Satellite Information Flow

Slides:



Advertisements
Similar presentations
Bill Ward/Michael Folmer Himawari Satellite Training Leads Himawari Training Plan NOAA Satellite Proving Ground/User-Readiness 2014 Meeting Kansas City,
Advertisements

NCEP Production Suite Review NWS Integrated Dissemination Program
Reginald Lawrence Office of Systems Development
Himawari-8 Project Plans and Status. Background 2 NESDIS is implementing a capability to ingest Advanced Himawari Imager data from JMA, process and generate.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Suomi National Polar-orbiting Partnership (SNPP) Data Access NOAA Satellite Conference April 8-12, 2013 Kevin Berberich NESDIS/OSD NDE Project Photographs.
Real-Time GOES/POES Data Access
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Science Challenges: Streamline the process to ensure products are operational.
Near Real-Time Data Access - PDA
Mary E. Kicza Assistant Administrator for NOAA Satellite and Information Services Responsible for Responsible for providing timely access to global environmental.
Session 1.1 Highlights Since the 2013 NOAA Satellite Conference for Direct Readout, GOES/POES, and GOES-R/JPSS Users Mike Condray Deputy Director Office.
Environmental Satellite Product and Distribution System (ESPDS) GOES-R Access Subsystem (GAS) John Linn ESPDS System Engineering 7 October 2009.
NOAA Satellite Conference April 8-12, 2013 Mary Kicza Assistant Administrator for Satellite & Information Services.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
OCONUS Update June 2013 Jerry Janssen David Hartzell 2.
2015 NOAA Satellite Conference Greenbelt, MD April 27, 2015 NESDIS Center for Satellite Applications and Research (STAR) Dr. Al Powell, Director Dr. Michael.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
MADIS – The Meteorological Assimilation Data Ingest System Current Operational Status and Future Plans Greg Pratt, Leon Benjamin, Thomas Kent, Gopa Padmanabhan,
GOES-R User Readiness Planning Kathy Fontaine USRP Lead GOES-R GS Project Satellite Direct Readout Conference Miami, FL April 12, 2011.
1 Next Generation of Operational Earth Observations From the National Polar-Orbiting Operational Environmental Satellite System (NPOESS): Program Overview.
Reginald Lawrence, NOAA/NESDIS/OSD NOAA Direct Readout Conference
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
NOAA Satellite Proving Ground/User Readiness Meeting
Satellite Products Dissemination Brian Gockel NOAA/NWS Office of Observations June 16, Satellite Proving Ground/User-Readiness Meeting.
JAG/ODAA Fall 2008 James Vermeulen & Jon Whiteside JAG-ODAA Co-Chairs Recommend NCEP's Bradley Ballish replace Jon Whiteside (term completed)
NDE Title Page NDE NPOESS Data Exploitation Jim Yoe, Implementation Coordinator NPOESS Data Exploitation (NDE) Project NESDIS Office of Systems Development.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
US BENEFITS. It Addresses Priorities The US and Canada have common scientific, economic and strategic interests in arctic observing: marine and air transportation.
BACKUP XDRs and NDE PRODUCTS Fall 2010 COPC Meeting (AFWA – Offutt AFB) Jim Vermuelen FNMOC - Data Ingest Team Supervisor WG-CSAB Member JAG/ODAA Co-Chair.
Considerations for GOES-R Readiness in Canada
COPC Meeting, May 27 – 28 th 2015 NDE Operational Status and PDA Update Prepared by: Chris Sisko, NDE Operational Status.
CLASS Information Management Presented at NOAATECH Conference 2006 Presented by Pat Schafer (CLASS-WV Development Lead)
Swift HUG April Swift data archive Lorella Angelini HEASARC.
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
NOAA Report WGISS 19 Climate and Meteorology Status Glenn K. Rutledge NOAA Cordoba, Argentina March 7,2005.
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
NOAA Plenary Agenda Item th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 NOAA Satellite and Information Service.
NOAA Satellite Proving Ground/User Readiness Meeting Ming Ji Director, Science & Technology Integration National Weather Service June 15,
V7 July 22, Analysis of Alternatives Decision Brief to the SPSRB Instructions / Guidance This template will be used by NESDIS personnel to present.
Overview ABSTRACT As part of its Polar Satellite Program, NOAA operates the Jason-2 altimetry satellite and shares production of near real-time (NRT) products.
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
ESPC CIP Update November 7, COPC Action Item  NESDIS is currently in the process of reviewing and planning upgrades for the critical infrastructure.
CGMS-43-NOAA-WP-03 Coordination Group for Meteorological Satellites - CGMS PDA Product Distribution & Acquisition by NOAA Presented to CGMS-43 Plenary.
2016 Satellite Proving Ground/User-Readiness Meeting (May 9-13, 2016) Chris Sisko Mission Operations: ESPC Enterprise Product.
1 NWS Expectations Satellite Data CONOPS Mike Johnson.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
Transition of Science Algorithms into Enterprise Product Generation Operations 2016 AMS Annual Meeting Dylan Powell, Ph.D. Lockheed Martin ESPDS Science.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
Band 14 (11um) Winds Low-Level >700 mb Mid-Level mb High-Level mb   NPP VIIRS Polar Winds Products The GOES-R AWG Derived Motion Winds.
WG-CSAB Update Spring 2010 COPC Meeting Allan Darling WG-CSAB Chair.
OC/42 System Improvements page 1 42 nd Argos Operations Committee Meeting Assmannshausen, Germany June 3 rd to 5 th, 2008 G-1-5.
2013 GSICS Joint Meeting, Williamsburg VA, USA, March GSICS Collaboration Servers Status: 2013 Peter Miu (EUMETSAT) CMA, CNES, EUMETSAT, ISRO,
GOES-R in Max The benefits are well known, 5x faster data, 4x better resolution, ~3x more spectral channels What challenges does this new data present?
Operational Wind Products at NOAA/NESDIS
NOAA Transition to New Direct Readout Systems for JPSS Presented to CGMS-44 Working Group 1, agenda item 3.2.
Central Satellite Data Repository Supporting Research and Development
NOAA Report on Ocean Parameters - SST Presented to CGMS-43 Working Group 2 session, agenda item 9 Author: Sasha Ignatov.
SNPP Regional Retransmission Service: Plans and Status of Implementation Presented to CGMS-43 Working Group 1 session, agenda item 6.
Data CeNtre Updates GEO visit 02 July 2015.
Enterprise Algorithm Change Process
SNPP VIIRS Aerosol Product Latencies
Satellite Data Resources: Browsing and Accessing Archived Datasets
NOAA Report on Satellite Data Calibration and Validation – Satellite Anomalies Presented to CGMS-43 Working Group 2 session, agenda item 3 Author: Weng.
NOAA CLASS Demo NOAA/JPSS Jorel Torres
Kickoff Presentation Date of Presentation Presenter Name
Microsoft Services Provider License Agreement Program reference card
NOAA Future Observing System Objectives
Jerrold Robaidek & Dave Santek
Lawson ProcessFlow Overview and Actual ProcessFlow Solutions
Presentation transcript:

