100th meeting Ties Behnke, DESY

Slides:



Advertisements
Similar presentations
TIME 2005: TPC for the ILC 6 th Oct 2005 Matthias Enno Janssen, DESY 1 A Time Projection Chamber for the International Linear Collider R&D Studies Matthias.
Advertisements

Snowmass 25 AugustMark Thomson 1 PFA Progress and Priorities Mark Thomson (for Steve Magill, Felix Sefkow, Mark Thomson and Graham Wilson)  Progress at.
Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
The GLD Concept. MDI Issues Impact on Detector Design L*  Background (back-scattered e+-, , n) into VTX, TPC Crossing angle  Minimum veto angle for.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
1 The ILD LoI IDAG Referees for ILD Benchmarking – J.A. Hewett, W.G. Li Tracking – R. Nickerson Calorimetry – D. Green MDI – T. Himmel.
111 ILD LOI Part-II: Detector Y. Sugimoto KEK for ILD concept group.
Mark Thomson University of Cambridge  LoI loose ends  New physics studies?  What next... Future Plans… This talk:
R&D status of FPCCD VTX and its cooling system Yasuhiro Sugimoto for FPCCD VTX group 1.
Silicon Tracking Systems in Mokka Framework Valeri Saveliev, Obninsk State University.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
Summary of Simulation and Reconstruction Shaomin CHEN (Tsinghua University)  Framework and toolkit  Application in ILC detector design Jupiter/Satellites,
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
International Workshop on Linear Colliders, Geneve Muon reconstruction and identification in the ILD detector N. D’Ascenzo, V.Saveliev.
ILD Optimization Why – when – what Ties Behnke, DESY Henri Videau, LLR.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Optimizing the SiD Detector - mainly a calorimeter perspective Andy White SiD Advisory May 5, 2008.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
“Huge” Detector Concept 3 Sep 2004 ECFA LC Durham Satoru Yamashita ICEPP, University of Tokyo On behalf of many colleagues Towards our common.
SiD Detector Baseline (A brief review) Andy White University of Texas at Arlington.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
07/03/2008 Ron Settles MPI-Munich TPC B-field1 On the Magnetic-field Requirements for the LC TPC OUTLINE of TALK Status of Discussion.
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
LCWS11 – Tracking Performance at CLIC_ILD/SiD Michael Hauschild - CERN, 27-Sep-2011, page 1 Tracking Performance in CLIC_ILD and CLIC_SiD e + e –  H +
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
ILD meeting Thursday May 30, 2013 Ties Behnke, Yasuhiro Sugimoto.
SiD Vertexing and Tracking Contribution to the LOI Bill Cooper Marcel Demarteau Ron Lipton Rich Partridge Dong Su For the SiD Vertex/Tracking Group SiD.
Palaiseau, 13/1/ 2005 P. Colas - Optimising tracking 1 Optimising a Detector from the Tracking Point-of-View P.Colas, CEA Saclay constraints role Optimisation.
12/20/2006ILC-Sousei Annual KEK1 Particle Flow Algorithm for Full Simulation Study ILC-Sousei Annual KEK Dec. 20 th -22 nd, 2006 Tamaki.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size; ~6mm x 6mm Full.
Eunil Won/Korea U1 A study of configuration for silicon based Intermediate Trackers (IT) July Eunil Won Korea University.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
TPC for 4-th concept S.Popescu IFIN-HH, Bucharest.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
SiD R&D Plan and Opportunities for New Collaborators
Final CALICE OsC meeting: Status and summary of project
ILD status report Yasuhiro Sugimoto KEK for the ILD concept group
ILD Technical Coordination
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
A Detector for the ILC Ties Behnke, DESY.
Felix Sefkow DESY LDC at Vienna November 17, 2005
Layout of Detectors for CLIC
SiD Calorimeter R&D Collaboration
Strategy Ties Behnke
CLIC detector at SiD meeting 28/3/2010
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
ECAL project in the future 2-3 years
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Detectors for Linear Colliders - ILC and CLIC -
Why do we want a TPC? P. Colas, CEA Saclay
ILD Optimisation: towards 2012 University of Cambridge
Linear Collider Simulation Tools
ILC Detectors and their R&D GDE meeting Frascati
ILC Detector Technology
Detector Optimization using Particle Flow Algorithm
Why do we want a TPC? P. Colas, CEA Saclay
Detectors for future accelerators
Linear Collider Simulation Tools
Background Concept Results Conclusions
Sheraton Waikiki Hotel
What does it change for ECAL design ?
Presentation transcript:

100th ILC@DESY meeting Ties Behnke, DESY 18.10.2013 ILD Status 100th ILC@DESY meeting Ties Behnke, DESY 18.10.2013

ILD: where are we? 2013: delivery of the ILD DBD as part of the ILC TDR Fairly sophisticated system design, no complete engineering design First “complete” estimate of the cost 2013: site decision in Japan, but no overall decision yet on the project 2013: positive statements around the world supporting an ILC in Japan, European strategy process Snowmass process in the US We are in a transition period between pre-project (concept) phase and project (collaboration) phase For the near future R&D will remain our main goal, but we need to prepare to shift gears rapidly once the project is approved.

