The Alabama Transportation Rehabilitation and Improvement Program

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Indian Environmental General Assistance Program (GAP) Guidance on the Award and Management of General Assistance Agreements for Tribes and Intertribal.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
65 th Annual NDACE Convention Bryon Fuchs, P.E. NDDOT-Local Government.
District Information Session For the American Recovery and Reinvestment Act.
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
ACEA Annual Conference PERDIDO BEACH RESORT ORANGE BEACH, AL MAY 12-13, 2015 TRAFFIC COUNTS AND RAILROAD AGREEMENT REQUIREMENTS BRAD LINDSEY, P.E. & ADAM.
Overview of the Federal Aid Process for Transportation Projects.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Transportation Enhancement Funds Workshop April 19, 2004 MAG Saguaro Room.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Transportation Enhancements Application Workshop Welcome!! October 3 & 4, 2012.
Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors.
Mock State Aid Project County Highway Accountant’s Conference 2015.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
Kentucky Transportation Cabinet
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
ODOT Traffic Standards Engineer
Regional Planning Meetings 2005 Capital Improvement Program Overview Presented by Steven Cooks, Airport Planner.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
ATRIP Status Update Edward N. Austin, P.E. Alabama Department of Transportation 2016 ACEA Conference May 11, 2016.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
ALDOT Specifications Update
R/W LAP PROJECTS Presented by Ron Crew.
2017 ACEA Annual Conference
2nd Street Drainage and Paving Improvements
Session 23 April 25, 2017 Presenters: Susan Bowman and Tim Grosser
Construction Oversight
County Highway Accountant’s Conference 2015
2017 ACEA Annual Conference
ACEA Annual Conference
TITLE PAGE: Project Title
Traffic Control Plan Development Course
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Completing the State Aid Payment Request
State Transportation Bond Funds
Force Accounts.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
NC RPO Meeting July 25, 2018.
Participatory Road Program neighborhood meeting Donahoo 174th Street
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
25th Avenue Grade Separation
25th Avenue Grade Separation
ApprenticeshipNC Regional Collaboration and Expansion Project
State Transportation Bond Funds
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Construction Considerations
The National Environmental Policy Act (NEPA)
Right of Way Certification
Presentation transcript:

The Alabama Transportation Rehabilitation and Improvement Program ATRIP ATRIP The Alabama Transportation Rehabilitation and Improvement Program

ATRIP Projects Bridges Projects Selected for Funding: 1121 391 Consolidated Into Other ATRIP Projects: 90 Under Construction or Completed: 779 208 Advertised for May 2017 Letting: 11 2 Active Region/Design Bureau Lead: 13 1 Abandoned by Sponsor or Exhausted Funds: 83 49 Active IP Bureau Lead Completed CN Bureau Review: 47 34 Active IP Bureau Lead Without CN Bureau Review: 148 97

ATRIP 729 Projects Under Construction or Completed $776 Million Low Bid $80 Million CE&I $856 Million Investment in Local Roads and Bridges

ATRIP The Letter By October 2017 148 Projects Construction Bureau Ready NEPA Document Substantially Complete Fish & Wildlife Coordination Determine ROW Need Cultural Resource Assessment Tribal Coordination Corps of Engineers Coordination Property Owner Contact

ATRIP PSE – must be complete Plans in IP Bureau with PSE Comments Addressed Letter Recommending Number of Working Days Utility Certificate

ATRIP IPB Bureau Will Catalogue Projects That are CN Ready Work with Regions, Sponsors, and Industry to Determine Letting Schedule for Remaining Projects Must be Let by December 2018

ATRIP Environmental 148 projects left, 102 DO NOT have documents Of those 102 projects, 82 are bridges or projects that require ROW.

Resurface CR-127 from CR-271 to CR-89 Tribal Updates ATRIP 25-03-08 Resurface CR-127 from CR-271 to CR-89 Dekalb County N 34°23’05” W 85°42’50” Township 7 South, Range 9 East, Section 32 of the Fort Payne, AL USGS Quadrangle Map Culvert Location Hicks Creek NORTH

Document Updates

Document Updates

U.S. Fish and Wildlife Updates IPaC Assisted Determination Key is now available for use by eligible Transportation Agencies at https://ecos.fws.gov/ipac.

Bat Assessment Guidance Form

Bat Assessment Guidance Form, cont.

Federally listed Threatened/ Endangered Bats 900 series note:  “WORK ASSOCIATED WITH ITEM 206A-000 (REMOVAL OF OLD BRIDGE) CAN ONLY OCCUR BETWEEN THE DATES OF NOVEMBER 1ST AND MARCH 31ST “

ATRIP Overview Review Submittals Initial Scope of Work & Design Safety Report/Design Certification Slope Waivers County Constructing Approaches Early Award & Delayed Start Requests Bridge Widths TS&L Submittals & Bridge Design Review Submittals Utilities

Plan-In-Hand Review Submittals We do not require Plan-In-Hand (PIH) reviews for ATRIP projects. If a project is complex or has unusual design issues, a PIH review would be beneficial to aid in ironing out those issues. If your project falls into this category, the following items are required for the submittal: A ½ size set of plans without quantities (Summary Sheets or Box Sheets) An Approved Materials Report An Approved Scope of Work