PDA Product Distribution & Acquisition by NOAA Presented to CGMS-44 WGIV, agenda item 4

Satellite Information Flow SNPP/JPSS-1 (PM) POES NOAA-19 Center for Satellite Applications and Research (STAR) GOES-West GOES-East Non-NOAA (Jason2, DMSP, Meteosat, MTSAT, Metop, EOS, COSMIC, others) Product Development Algorithm Development Science Maintenance Office of Satellite and Product Operations (OSPO) METOP-B/C (AM) TDRSS Fairbanks Wallops Svalbard McMurdo / Troll Command and Control Processing and Distribution Satellite Operations Control Center Environmental Satellite Processing Center Suitland Data and Products Customers Office of Satellite Ground Systems (OSGS) Ground Systems Development and Sustainment, IT Enterprise Architecture Archive and Access NESDIS Data Centers

Current Processing & Distribution Polar products – DDS & NDE 1.0 GOES products – GEODIST McIDAS formatted products Highly manual data access process Paper data access requests Subscriptions all manually managed by OSPO

New Processing & Distribution 1/2 All near real time distribution except McIDAS will be done from PDA McIDAS will remain on GEODIST GOES-R products (AWIPS2/SBN, GRB and PDA) JPSS products Other products from currently supported missions Highly automated, user driven process User managed search and tailoring OSPO to manage and update international user subscriptions, same as current DDS

New Processing & Distribution 2/2 Significant changes to contingency operations There is no GOES-R distribution from the backup PDA (only AWIPS2 and GRB services (KPPs) provided in the event of a backup scenario) The JPSS contingency operations will be limited to a single set of primary sensors Legacy systems will continue to COOP from CIP Data volumes will be much higher Operation Readiness Review scheduled for 25 July 2016 PDA will be operationally ready to accept data from GOES-R ground system System Acceptance Review scheduled for late 2016 / early 2017 PDA will be operationally ready to perform all functions and OSPO will be programmatically ready to take ownership of the system Transition period coupled to support for GOES-R ops Currently, GOES-R data is expected to be the first products available on PDA

PDA Product Delivery Schedule GOES-R – L+6 months for all instruments JPSS-1 – L+90 days for KPPs VIIRS over Alaska, ATMS, CrIS Other sensor products later GOES-NOP/POES/Other Legacy Products Planning to start transition early CY2017 Transition could run 6 months

Big Data Network Communication Challenges Bandwidth vs. time to transfer Example: If you want to receive 20 GB of data in less than 5 minutes, a bandwidth speed of at least 500 Mbps of end to end network capacity is needed NOTE: The slowest speed in the network path determines the overall data transfer speed. GB - Gigabyte Gbps – Gigabit per second (1 Gigabit = 109 bits)

Data Access & Distribution Policy Contact: NESDIS.data.access@noaa.gov Full policy and data access forms at http://www.ospo.noaa.gov/Organization/About/access.html Security requirement to document and control all users accessing operational data servers Significant increases in data volumes necessitate prioritization of users to effectively manage data distribution resources to ensure effective system performance Higher priority access will be given to organizations with: Mission and statutory authority that supports the requirement for real-time data access Signed NESDIS cooperative agreements or other legislative authorities A demonstrated timeliness requirement for near-real time satellite data and products to support operational user applications. For non real-time data users, NOAA/NESDIS will offer alternate sources of data access that are internal and external to NESDIS

Contact Information & Social Media Contact Info Donna McNamara, donna.mcnamara@noaa.gov, 301-817-3803 Chris Sisko, chris.a.sisko@noaa.gov, 301-817-4783 Don Slater, don.slater@noaa.gov, 301-817-4168 24/7 Help Desk ESPCOperations@noaa.gov User Services SPSD.UserServices@noaa.gov Data Access NESDIS.Data.Access@noaa.gov Webmaster SSDWebmaster@noaa.gov Web www.ospo.noaa.gov www.facebook.com/NOAANESDIS www.twitter.com/noaasatellites