Overhead Distribution Systems

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

Page 1 Outage Management Roy Hoffman 29 Jan 2001.
Overview of Full Use Guide on Electric Power Distribution Reliability Indices Panel Session – How to Define Major Events July 22, 2002 Presented.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
Robert H Fletcher 1 Distribution System Efficiency Voltage Optimization Application to Rural Feeders Case Study 2010 Robert Fletcher, PhD, P.E. Utility.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
© Southwest Electrical Distribution Exchange (SWEDE) May 2, 2008 Materials and Equipment John Macek Application Director, S&C Electric.
Distributed Intelligence Provides Self-Healing for the Grid
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
1 Distributed Generation and Power Quality. 2 Relaying considerations DG infeed may reduce the reach of overcurrent relays –DG feeds fault, so utility.
RT3b – André Smit, Siemens USA
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
1 Distribution Automation Survey Presented at SWEDE Conference 2005 By Kevin Clark.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Fault Hunting Using Three-Phase Reclosers Michael S. CostaJerome V. JoskenDennis A. Walder Eversource EnergyUC SynergeticEaton IEEE Rural Electric Power.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Chapter 7 SYSTEM PROTECTION
Interconnect Protection of Dispersed Generators
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
Rulemaking PacifiCorp Responses to ALJ Ruling May 26, 2015.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Subtransmission Reliability Criteria
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
Distribution Automation: Fault Detection, Isolation, and Restoration
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
4/22/2017 WHAT IS THERMOGRAPHY?
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Endesa Colombia Our Distribution System In Front Of The Development Of Colombia.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
2. Terms and definitions1 # Voltage Sags and Interruptions.
Ordering Tool Guideline
Medium Voltage Outdoor Apparatus Portfolio
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Frankfurt (Germany), 6-9 June 2011 KOSTIAINEN– FI – S3– 0622 Paper 0622 TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT  Antti Kostiainen,
Advanced Outage Avoidance Strategy
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
ZAVODA CA ALPHA2 Block 4 – Question 7, 8, 13 Barcelona May Question 7 (7.1) Instrument X V = 1 p.u. Instrument YV = 1.043p.u. Error = 4.3%
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
1 Managing Distribution System Reliability at Southern California Edison Robert Tucker Thach “Nicholas” Duong Roger Lee OIR R Workshop May 26.
ECE 498HZ: Power Distribution System Analysis
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Protection of Power Systems
Resiliency and Reliability
Utility Needs and Smart Grid for Major Storm Events
Predictive-Based Maintenance Strategy
Interconnect Protection of Dispersed Generators
Advanced Fuse-Saving Techniques
35kV Assessment SWEDE 2007 May 10, 2007.
Strategic Managing Operational
the CERN Electrical network protection system
What is an Operation and Misoperation
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
IPS-SLR™ Static Line Rating Module and ElectraNet Use Case IPS-ENERGY™
Protective Relaying Conference
Distribution Circuit Automation Scheme Design
Paris distribution system
What is an Operation and Misoperation
Distribution Circuit Reliability Tool
ECE 476 POWER SYSTEM ANALYSIS
Customized gis applications for Electric DISTRIBUTION Utilities
Presentation transcript:

Overhead Distribution Systems RULE NO. 1 All Tools and Templates have a support function in the strategic planning process. The following slides should definitely not drive us in our strategy planning but be of great help when consolidating. Please note: This is a set of recommended template which should support us in the strategic preparation phase. None of this templates are mandatory. It is up to BA PTMV to decide which templates support us in our analysis. So we will only use what makes sense for our type of business. And last but not least: Have fun with the SWOT Analysis and contact me if you need my help. Jasmin Staiblin

The Example Distribution Circuit Typical of suburban/rural circuits 10 miles of 3-Phase 13.8 kV Main Feeder 8 single-phase laterals, evenly distributed on the main feeder. Each lateral 3 miles long, and connected to the main feeder through a fuse A total of 1800 customers (8 x 225 customers/lateral) Distribution Substation 10 miles 3 miles 115 kV 13.8 kV

