Wednesday 3rd October - morning

Slides:



Advertisements
Similar presentations
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Advertisements

:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 5th September - morning
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Tuesday 22nd January - morning
LHC Morning Meeting - G. Arduini
Coordination: Gianluigi Arduini & Jan Uythoven
Wednesday 31 October: Morning
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday 31st August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
Wire almost entirely through beam before BLM triggers dump
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Monday 3rd September - morning
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Cold compressor speed S45
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Monday 10th December - morning
Wednesday 26 October 2011.
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Friday :47 stable beams fill 3273
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wednesday 6.10 Morning: Quench test at 450 GeV
Tuesday
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Monday 152 bunch operation summary
Tuesday
Presentation transcript:

Wednesday 3rd October - morning 12:15 Fill 3126 dumped by RQF.A45 QPS trigger 113 pb-1 in 6h22m Ramp down & the access: cryogenics in triplet R2 BI in point 4 (BSRT/BSRA) exchange of RQTD.A45 power converter in point 4 vacuum interlock reset in point 4 BI (BRAN in point 8) BI (BLM diamonds) in point 8 ATLAS TOTEM and QPS in point 5 Ventilation door S23 – thanks RP QPS into S81 for a local power cycle on controller of RB.A81. 4-10-12 LHC status

BSRT B2 intervention summary re-checked full alignment with calibration laser. Laser spot found at camera centre exactly with last steering values used for beam --> no evidence of optical line misalignment after TS#3 steering mirror (first mirror after viewport, only optical line mirror not used for imaging calibration target) replaced with new mirror even though there was no evidence of scratches or dust on the mirror. All this would exclude any possible cause for the image distortion apart from the BSRTM mirror (in vacuum) or some mechanical misalignment of the BSRTM itself. TBC when beam is back. Federico Roncarolo and team 4-10-12 LHC status

And… AGM B1 intervention summary BQBBQLHC found (and corrected) wrong cabling of the attenuation filter wheel. This would explain the unexpected factor 200 less in light intensity at AGM PM after TS#3. TBC when beam is back. BQBBQLHC Deployed new version of FESA process which fixes a bug in new bunch gating functionality added during TS. Stephen Jackson, Marek Gasior & Ralph Steinhagen 4-10-12 LHC status

Wednesday 3rd October - evening 17:25 Access finished – start pre-cycle 19:00 probes in B2 injection steering bad; steering required in TI8 problems with the vertical QFB on B2; although chirping at 3% the Q-stability doesn't improve and therefore the QFB keeps switching off...Ralph adjusted the chirp windows for B2 Injecting1.6e11 ppb 21:30 Start ramp 22:35 Stable beams fill 3128 Initial luminosity: 6.42e33 cm-2s-1 A. Boccardi verified the signal of the BSRA on B1 at FT and confirmed that the acquisition works well. initiated a gently cleaning after declaring SB and could get the level below 1e10. 4-10-12 LHC status

Wednesday to Thursday 22:51 Beams dumped by: 01:40 Injecting probes RCBH29.R6B2 tripped on communication fault Caught by software trigger was on "out of tol BPM“ PC taken out of operation 01:40 Injecting probes 03:50 Stable beams fill 3129 Injected 1.63e11 ppb Initial luminosity: 6.72e33cm-2s-1 83 pb-1 delivered Beams dumped at 08:25 – cryo: lost communication with main refrigerator point 4 Lost cold compressors – first estimate 10-12 hours to recover 4-10-12 LHC status

Vacuum at injection 4-10-12 LHC status

Miscellaneous Scrubbing run postponed until before MD4 following discussion in LMC yesterday afternoon V2.5 of LHC schedule on the web New MD schedule available (FZ/GP) – start MD 08:00 Monday, dump beams at 06:00 EOF: Bunch length variation OD Batch by batch blow-up TOTEM in during Stable beams Follow-up Défaut PLC vide QRL en UJ76: PLCS_UJ76_1 replaced 4-10-12 LHC status