LV Meeting – 22 September 2009 Brett Shapiro G v1

Slides:



Advertisements
Similar presentations
Global longitudinal quad damping vs. local damping G v8 1.
Advertisements

Global longitudinal quad damping vs. local damping Brett Shapiro Stanford University 1/32G v13 LIGO.
QUAD Testing Outline, Phase 2B Fiber Lower “half” Build-up and Testing M. Barton, B. Bland, D. Cook, J. Kissel, N. Robertson, J. Romie, T. Sadecki, for.
One Arm Cavity M0 L1 L2 TM M0 L1 L2 TRIPLE QUAD 16m R = 20m, T=1% R = ∞, T=1%  Optimally coupled cavity (no mode matched light reflected back)  Finesse.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO-G D Suspensions Update: the View from Caltech Phil Willems LIGO/Caltech Livingston LSC Meeting March 17-20, 2003.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Seismic attenuation chains concept, design and advancement status Riccardo DeSalvo for the KAGRA Seismic group JGW-G September 10, 20121JGW-G
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
LCGT seismic Attenuation System DRADF DRAFT DRAFT DRAFT.
Review of HAM Suspension Designs for Advanced LIGO Norna A Robertson HAM Isolation Requirements Review Caltech, July 11th 2005.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G D Suspensions Design for Advanced LIGO Phil Willems NSF Review, Oct , 2002 MIT.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Ideal Order of QUAD Testing J. Kissel, S. Aston for the SUS Team G v5 01/18/13 1G v5.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
Cavity Work at LASTI LSC-VIRGO Meeting, Hannover - 24 th October 2007 Lisa Barsotti and Matthew Evans for the LASTI group G D.
Global longitudinal quad damping vs. local damping Brett Shapiro Stanford University 1/36 LIGO G v15.
Update on Suspension Activities for Advanced LIGO Caroline A. Cantley University of Glasgow for the GEO600 Group LSC Meeting, Livingston, March 2003 (Technical.
Monolithic suspension assembly procedure (DRAFT) Status 27 th May 2009 LIGO-T v2.
Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford,
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
Understanding Cabling Noise in LIGO Chihyu Chen Lafayette College Mentors: Mark Barton Norna Robertson Helpful Researcher:Calum Torrie Co-SURF:Julian Freed-Brown.
1|8J.V. van Heijningen Cables finished! Assemble/ Disassemble Type B Payload LED selection measurements NAOJ GW Meeting, May 8 th,
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Mechanical Mode Damping for Parametric Instability Control
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Advanced LIGO UK 1 LIGO-G K OSEM Development UK Advanced LIGO project Stuart Aston University of Birmingham for the UK Advanced LIGO Team LSC.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
Practical considerations for quad suspension upgrades Giles Hammond, Norna Robertson, Travis Sadecki, Brett Shapiro, Betsy Weaver G v3.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
ALIGO QUAD "Level 2" Damping Loop Design (Supplemental to LLO aLOG 6949)LLO aLOG 6949 J. Kissel G v21.
Florian Buchsteiner (HEPHY Vienna)
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
Solenoidal magnet. The status of manufacture, forthcoming works
11 T Dipole Integration & Plans M. Karppinen
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
LCGT Seismic Attenuation System LCGT-SAS
ERMC/RMM activities May 2017
T1 status (a selection from EDR presentations)
Advanced LIGO Quad Prototype Janeen Romie LSC, March 2004
Lasti Update July 25, 2007 LIGO-G Z
Cryogenic Test Masses for LIGO Upgrades
Control of the KAGRA Cryogenic Vibration Isolation System
Beam Wire Scanners (PS prototype and LIU series)
2017 Safety Group 1 – 5 Year Program Timeline Guide
VELO-meeting January 25, 2007 Sub-projects: SX & SX
15/02/2019 MRSO Update Aileen O Connor 15/02/2019.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2018 Advantage Program Timeline Guide
Strategic Planning Timeline Overview
QUAD SUSPENSION CONTROLS ARRANGEMENT MAGNET KEY MAIN CHAIN
2014 Advantage Program Timeline Guide *** Progress Visits ***
Remote Handling Workshop Introduction
2017 Advantage Program Timeline Guide
2016 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group 1 – 5 Year Program Timeline Guide
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2016 Advantage Program Timeline Guide
Presentation transcript:

LV Meeting – 22 September 2009 Brett Shapiro G0900876-v1 Quad NP Update LV Meeting – 22 September 2009 Brett Shapiro G0900876-v1

Timeline of Last Year’s Progress Glass on metal wire hang: Jan ESD reworking: Feb-April Quad Triple Cavity Setup: Feb-April Eddy Current Damping: end of April Acoustic Mode Characterization: May-June Charging measurements: August Ring heater testing: end of August Monolithic tests: July-Aug Jan Feb Mar Apr May June July Aug

Wire Hang – Jan 2009

ESD Work Old soldering procedure – new tab style Suboptimal solder Delicate cabling – poor clamping

Dirty test ESD pattern from the controls prototype ESD Work Refined soldering procedure Better Geometry Fancier tools Optimal solder More heat Practice! Padded clamps ESD pattern may yet change ESD cables may yet change Dirty test ESD pattern from the controls prototype LV Meeting - September 2009

OSEM and ESD Cabling/Clamping Considerations Number of clamps at PUM Clamps on ISI Padding in clamps Specialized clamps between top and UI masses

Cable Routing ‘Large’ connectors between top and UI masses. OSEM Cables ESD Cables Cable Clamp Cable stiffness related to Main Chain Reaction Chain

Mechanical Effect on TFs The large connectors impact pitch and z modes. LV Meeting - September 2009

Improvised ‘clamp’ at top of PUM Poor Clamping Improvised ‘clamp’ at top of PUM

Additional Cabling Routing Issues Improvised clamp at ISI optics table Improvised wire guide to ESD

Measurements LV Meeting - September 2009

Eddy Current Damping (ECD) ECDs ECDs LV Meeting - September 2009

Eddy Current Damping LV Meeting - September 2009

ECD ≈ 2x greater than modeled

Yaw Eddy Current Damping Transverse Dampers Longitudinal Dampers Damping comes from 2 DOFs of magnet motion. LV Meeting - September 2009

ECD Nominal Results Longitudinal and transverse damping are roughly equal

Opening the Magnet Bore from 12 to 12.7 mm Top Mass Top Mass The copper magnet bores were drilled out to simultaneously increase clearance and reduce damping. LV Meeting - September 2009

12.7 mm Bore Long. Damping Larger holes have negligible impact on damping.

12.7 mm Transverse Damping Larger holes have negligible impact on damping.

Ring Heater Testing

Ring Heater Testing The bottom of the quad structure warms by about 0.8 C/10W No gross effects on quad or ISI Vacuum pressure increase on order of 10 ntorr. No RGA available. Will try again with the full monolithic suspension. Should find an upper power limit considering the suspension becomes transparent at high power. Ryan Lawrence’s thesis to provide insight. LV Meeting - September 2009

Modal Damping Results

Modal Damping Results

Upcoming Work Monolithic installation Global control tests Hierarchical New methods HAM ISI integration Local Damping Noise measurements with modal damping TCS LV Meeting - September 2009

Documentation Produced this Year Summary of ECD Results on the Quad Noise Prototype - T090245-00 2. Quad Noise Prototype Cabling Routing - T0900380-v1 3. Quad Noise Prototype Results Summary - T0900426 4. Rehang of the Quad NP with glass masses but metal wires - T0900055-v1 (Includes ESD procedure) LV Meeting - September 2009