Some General Guidelines for the US TBM Costing

Slides:



Advertisements
Similar presentations
What is Dual Coolant Blanket? Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University of California, Los.
Advertisements

US TBM Activities Update 1- Quick background 2- Recent Activities Mohamed Abdou FNST Meeting held at UCLA, August 2-4,
US TBM Activities and Collaboration Discussion Mohamed Abdou FNST Meeting held at UCLA, August 18-20, 2009.
US TBM Meeting INL, August 10-12, 2005 B. J. Merrill and D. A. Petti Fusion Safety Program Safety and Tritium R&D.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
Suggested US Plans and Strategy for ITER Test Blanket Mohamed Abdou Presented at APEX/TBM Meeting, UCLA, November 3-5, 2003.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
The effect of the orientations of pebble bed in Indian HCSB Module Paritosh Chaudhuri Institute for Plasma Research Gandhinagar, INDIA CBBI-16, Sept.
Strawman R&D Tasks and R&D Costs Neil Morley and Alice Ying INL, August
DCLL R&D Task Area Reports Compiled by Neil Morley for the TBM Conference Call Oct 6, 2005.
WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.
DCLL PbLi Loops Design and Fabrication Plan and Cost B. A. Pint ORNL.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
Special assignment, OFES, USA 1 ITER, Cadarache, January 26, 2007 Clement Wong, General Atomics, USA Valery Chuyanov, Chang Shuk Kim, at this time the.
1 U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, Overview of R&D, Time Schedule, and Cost Estimation M. Abdou (25 min.) 2.Possible.
1 VLT Research Highlights ITER Test Blanket Module (TBM) M. Abdou and the ITER-TBM Team Outline 1.Introduction and TBWG activities 2.Technical planning.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Solid Breeder Blanket R&D and Deliverable TBM Costing Kickoff Meeting INL, August 10-12, 2005 Presented by Alice Ying.
Tritium Extraction from a DCLL Blanket Prepared by: Scott Willms (LANL) Collaborators: Brad Merrill (INL), Siegfried Malang (Consultant), Clement Wong.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
Pacific Northwest National Laboratory U.S. Department of Energy Initial Cost Estimates for Development of DCLL TBM Ferritic Steel Structural Components.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame.
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
Background information of Party(EU)’s R&D on TBM and breeding blankets Compiled and Presented by Alice Ying TBM Costing Kickoff Meeting INL August 10-12,
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
US ITER TBM DCLL ITER-TBM Plan and Cost Summary PbLi Flow Channels He-cooled First Wall PbLi He SiC FCI 2 mm gap US DCLL TBM – Cutaway Views 484 mm US.
CLIC08 workshop Cost requirements for CLIC H. Braun, G. Riddone
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
ITER TBM MEETING March UCLA DCLL Module Design Prepared by M. Dagher UCLA P. Fogarty ORNL.
Overview of the US ITER Test Blanket Module (TBM) Technical Plan
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
1 Statements of Work – Getting Them Right!!. 2 Today’s Agenda A.The Basics B. Sources of Information C. Scenario #1: Procurement is in the loop D. Scenario.
Lab 7: Midsemester Checkpoint User Interface Lab: GUI Lab Oct. 9 th, 2013.
Principal Investigator ESTCP Selection Meeting
US Participation in the
Statements of Work – Getting Them Right!!
By Wilmer Arellano Spring 2010
Overview of Fusion Blanket R&D In Japan
Potential Tritium Processing/Control Needs for US ITER TBM
Introductory Remarks and Meeting Goals
Material Issues for the US ITER-TBM Program
DCLL TBM Reference Design
Principal Investigator ESTCP Selection Meeting
ITER Test Blanket Module (TBM)
Modeling and Laboratory Experiments
Phase 3 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005
TBM Mockup testing at SNL
Current Status of Chinese HCCB TBM Program
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
Phase 2 Tollgate Review Discussion Template
VLT Meeting, Washington DC, August 25, 2005
Remarks on US Costing Activities for the US ITER-TBM
Mohamed A. Abdou Summary, Approach and Strategy (M. Abdou)
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
Principal Investigator ESTCP Selection Meeting
Effective Project Management: Traditional, Agile, Extreme
Project Management Considerations
ITER-TBM Planning and Costing Meeting
Principal Investigator ESTCP Selection Meeting
Compiled by Neil Morley for the TBM Conference Call Nov. 17, 2005
Synthesis of the PFD from the Generic BFD
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Presentation transcript:

Some General Guidelines for the US TBM Costing Cost for the Reference Case Cost is for the period between now and the shipment of the TBM deliverables (Test articles and ancillary equipment) in 2015 for DAY ONE ITER operation. The period is 10 years from 2006 to 2015 The cost is the total cost for the TBM project (based on the Reference designs/deliverables) including R&D, design, engineering, fabrication, qualification, etc., as well as the cost of interface with ITER and other parties. The deliverables are based on the Reference Designs described in the Design Summary Documents. The DCLL Reference Case has a PbLi exit temperature of 470ºC and a test module that occupies half a port. For the HCCB: submodule that has a size of 1/3 of one-half port and uses the EU (or Japan) first wall/box (first wall/box is not part of the US deliverables) The R&D Cost includes all costs related to the reference design that occur within the next 10 year period whether they are related to the first (Day ONE) Test Articles or subsequent test articles. But the Cost of the deliverables includes only the cost of the First Test Article and associated equipment. The US effort should take advantage of the R&D efforts in other parties. R&D performed by other parties and available to the US should, in general, not be duplicated by the US and should be costed separately. Cost estimates should state clearly what R&D done by the other parties is essential to the US TBM project.

Test Blanket “Project” Deliverables DRAFT 1.8.1 DCLL Test Module Helium Flow Loop (primary) PbLi Flow Loop Tritium Processing Systems Secondary Helium Flow Loop (and Heat Exchanger for PbLi Flow Loop) 1.8.2 HCCB Test Submodule Ancillary Equipments (primary helium flow conditioners, measuring systems for helium, tritium, and test submodule)

US Test Blanket Work Breakdown Structure [DRAFT] The R&D described in the WBS is required to gain critical REFERENCE case data required to design, fabricate and operate test module/submodules that achieve their experimental goals related to understanding simultaneous tritium generation and high grade heat extraction, as well as to satisfy ITER safety and qualification criteria. The R&D for the higher performance TBM is developed under TBM Base Program R&D.

Responsible person for base cost estimate for WBS Levels 3 and 4 Use template on slide 7 for base cost estimate Base cost estimate would include: Labor hours, rates Material and Equipment (procurements) Travel

1.8.1 DCLL Oct. base cost estimate to be filled by the proposed responsible person

1.8.2. HCCB Oct. base cost estimate to be filled by the proposed responsible person

Costing Input Table WBS Title: Provided by: Use this sheet for base cost estimate One sheet for each WBS Level 6 or below WBS Title: Provided by:

draft

2005-2015 HCCB Schedule (DRAFT)