Workshop on preparations for ANConf/12 − ASBU methodology

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
Chapter 6 Sub-Group ICAO Headquarters, November 2013
System Wide Information Management
The Larger Picture – an ICAO Update Michael Hohm Secretary AIS-AIMSG
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
ICAO: Global Harmonization Plan
Information Management Panel Update
Information Management The ICAO Perspective
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
AIS-AIMSG/12 Briefing to ANC 23 October 2015
CANSO AIM WG Activities
Workshop on preparations for ANConf/12 − ASBU methodology
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
AIS-AIMG/1-SN No.6.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Collaborative Decision Making (CDM) Saulo Da Silva
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
System Wide Information Management
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
AIM Operational Concept
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/7
Workshop on preparations for ANConf/12 − ASBU methodology
Global ATM Operational Concept
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Trajectory-Based Operations(TBO) Saulo Da Silva
Measurement of environmental benefits Saulo Da Silva
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Workshop on preparations for ANConf/12 − ASBU methodology
Dynamic wake turbulence separation Saulo da Silva
Presentation transcript:

Workshop on preparations for ANConf/12 − ASBU methodology SIP/2012/ASBU/Nairobi-WP/17 AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Nairobi, 13-17 August 2012)

ICAO SIP 2012 - ASBU workshops Overview What we have been doing What we are doing What will we be doing next ICAO SIP 2012 - ASBU workshops

What we have been doing….. 2008 NextGen / SESAR Conference in Montreal AIS-AIMSG/1 2009 Gap Analysis of NextGen/SESAR/ICAO AIS-AIMSG/2 AIS to AIM transition roadmap 2010 Harmonisation of NextGen and SESAR Introduction of CARATS AIS-AIMSG/3 Amendment 36 to Annex 15 ICAO SIP 2012 - ASBU workshops

What we have been doing….. 2011 AIS-AIMSG/4 Development of Amendment 37 to Annex 15 GANIS Initiate work to integrate AIM into Global ATM AIM Operational Concept SWIM integration ICAO SIP 2012 - ASBU workshops

AIS to AIM Roadmap - 3 Phases Consolidation Going Digital Information Management ICAO SIP 2012 - ASBU workshops

AIS to AIM Roadmap - 21 interrelated steps The roadmap comprises 21 interrelated steps that will establish the foundation for a SWIM, from implementation and use of current provisions until the integration of the flight and flow of information in a collaborative environment. ICAO SIP 2012 - ASBU workshops

Current ICAO Provisions SARPS Guidance Material ICAO SIP 2012 - ASBU workshops

Detailed specifications Annex 15 Requirements Detailed specifications General Requirements AIP Format AIP SNOWTAM Format NOTAM ASHTAM Format AIRAC AIRAC Contents AIC NOTAM Distribution System Pre and post flight information NOTAM Format Telecommunication Requirements Data Quality eTOD Terrain and Obstacle data ICAO SIP 2012 - ASBU workshops

PANS-AIM Contents might include Provisions, procedures, practices and formats applicable to: AIP NOTAM, SNOWTAM, ASHTAM AIRAC Data acquisition Data quality Integrated briefing Inter-service communication ICAO SIP 2012 - ASBU workshops

Developing the AIM Framework Annex 15: Amendment 37 (2013) Introduce AIM elements Amendment 38 (2016) Fully restructured Global AIM Operational Concept IM Roadmap GANP PANS-AIM (2016) ICAO SIP 2012 - ASBU workshops

AIM Provisions Framework Document Function and Content Primary Audience Annex 15 Requirements and performance specifications States PANS-AIM Procedures, processes, formats, technical specifications States and service delivery organizations AIS (AIM) Manual Best practices; guidance on application and implementation Service delivery organizations ICAO SIP 2012 - ASBU workshops

Structural Implementations – The bigger picture Global ATM Operational Concept has a target implementation horizon of 2020-2025 ATM requirements expand the OC and provide the basis for ATM development ICAO SIP 2012 - ASBU workshops

ATM Operational Concept 7 inter-related concept components Describes a “vision of achievable benefits” Information is a overarching dimension linking all components CDM is a key process ICAO SIP 2012 - ASBU workshops

Information is the key enabler The delivery of timely, quality assured information as needed across: Multiple Domains Multiple Providers Multiple users Multiple applications Multiple communication modes Multiple Modernization Programs ICAO SIP 2012 - ASBU workshops

Planning and development is underway A number of planned implementations…… ICAO SIP 2012 - ASBU workshops

Operational Demonstration Validations Aviation System Block Upgrades Global Build 1 Global Build 2 Global Build 3 Operational Demonstration Validations The foundation of the blocks originates from existing, near term implementations, and access to the benefits that already exist in many regions of the world. The intent is to apply key capabilities and performance improvements across other regional and local environments with the same level of performance and associated benefits worldwide. The block upgrades will allow a structured approach to meet the needs of the individual aviation communities worldwide, while considering the associated business cases. 2011 2020 ICAO SIP 2012 - ASBU workshops

Possible AIM integration…. Performance Improvement Areas Block 0 (2013) Block 1 (2018) Block 2 (2023) Block 3 (2028 & >) Globally Interoperable Systems and Data Information Management Based on AIXM Improved Information Management Full FF-ICE System Wide Information Management (SWIM) Airborne Access to SWIM Here is an example using some of the blocks for one PIA Ground-Ground Integration Through ATS Inter-facility Data Communication (AIDC) Ground-Ground Integration Through Advanced ATS AIDC and FF-ICE/1 Before Departure Ground-Ground Integration: (FF-ICE/1 and Flight Object, SWIM) etc. etc. etc. etc. ICAO SIP 2012 - ASBU workshops

Possible AIM integration….FPL Amendment 1 to PANS-ATM 15th Edition - FPL The changes were announced by ICAO in 25 June 2008 and will become applicable on 15 November 2012 Necessary to allow ATM systems to make optimum use of advanced aircraft capabilities already onboard the aircraft Is one step towards a completely integration of the aircraft to the ATM system as envisaged in the Global ATM Operational Concept ICAO SIP 2012 - ASBU workshops

Possible AIM integration….FPL Flight planning environment Transition Strategy Checklist Tasks Implementation guidelines Conversion of new items to present items Flight Plan Implementation Tracking System (FITS) ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops In Summary….. Current roadmap leads to digital AIS services New functions, products, and services are in the process of identification New roadmap will extend from the current one and be incorporated into the GANP Delivery of full IM should allow for flexible applications New FPL as one step ICAO SIP 2012 - ASBU workshops

In summary - Milestones Date Event Milestone 20-23 Sept 2011 GANIS Industry feedback on : ASBUs AIM concept with Roadmap and PANS-AIM 15 Nov 2012 FPL States/ANSPs/Airlines using ne FPL functions 19-30 Nov 2012 ANC 12 Present Global AIM and SWIM concept and outline of ICAO provisions (SARPS and PANS) Agreement of the first series of block upgrades GANP Nov 2013 Annex 15 Amendment 37 Sept 2014 MET – AIM Divisional meeting Present draft PANS-AIM and Annex 15 provisions Nov 2016 Annex 15 Amendment 38 PANS-AIM 1st edition ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops