kathleen.Jackson@twdb.texas.gov www.twdb.texas.gov