Improving Distribution Reliability with Reclosers Basic Radial System Case 1 SAIFI: 4.3 int/cust/yr SAIDI: 8.8 hrs/yr MAIFI: 0.0 mom/yr Substation 10 miles Circuit Breaker with No Reclosing Capability Case 2 Substation 10 miles SAIFI: 1.6 int/cust/yr SAIDI: 3.3 hrs/yr MAIFI: 8.7 mom/yr R Recloser

Use of Line Reclosers Case 3 SAIFI: 2.6 int/cust/yr SAIDI: 5.4 hrs/yr MAIFI: 2.1 mom/yr Substation 5 miles 5 miles R Circuit Breaker with No Reclosing Capability Case 4 SAIFI: 1.2 int/cust/yr SAIDI: 2.6 hrs/yr MAIFI: 6.5 mom/yr Substation 5 miles 5 miles R R Recloser

Loop Configuration with Manual Switch Case 5 Substation 1 5 miles 5 miles R SAIFI: 1.2 int/cust/yr SAIDI: 2.3 hrs/yr MAIFI: 6.5 mom/yr Manual Tie Switch Substation 2 R Assumptions Circuit breakers have reclosing capability Manual Tie Switch requires 1 hour to switch Reclosers require 1 minute to switch

Automatic Loop Restoration - 3 Reclosers Case 6 Substation 1 5 miles 5 miles R SAIFI: 1.0 int/cust/yr SAIDI: 2.1 hrs/yr MAIFI: 6.8 mom/yr N.C. Recloser N.O. Recloser R Substation 2 R N.C. Recloser N.C. - Normally-Closed N.O. - Normally-Open Assumptions Circuit breakers have reclosing capability Reclosers require 1 minute to switch

Automatic Loop Restoration - 5 Reclosers Case 7 Substation 1 3.3 miles 3.3 miles 3.3 miles R R N.C. Recloser N.C. Recloser N.O. Recloser R Substation 2 R R N.C. Recloser N.C. Recloser N.C. - Normally-Closed N.O. - Normally-Open SAIFI: 0.8 int/cust/yr SAIDI: 1.7 hrs/yr MAIFI: 6.5 mom/yr Assumptions Circuit breakers have reclosing capability Reclosers require 1 minute to switch

Summary of Reclosing Benefits Hrs/Yr %* 8.8 ---- Case 1 - No reclosing 3.3 63% Case 2 - Substation reclosing R R Case 4 - Line Recloser 2.6 70% R 2.3 74% Case 5 - Loop with Manual Switch R 2.1 76% Case 6 - 3-Recloser Automatic Loop Restoration R 1.7 81% Case 7 - 5-Recloser Automatic Loop Restoration *% Improvement as compared to Case 1

Automatic Loop Restoration - 3 Reclosers ***With Single-Pole Reclosing*** Substation 1 5 miles 5 miles R SAIFI: 0.8 int/cust/yr SAIDI: 1.8 hrs/yr MAIFI: 3.1 mom/yr N.C. Recloser N.O. Recloser R Substation 2 R N.C. Recloser N.C. - Normally-Closed N.O. - Normally-Open Assumptions Circuit breakers have reclosing capability Reclosers require 1 minute to switch

Automatic Loop Restoration - 5 Reclosers ***With Single-Pole Reclosing*** Substation 1 3.3 miles 3.3 miles 3.3 miles R R N.C. Recloser N.C. Recloser N.O. Recloser R Substation 2 R R N.C. Recloser N.C. Recloser N.C. - Normally-Closed N.O. - Normally-Open SAIFI: 0.6 int/cust/yr SAIDI: 1.4 hrs/yr MAIFI: 2.7 mom/yr Assumptions Circuit breakers have reclosing capability Reclosers require 1 minute to switch

Benefits of Single-Pole Reclosing

Predictive Reliability Analysis ABB Consulting’s Performance AdvantageTM Software Useful for: Looking at system configuration and design Placement of protective devices Impacts of changes in failure rates and restoration times Analyzing system reliability from a graphical perspective and determining the most cost-effective solutions

Improving Distribution Reliability ABB is the ONLY supplier that can do this in all of the above schemes!