THIRD PARTY INSPECTION BY QUALITY SUPERVISION CONSULTANTS

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
State Film Tax Credit Incentives John C. Genz CPA, MST Partner-in-Charge, State & Local Tax Group.
Professional Behaviour
Marcy Mealy Procurement Specialist CDBG Program
Audit Findings on Kindergarten Inspections Internal Audit Section Finance Division November 2014.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Public Procurement in The Rep. of Maldives
ZHRC/HTI Financial Management Training
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Chapter 6 Setting up the company. Objectives Best form of ownership Sole proprietorship and partnership Incorporating a business S corporation and limited.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
1 Implementing an External Audit Reform Program  A country case study Uganda Presented by: John F. S. Muwanga Auditor General of Uganda May 24, 2003.
1 Education Bureau Jan 2013 Trading Operations in Schools Fundamental Principles and Relevant Guidelines.
Procurement Policy Approved Initiatives Procurement Benchmarks Advisory Committee July 4, 2013 Randall Meades, Director General Procurement and Vendor.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
TA-4922 (PAK): Sindh Growth and Rural Revitalization Program Sindh Fund Management House Strategic Plan Presentation to the Boards of the Sindh Pension.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
BTOP OVERSIGHT WASHINGTON D.C. MAY 2012 U.S. DOC Inspector General Recovery Act Oversight Task Force 1.
1 Protection of the rights of consumers in Energy sector Malkhaz Dzidzikashvili 27 June - 3 July, 2008 Georgian National Energy and Water Supply Regulatory.
1 Health Exchange Proposal Delaware Health Care Commission May 5, 2011.
Audit Findings on Kindergarten Inspections Internal Audit Section Finance Division November 2013.
Protecting Data Rights Under DoD Contracts October 14, 2009 NCMA Workshop Cape Canaveral Chapter Keith R. Szeliga Sheppard Mullin Richter & Hampton.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
Unit 9 Seminar Business Organizations. Things to do this unit: UNIT 9 – Read Chapter 13 and 14 – Respond to the Discussion Board – Attend the Weekly Seminar.
KENYA NATIONAL BUREAU OF STATISTICS
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Framework Consultants Presentation Judith Chivers Estates and Capital Developments.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Guidelines for Project Management
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Ethical Disclosures REGION 20 EDUCATION SERVICE CENTER [Wednesday, March 2, 2016]
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
Consultancy Services K.N. Venkata Raman Procurement Consultant, World Bank.
STANDARD TENDER DOCUMENTS - WORKS K.N. Venkata Raman Procurement Consultant, World Bank.
ISO/IEC
G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Contract Award Procedures
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Qualification Criteria and Available Tender Capacity
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Tips on developing a good budget
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
Particular Conditions of Contract & Appendix to Tender
Module 3 Organization Overview
Project Development and Managing your Build Agenda
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Uniform Guidance - Procurement Implementation
Brown Bag Breakfast Briefing: Professional Service Providers
Projects and procurement
MINISTRY OF ECONOMY AND FINANCE
Management Verifications & Sampling Methods
Projects and procurement
The Role of Private Sector in Capital Budgeting
Towards More Inclusive Development
PUBLIC PROCUREMENTS IN THE REPUBLIC OF SERBIA
Presentation transcript:

THIRD PARTY INSPECTION BY QUALITY SUPERVISION CONSULTANTS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Tuesday, July 12, 2005 12-07-2005 Advisor, IDS Cell

Third Party Inspection of Works, Goods & Equipments Current Status - Works There are no specific provisions regarding inspection of works in the Karnataka PWD Code Clause 12(b), 12(c) & 13(a) of PWG 65 currently govern execution of works to the required quality Contractor is primarily responsible for quality Executive Engineer / Assistant Executive Engineer are engaged in multifarious activities, administrative, financial, technical & hence cannot bestow unstinted attention to quality of works. They are responsible for progress & also quality. This is a conflict of interest. 12-07-2005 Advisor, IDS Cell

Current Quality Control Set up - Works QC set up is inadequate QC staff are, by & large, disgruntled or dissatisfied QC staff function under officers in-charge of execution of works. QC staff are drawn from the same organization & inter-transferable. Poor quality works are numerous & result in poor return for investment. Contractors do not engage any technical staff though required to do so. In-house QC is hence in a poor shape. 12-07-2005 Advisor, IDS Cell

Current QC status - Goods SPD-now closed, did not have its own inspection wing. It depended on Departmental Government officers. KPTCL specifies that materials during manufacture & thereafter are to be tested by the manufacturer / supplier in the presence of KPTCL engineer. Both lack modern professional element. While the present system of inspection for works / goods / equipment can be acceptable for small value works / goods, a better system is needed for larger ones. 12-07-2005 Advisor, IDS Cell

Independent (Third Party) Inspection Agency Advantages: They are professionally qualified They have necessary experience. They are independent They are not responsible for targets, progress, payment etc & hence there is no clash of interest. This will ensure value for money This will check corruption This will stop low quality work getting accepted & paid for as is likely to happen now. G.O. No. FD 55 Pro.Cell 2004, dated 17-02-2005 providing for Third Party Inspection already issued. 12-07-2005 Advisor, IDS Cell

The Provisions of G.O No. FD 55 Pro.Cell 2004, dated 17-02-2005 Third Party Inspectors (TPI) (Quality Supervision Consultants) (QSC) to be appointed to improve quality of works / goods / equipments. TPI mandatory for all works contracts of estimated value > Rs. 2 crores & all goods / equipments contracts of value > Rs. 25 lakshs. QSC to be appointed as per the G.O PWD 121 SO/FC 2003, dated 26-09-2003 for appointment of Consultants. 12-07-2005 Advisor, IDS Cell

Employment of QSC Well defined TOR to be drafted to engage QSC Detailed checklists to be completed by QSC to be prepared (with the assistance of experts if need be) to ensure satisfactory performance by QSC. QSC can be engaged for one or more works / supply of goods / equipments or for a specified term for a Procurement Entity. HOD / MDs of PSUs / Boards / Societies / Local Bodies to engage QSC & order their payment on satisfactory performance. Expenditure on QSC to be charged to the relevant work / procurement estimates. 12-07-2005 Advisor, IDS Cell

QSC inspections QSC to inspect works periodically QSC to submit reports as per checklists to the Employer / copy to the Secretary / Managing Director QSC to inspect goods / equipments during manufacture / before dispatch / after receipt, assembly & commissioning. Engaging QSC does not absolve the primary responsibility of the Employers towards sound quality of works / goods / equipments. QSC are there to assist the Employer / purchaser in discharging their primary responsibilities. QSC not to be engaged where a specialized in-house QC organization exists or a separate Supervision Consultant has been already engaged. 12-07-2005 Advisor, IDS Cell

KTPP Act & TPI Applicable to all Procurement Entities as defined in Section 2(d) of Chapter-1 This G.O about engaging TPI / QSC to be included in the special conditions of Contract of the Tender documents. The Contents of this G.O will be incorporated in the Karnataka PWD Code & other manuals. 12-07-2005 Advisor, IDS Cell

THANK YOU 12-07-2005 Advisor, IDS Cell