PS&E Review Submittals One ½ size set of plans or 2 ½ size sets if your project includes traffic signal work other than loop wire replacement for resurfacing projects. The 2nd ½ size set will be transmitted to Design Bureau – Traffic Design for their review. They will provide any comments pertaining to traffic signal under a separate review letter. An Approved Materials Report An Approved Scope of Work

Construction Bureau Review Submittals One ½ size set of plans or 2 ½ size sets if your project is a bridge replacement project with an AASHTO Bridge, Precast Bridge, or a 3-Sided Culvert. If your project is a bridge replacement project with an AASHTO Bridge, Precast Bridge, or a 3-Sided Culvert, you do not need to include the bridge plans in your submittal. We will receive signed bridge plans for the project from Bridge Bureau and insert them into your plan assembly prior to transmitting them to Construction Bureau. We cannot send a project to Construction Bureau with an AASHTO Bridge, Precast Bridge, or 3-Sided Culvert without signed bridge plans from Bridge Bureau. Recommended Working Days Cost Estimate – Can be from County or from Transport Utility Certificate – Show all owners and whether or not they are in conflict. If they are in conflict, the cert. should state who will be responsible for moving the utility and the date when the relocation will be complete.

Office Engineer Submittals One full size paper set with a Mylar Title Sheet. If you are making an Office Engineer submittal for an AASHTO Bridge, Precast Bridge, or 3-Sided Culvert Bridge Replacement Project, you do not need to include the bridge plans in your submittal. We will receive signed bridge plans for the project from the Bridge Bureau and insert them into your plan assembly prior to submitting them to Office Engineer. Transport Estimate that matches the quantities shown in the Office Engineer submittal. Construction Bureau review comment response letter. We need both the roadway and bridge response letters if the project is a bridge replacement project with an AASHTO, Precast, or 3-Sided Culvert. Documentation: R.O.W. encroachment certificate – Please note that ATRIP projects require the “old” County Transportation version of the R.O.W. encroachment certificate which is the one that requires the region to visually inspect and certify that all encroachments have been removed. R.O.W. recording data letter Utility Certificate Engineering Personnel & Equipment Certification (or letter stating the intent to use a consultant for engineering and inspection) Certificate of Physical Construction (R.O.W. Cert.) Railroad Certification Approved Environmental Document

Scope of Work & Design Safety Report/Design Certification All projects require an Initial Scope of Work and a Design Safety Report or a Design Certification Letter. A Design Safety Report will be needed if there are features within the project limits that do not meet all of the parameters as noted in the ALDOT County Road Design Policy for the proposed design speed and traffic shown for the project. These include: Horizontal Curves Vertical Curves Maximum Grade Superelevation Lane Widths Shoulder Widths The Design Safety Report will have to be submitted to the Region, Innovative Programs, and the Chief Engineer for approval. If the project meets all of the above design features, then a Design Certification letter is all that is required.

Slope Waiver Requests The use of any slope on a project that is steeper than 3:1 will require approval from the Chief Engineer. This includes projects where the county will be using county forces to construct the approaches.

County Requests to Construct Approaches For bridge replacement projects where the county is proposing to construct approaches with county forces, the county must submit a request in accordance with the county transportation memo titled “Use of County Forces to Accomplish Work on Federally funded Construction Projects Requiring Suspension of Time Charges”. The suspension of time charges as noted in this memo will not be needed if the intent of the project is for the contractor to construct the bridge or bridge culvert only and the county is to perform all of the remaining items of work. These requests will have the same signature page as required in the design safety report to include an approval by the chief engineer. All submittals of plans for review by the Construction Bureau that require time suspensions must include a recommended number of calendar days for the project time to be suspended. This calendar day suspension time will be subject to review and revision by construction bureau personnel.

Early Award & Delayed Start Requests An early award or delayed start request for a project can be granted in special or unusual circumstances. A written request to the region will be required stating the reason for the request and will require the approval of the Region and Innovative Programs Bureau. If a delayed start is being requested, a date that time charges for the project to begin must be noted. An early award or delayed start request should be submitted prior to or with the Construction Bureau submittal to insure that all required special provisions can be noted and included in the proposal.

Bridge Width – 24’ vs. 28’ For the ATRIP program, we are reviewing each project on a case-by-case basis. (Design Speed, Traffic, Required Lane Width & Shoulder Width, Safety, etc.) The Bridge Bureau has standards for both a 24’ AASHTO bridge along with a 24’ Precast bridge. Early coordination and constant communication with your respective Region/Area office is key Procedural Guidelines for County Projects:

Bridge Design Review Submittals TS&L Submittals The TS&L submittals should be sent to your Area office. The Area office will then send it up to Innovative Programs for our review. After our office approves the alignment, we send it to Bridge Bureau. Bridge Design Review Submittals The Bridge Design Review submittals (1st, 2nd, 3rd, etc.) should be sent directly to the bridge bureau. The bridge designer will be communicating directly with Bridge Bureau Personnel. Our office does not need to see these design submittals.

Utilities Vertical Clearance for Overhead Electric Lines on Bridge and Culvert replacement projects. Conflicts with Contractor Equipment (Mainly Cranes). Utility Certificate How long will the relocation take? When will it be complete? Who will be performing the relocation?

E-Mail: deesr@dot.state.al.us Contact Information Barrett Dees, P.E., A.M.ASCE Innovative Programs E-Mail: deesr@dot.state.al.us Office: 334.242-6818 Cell: 334.239.1442