Experimentation at the LC Concepts at the ILC SiD is first proposed at ALCPG LOI phase TDR/ DBD phase 1998 2001 2003 2004 2006 2007 2009 2009 2013 TESLA and GLD detectors publish first documents TESLA TDR Detector concept reports: LDC, GLD, SiD, 4th LOI delivered DBD/ TDR delivered SiD, ILD validated WWS starts concept studies LDC and GLD merge into ILD Ties Behnke, 3.9.2013 Experimentation at the LC

The current ILD concept Started as a combination of GLD and LDC in 2007 (LCWS 2007 at DESY) Some detailed optimization work done, but main parameter choices were “ad hoc” (politics) as much as physics driven Now is the time to re-open the box and look at all choices: There are no forbidden areas There are no prejudices

Window of Opportunity Situation in Japan: see talk by Satoru/ Hitoshi later today. Window of opportunity NOW We might have some limited time to Look carefully into our fundamental design choices Take costs more fully into account than we have done so far Question Choices and prejudices Do fundamental studies on – in particular – the impact on physics Once ILC is a real project we might not have this chance again! Lets use it wisely!

ILD Costs Costing exercise as part of DBD Needs significant more work and checking, but main messages are clear. Huge effort by LLR group for the DBD

ILD cost scaling Cost scaling law with different systems radius Potentially large impact on the cost Careful optimization of cost –performance benefit is needed

The inner system Do we understand our performance requirements? VTX detector Silicon tracking? Readout speed might be an important variable to control background and complexity: Are the ambitious enough in ILD in this respect? Do we understand / do we have a proper design of the beamtube etc? We propose a big Silicon system for ILD: are we sure of its parameters? What about the outer Silicon system? How much of this is baseline? Design of the VTX detector Role and merrit of double layer Alternative geometries?

Experimentation at the LC Vertex detector Excellent impact parameter resolution better than (5⊕10/p sin3/2 Θ ) μm is required for efficient flavor tagging 3 layers of double ladders (ca 1 mm apart) (6 pixel layers) Effect on pair-background rejection is expected, but not demonstrated yet Barrel only: |cosΘ|<0.97 for inner layer and |cos Θ |<0.9 for outer layer Point resolution <3um for innermost layer Material budget: 0.3%X0/ladder=0.15%X0/layer Sensor options: CMOS, FPCCD, DEPFET, others? Ties Behnke, 3.9.2013 Experimentation at the LC

Experimentation at the LC TPC: ILD Time Projection Chamber: The central tracker of ILD Tracks can be measured with many (~200/track) 3-dimensional r-f-z space points srf<100um is expected for all drift distances dE/dx information for particle identification Two main options for gas amplification: GEM or Micromegas Readout pad size ~ 1x6mm2  106 pads/side Pixel readout R&D as a future alternative Material budget: 5%X0 in barrel region and <25%X0 in endplate region Cooling by 2-phase CO2 Momentum resolution: 2 10^-5 Ties Behnke, 3.9.2013 Experimentation at the LC

Tracking System Momentum resolution: Current parameter is strongly driven by Higgs Mass measurement: are these arguments still valid? If we can relax the requirements: what is the impact on TPC/ Silicon? Complex interplay of TPC, inner and outer Silicon Overall system optimization: Aspect ratio Outer radius Role of Silicon Role of material e.g. in the TPC system Forward tracking

Tracking System Momentum resolution: Current parameter is strongly driven by Higgs Mass measurement: are these arguments still valid? If we can relax the requirements: what is the impact on TPC/ Silicon? Complex interplay of TPC, inner and outer Silicon Purity of ZH->llcc Overall system optimization: Aspect ratio Outer radius Role of Silicon Role of material e.g. in the TPC system Forward tracking

Material And never forget: Material issues System thickness Silicon tracker - ECAL/ HCAL thickness TPC tracker - choice of material?

Material And never forget: Material issues System thickness SiD material: this might be aggressive, but we are not - ECAL/ HCAL thickness better… - choice of material? And never forget:

Questions: a possible list What is the right outer diameter for the VTX? Are we confident about performance in the forward direction What is the minimum momentum we need to reconstruct Does the data size have an impact on design of the VTX? Where do we need highest momentum resolution Higgs mass, invisible higgs, branching ratios? How important are systematic effects to the final performance Do we understand possible biases in the momentum estimation Do we understand the relative roles of TPC and Silicon? What is the impact of material on the physics performance Barrel Endcap

Pflow as a driving force Pflow has been at the core of the definition of ILD Size Calorimeter performance Tracking performance

Pflow: Impact W/Z separation: Key ingredient to define the requirement on particle flow performance Impact on actual physics studies: typically less clear than thought: Most studies show little to no sensitivity to the exact performance But: how poorly do we do with a significantly deteriorated particle flow performance?

Imaging Calorimeter Calorimetry is clearly a main part of ILD Can we make our calorimeter cheaper? Can we make the step from ECAL to HCAL less severe? Can we find an intelligent way to stage the system? Si for the ECAL is a very attractive, but also very expensive option

Overall Detector size Other constraints: Outer radius of Yoke: Defined from push-pull condition on field < 50 mG Is this the correct requirement Changing this will have a huge impact on size (and cost)

ILD Organisation The Plan: At the ECFA meeting May 2013: Proposed and discussed new structure for ILD At Cracow: iterate the organisation structure, further disucssions are needed LCWS 2013: initiate the new ILD structure formally. Document describing the new structure is on the indico WEB site under the Thursday meeting Comments are welcome.

Institute Assembly Speaker (2) ILD operations board (>20) ILD Management group (4) Physco, detco, 2 free members Detector Coordinator Physics Coordinator Publication office Central design group Software/ Tools top DAQ MDI Integration Documentation Higgs …. … SI TPC VTX Central groups FCAL HCAL ECAL Detector systems groups organize the connection to the R&D collaborations muon Coil/ Yoke

ILD We have a good and clear starting point The next step will be a re-optimization of the detector We will need to make sure that we have an adequate and appropriate structure.