Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.

Slides:



Advertisements
Similar presentations
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Advertisements

Project management Information systems for management1 Project Management.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
1 【 1 Project description and implementation method 】 1.1. Project description (including implementation method) Trends of Regulations and Nuclear.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Alternative Project Delivery
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
Systems Analysis and Design 9th Edition
Team work : Jehad Khalaf Ehab Esheach Raed Shehada Khalil Abu Eed Supervisor: Dr. Kamalin Shaat Team work : Jehad Khalaf Ehab Esheach Raed Shehada Khalil.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
PREPARED BY: Mohammed Tanbora SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
Project Management Session 7
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
The Importance of the Qualifications Based Selection (QBS) Process
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
FUNDAMENTALS OF PROJECT MANAGEMENT. Need of Project Management Projects worth billions of rupees undertaken every year. Effective management has bearing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
CIS 321—IS Analysis & Design Chapter 3: The Analyst as a Project Manager.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
King Fahd University of Petroleum & Minerals
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
WEEK 3 Project Planning.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
PERSONAL SERVICE CONTRACTS MEMORANDUMS OF AGREEMENT PROCESS Amy Monroe, Procurement Teri Mason, Budgets Thelma Hawkins, Grants Management Karen Wirth,
 P lanning is an intellectual process, consicous determination of courses of action, the basing of decisions on purpose, facts and considered estimates.
CHAPTER 2 SYSTEM PLANNING DFC4013 System Analysis & Design.
Chapter 3 Managing the Information Systems Project
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
Project Management Systems
Procuring Professional Services
Procurement Management
Systems Analysis and Design in a Changing World, 4th Edition
Project life span.
TOPIC-8A- PROJECT TIME CONTROL
Costs and Economics of Construction
(Additional materials)
Under supervision of: Eng. Reema Nassar
Developing and Issuing the RFP
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
2018 CompTIA PK0-004 Study Guide Killtest
Request for Proposal & Proposal
PROJECT DELIVERY METHODS
Design-Build Acquisition and Contract Incentives July 19, 2018
ENGINEERING MANAGEMENT (GE 404)
Design-Build Acquisition and Contract Incentives May 9, 2019
Second Avenue Subway Project Execution Strategy
Time Scheduling and Project management
Tips For Working With A General Contracting Company
Presentation transcript:

Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi

Local Contractors The Professional construction manager must develop a representative list of qualified contractors of each proposed bid package List should be: Large enough to ensure competition Small enough to create significant interest in all bidders

Local Contractors Some owners require strict financial qualifications where other owners will depend upon the professional construction manager to screen potential bidders Preliminary lists of prospective bidders should generally be developed before financial screening

Local Contractors Several Days early in the planning stage can be allowed for scheduling short individual meetings with all interested contractors. The meeting is conducted to accomplish: Explain the overall program of project Review the preliminary procurement schedule Determine the interest of the potential bidders Discuss trade jurisdiction as applied to the contractor Obtain required information on previous jobs completed by the contractor

Local Contractors Many professional construction management jobs cannot be successfully managed unless certain phases of work are early explained If the program is properly explained many leading contractors can and do offer suggestions for scoping work packages or for using local saving methods or material

Other Key Local Contractors The local Building department is a key factor to a successful early start for a phased construction program where the plans and specifications has to approved before construction beginning Special licenses are required for the field construction manager who in direct charge of the job-site work The permits and fees required at various stage of the program such as sewer and water connections could be best handled by the designer

Establishment of Project Field Office The Field office should be established in advance of the award of the contract so that potential bidders can be shown the work site so that local contact with other potential bidders The field construction manager is the key representative in all dealing with local people

Preliminary Estimate The preliminary estimate serves: The design against the owners original budget Preparing a realistic overall schedule that forecasts occupancy date and specifies completion schedules for individual construction contracts

Summary Schedules SUMMARY SCHEDULES include: Design and Procurement Schedule Construction Schedule summarized by individual contracts Construction Schedules summarized by individual facility

Design and Procurement Schedule Schedules of proposal bid package must be prepared showing the detailed Specification period Package Review and approval period Bidding period Evaluation and award period

Design and Procurement Schedule The Schedule has to form the control standard for monitoring actual performance during the planning and design and procurement phases The manager must take the proposal bid package and with the designer develop a control design schedule in order to fit the requirements of the critical path Review of preliminary bid packages should be done by a third party i.e. owner to avoid plan changes which will result in addition cost after contract award

Design and Procurement Schedule If sufficient time is planned for bid periods, schedules can be more easily met and more competitive bids will be received The professional construction manager has the opportunity to seek for alternate the quotations by: Specifying clear choices in the contract documents Encouraging the ingenuity of the bidder

Summary Construction Schedule CPM diagram can be prepared to Determine the critical path and develop key contract milestones Enable adjustments to be made to the design and procurement schedule so the critical items are taken into account by the designer, owner and manager

Summary Construction Schedule Working summary bar-chart schedules are then prepared showing Early and late start dates Late completion date The anticipated duration of each contract package The interrelationships between separate packages Monitoring of actual performance when compared to early and late start scheduled performance will show status of schedule at all times and is an integral part of the project control system

Work Packages The professional project manager should then define proper work packages and develop a reasonably detailed scope Two factors influence defining work packages process: Construction Economy Design Constraints

Construction Economy The scope of work packages should be designed to be of a size that will: Prove most economical by stimulating competition Minimize overall costs by avoiding unnecessary tiers of contractors Take the advantage of the coordination skills of the various general and trade contractors

Design Constraints Design constraints modify the content of bid packages in balance with overall objectives A successful phased-construction program is wholly dependent upon the care and skill that go into designing work packages to achieve maximum benefit to the owner