Controls & software Andy Butterworth.

Slides:



Advertisements
Similar presentations
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Advertisements

LINAC 4 – LLRF ELECTRONICS UPDATE BCC-42 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), D. Stellfeld,
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Feedback and Beam Control Section (FB) Activities and Highlights 2014 Outlook Wolfgang Hofle FB Section at 2014 RF Group Meeting - December
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
Application Development for Operations in the Coming Years Mike Lamont.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Acknowledgements: RF.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Radio-Frequency (RF) & Schottky diagnostics WP for ELENA Maria Elena Angoletta, BE/RF on behalf of the CERN RF group First ELENA construction meeting CERN,
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
DLLRF: existing & possible applications M. E. Angoletta, M. Jaussi, J. Molendijk, J. Sanchez-Quesada CERN, BE/RF Finemet ® Review, September 2015.
Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
Linac4 Project Meeting 1/ /01/ st priority 2  First priority: from the Linac4 project, the best wishes to you and your families for a 2010.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Potential Berkeley Lab interests in ELENA Construction Hardware: Low-level RF controls Schottky diagnostics H- ion source Beam physics: Cooling S2E Simulations.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
V4.
Injector II Low Level RF & Interlock – Status
CC LLRF SM18 test plan and BA6 infrastructure
Update on BISW EYETS activities
PS status 10 August – 17 August 2017
LIU – SPS Low level RF Updates and schedule G. Hagmann,
LIU Consolidation project (INDICO ) E. Blanco BE/ICS
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Philippe Baudrenghien, Grégoire Hagmann, BE-RF,
Brief introduction to the Injector MD days
Installations up to Start of Commissioning
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
EN 4946 – Refurbishment of Electrical Substations
Me, FESA classes, Testing
TE-ABT Activities for LS2
Installations, modifications, consolidation in 2005:
RF operation of REX-ISOLDE
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Linac4 RF System Operation for the Reliability Run in 2017
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
ESS RF Development at Uppsala University
LLRF: M. E. Angoletta, A. Findlay, M. Jaussi, J. Molendijk, J
Impedance working group update
Superbeams with SPL at CERN
ABP/RTL Main RTL Activities for 2007/8:-
Presentation transcript:

Controls & software Andy Butterworth

RF-CS responsibilities Controls HW and automation PLC controls for RF power systems Digital hardware/firmware development for LLRF systems Software PLC supervision/interface to control system: FESA/SILECS Front-end FESA SW for LLRF equipment User interfaces (Inspector etc.)

Manpower RF-CS Controls HW & Automation Controls software 2 engineers 2 technicians Controls software 4 engineers (staff) 1 fellow (2017->)? 1 PJAS (->2017) 1 OP second job 1 future post LIU-ions

PSB Finemet Test stand for 180 power supplies and 150 amplifiers ready start 2017 Production of PLC systems Software Some software work left to do for LLRF (FESA3 back-port from LEIR) C16 cavity blowup White Rabbit B-train

LEIR Software synergy with PSB and ELENA Phase 1: replace existing system functionality Phase 2: 2 cavity control Manpower issue: same SW developer for LEIR, PSB & ELENA Committed to 1 July deadline

PS Software development for LLRF PS controls consolidation competes for manpower with other controls/automation projects

SPS New amplifier controls not yet defined Clear missing manpower (at least 1 FTE) for Siemens/Philips controls renovation

LINAC4 Controls installation complete Software for LLRF still to finish Currently SW developer on medium-term sick leave (temporarily replaced by manpower from LHC FESA migration)

Conclusions Software team can manage to follow LLRF developments if we obtain all promised manpower (post, fellow, replacement PJAS) LEIR software on track but tight for 1 July Must manage potential conflict with ELENA HW and automation team stretched due to many projects (Crabs, medical RFQ, multi-beam IOT…) Clear manpower hole for SPS 200 MHz upgrade if renovation of existing amplifier controls (at least 1 FTE) LINAC4 on track but short-term SW manpower issue