Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Since Rich wanted some relatively quick info on what detector might be needed to help MuTr pattern recognition, I did a scan on a central HIJING file I.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Optimising Cuts for HLT George Talbot Supervisor: Stewart Martin-Haugh.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
CLIC_ILD vertex detector modules and stave Layout Mathieu Benoit 15/03/12 mini workshop on engineering aspects of the CLIC vertex detectors 1.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Plans for a Simulation Study of the Magnetic Field Requirements of the LC TPC February 2006, ILC TPC Analysis Jamboree, DESY Christian Hansen University.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Anatoli Romaniouk, 3 March 2009 ACES Track trigger in ATLAS? Track trigger in ATLAS? Anatoli Romaniouk Moscow Physics and Engineering Institute.
Layout Tool results In a first exercise we have reproduced something.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
Introdcution to Workpackage/Activity Reflection D. Schulte.
meeting, Oct. 1 st 2015 meeting, Oct. 1 st Gas Pixel: TRD + Tracker.
SAS TRD Possible TRD configurations for PID up to the TeVs energies fig.s for this talk taken by: B.Dolgoshein Transition radiation detectors -NIM A326(1993)
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Eunil Won/Korea U1 A study of configuration for silicon based Intermediate Trackers (IT) July Eunil Won Korea University.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
Extending the PHENIX physics reach Physics beyond the baseline accessible at RHIC II Capabilities needed to address the new physics Detector upgrades to.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
TPC for 4-th concept S.Popescu IFIN-HH, Bucharest.
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Straw prototype test beam 2017: first glance at the data
Alignment of the CMS Tracker
Detector building Notes of our discussion
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Layout of Detectors for CLIC
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Some basic ideas (not a solution)
MAGIX Detectors Overview
Upgrade Strategy for the Experimental Vacuum Systems
IDEA Detector Simulation Status
The DBD: Outline and Scope
Why do we want a TPC? P. Colas, CEA Saclay
TPC Paul Colas Technical meeting, Lyon.
Pixel DAQ and Trigger for HL-LHC
Paul Colas, CEA Saclay, Akira Sugiyama, Saga U.
Special Considerations for SIDIS
FPCCD Vertex Detector for ILC
Detector Optimization using Particle Flow Algorithm
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Why do we want a TPC? P. Colas, CEA Saclay
The LHCb VErtex LOcator
SHLC INFN Road Map Working Group 11/01/2006
Gas Pixel TRD/Tracker With the support of the TRT collaboration
IR/MDI requirements for the EIC
GasPixel Transition Radiation Tracker
Clustering-based Studies on the upgraded ITS of the Alice Experiment
Option 1: Reduced FF Quad Apertures
Presentation transcript:

Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout which affect overall detector concept of the studies which we have to perform nearest future. The first priority tasks I would split in 2 categories The studies which we can perform with the existing TimePix set-up and which are clear now, such as: Search and studies of the different gas mixtures Text beam studies of the detector performance in different configurations with these mixtures in the magnetic filed. …….. Another type of the activity is the work on the layout and on the detector module design which is indeed far away from to be clear now and which affects the work in all directions Detector requirements and specifications. This includes the detectors concept and requirements to its elements: Physics and technological constrains on the detector performance. Single Module design and limits/constrains coming from different type of technologies and electronics design. And many issues All this require a lot of conceptual and simulation work and we shell start discussions as soon as possible to make the plan how and what we want to address now and what we can leave for later stage. Even the choice of the priorities does not seem to be evident having in mind a present scale of our collaboration.

Introduction: Possible GridPixel Tracker layout It is assumed that this detector will occupy the outer radii of the Inner Tracker and contains two layers interleaved with moderator or dense TR radiator h Difficulties: 1. In the barrel region track angle very much depends on the angle 2. Lorentz displacement also changes the tack direction f

Possible GridPixel Tracker layout: turbine type

Possible GridPixel Tracker layout: turbine type Basic Ideas: Keep a reasonable projection angle of the track and its length on the pixel plane Compensate a Lorenz Angle. Maximize of the size of each module to minimize the dead areas, field distortion and allow effective inter chip communication. angle optimization, size optimization, accuracy of Lorentz angle compensation….

Constrains on the module size. Requirements: The module area should be as large as geometry and parallax allow (depends also how well the L1 tack reconstruction algorithm can handle these issues. Maximum area of the module (10 x 20 cm2 ?) Allows to cover a reasonably large part of the aperture: Minimizes of the dead areas Minimizes the field distortions relative volume Maximizes inter-chip processing communications Minimizes simplifies of the number for service connections and simplifies design. Allows significant overlap without increase of the material budget. ……. Drawback: Development of the post processing technique on the preassembled chip array Do we have principal technological constrains on this approach apart of money issues? Module particle

Module constrains and questions to be answered-studied Functionality: Do we want to keep TR? Track reconstruction: Pt> 1GeV? L1 track trigger: Pt programmable but >10 GeV? What are the requirements for the momentum accuracy at L1? How the parallax and the Lorentz angle adjustment error is going to be treated? Minimum pixel size? Flexibility requirements (functional) ? …… Gas requirements: heavy (to maximize dE/dx), fast, low diffusion in the direction perpendicular to the magnetic filed, minimum Lorentz angle no ageing, not aggressive not electro negative satisfying CERN safety requirements 3. Drift space If we keep TR it should be at least ~16mm ( More BX overlapped) Without TR other it can be <10 mm (higher drift velocity possible, almost 2 times less BXs overlap…) optimization still required. Some other requirements/constrains/options???

Hot topics to follow up. We shell define priorities as soon as possible (too many things to do). We can keep TR and NO TR options a bit longer but it affects electronics design and at certain moment we shell choose. We shell agree on the strategy how to maximize the size area of the module. Which safety constrains on the gas components? Other possible detector layouts? Among many other things we desperately need detector simulation group. The detector and electronics concept depend on the results of the simulations Shell we put as a goal an installation a sizable the detector prototype (almost production modules) with full or at least maximum functionality in the 2016 shutdown in the ID region and may be somewhere else? Do we agree on this? How to acquire a more effectively working collaborators to the project? Start preparation (talk to people, define the way, prepare proposal, find applications for the developments) to ask significant amount of money in EU funding The list is not complete and please I would really ask all of you to put more questions to be answered to define priorities.

Test beam studies in 2011 Performance in a presence of a strong magnetic field Objectives: Studies of the gas mixtures Performance studies with different gas gaps Magnetic filed effects TR studies in the magnetic field B= 0 and B=1.5 T Different gas options Two drift spaces (16, ~10 (to be optimized) Different angles to the magnetic filed. Test of the Lorentz angle compensation B L = 16 mm V0 V1 TR-Radiator Beam p, el 45o e- Needs more detailed discussion of the test beam program. Some MC simulations should be done in advance.

R&D summary Urgent (means NOW) feedback is required. I must send it today! VERY important if we want that ATLAS helps us!!!