ASBU Methodology Summary of Block 1 Modules Saulo Da Silva

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Global ATM Operational Concept
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Block 0 Overview Halidou Moussa Air Navigation Commissioner International Civil Aviation Organization.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Dynamic wake turbulence separation Saulo da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok,
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven
Block 0 Overview Halidou Moussa Air Navigation Commissioner
Aviation System Block Upgrades and NAV CANADA Planning
Economic issues Formulation of Business cases H. Sudarshan
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Collaborative Decision Making (CDM) Saulo Da Silva
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
System Wide Information Management
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
Workshop on preparations for ANConf/12 − ASBU methodology
Dynamic wake turbulence separation Saulo da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
Continuous Descent Operations (CDO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 0 Modules H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
Dynamic wake turbulence separation Saulo da Silva
Presentation transcript:

ASBU Methodology Summary of Block 1 Modules Saulo Da Silva SIP/ASBU/2012-WP/11 ASBU Methodology Summary of Block 1 Modules Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi 21-25 May 2012)

ICAO SIP 2012-ASBU workshops Outline Block understanding Block Maturity cycle Block 1 perspective Block 1 Modules Block 1 implementation ICAO SIP 2012-ASBU workshops PIRGS presentation-March 2008

Block 1 Block 0 Block 2 Block 3 Block 1 (2013) (2023) (2028 & >) Performance Improvement Areas Block 0 (2013) Block 2 (2023) Block 3 (2028 & >) Block 1 (2018) Greener Airports Globally Interoperable Systems and Data Optimum Capacity and Flexible Flights Efficient Flight Path ICAO SIP 2012- ASBU workshops 3

ICAO SIP 2012- ASBU workshops Block 1 4 Main Performance improvement areas Greener Airports (6 modules) Globally interoperable systems & data (4 modules) Optimum capacity & flexible flights (4 modules) Efficient flight path (3 modules) Block 1 will serve as the enabler and foundation for the envisioned future aviation systems. ICAO SIP 2012- ASBU workshops

ICAO SIP 2012- ASBU workshops Block Maturity Lifecycle **** Planning Decisions B3 based on business case and validation results as developed during the previous phase B2 2018 B1 SIMPLIFIED LIFECYCLE V0 Identification of Needs V1 V1 Concept Definition B0 V2 V2 Feasibility R&D V3 V3 Pre-Industrial Development and Integration - V4 V4 Industrialisation Implementation Decision V5 V5 Deployment Decision V6 V6 Operations Operations V7 V7 Decommissioning Decision Decision Standardisation activities IOC Initial Operational Capability Block 1 will see critical ANSP capabilities synchronized. ICAO SIP 2012- ASBU workshops

Block 1 in Perspective Information Network Infrastructure ToC ToD CTA Greener Airports Optimum Capacity and Flexible Flights Efficient Flight Path Globally Interoperable Systems and Data Performance Improvement Areas Information B1-30 - Service Improvement through Integration of all Digital ATM Information B1-31 - Performance Improvement through the application of System Wide Information Management (SWIM) Network B1-105 - Better Operational Decisions through Integrated Weather Information B1-35 - Enhanced Flow Performance through Network Operational Planning B1-40 - Improved Traffic Synchronisation and Initial Trajectory-Based Operation ToC ToD B1-05 - Improved Flexibility & Efficiency in Descent Profiles (OPDs) B1-15 - Improved Airport operations through Departure, Surface & Arrival Management B1-85 - Increased Capacity & Flexibility through Interval Management B1-10 - Improved Operations through Free Routing B1-65 - Optimised Airport Accessibility CTA B1-102 – Increased Effectiveness of ground-based Safety Nets B1-90 - Initial Integration of Remotely Piloted Aircraft (RPA) Systems into non-segregated airspace B1-25 - Increased Interoperability, Efficiency & Capacity though FF-ICE/1 application before Departure B1-80 - Optimised Airport Operations through A-CDM Total Airport Management B1-70 - Increased Runway Throughput through Dynamic Wake Turbulence Separation B1-81 - Remotely Operated Aerodrome Control B1-75 - Enhanced Safety & Efficiency of Surface Operations (ATSA-SURF) Infrastructure

ICAO SIP 2012- ASBU workshops Improved Airport operations through Departure, Surface and Arrival Management B1-15 Improved Airport operations through Departure, Surface and Arrival Management Summary This module includes a brief description of integrated surface management and departure sequencing. The module also summarizes the benefits of departure sequencing and its integration with surface management. Main Performance Impact KPA-04 – Efficiency; KPA-02 – Capacity; KPA-09 – Predictability; KPA-06 - Flexibility Domain / Flight Phases Aerodrome and Terminal Applicability Considerations Runways and Terminal Maneuvering Area in major hubs and metropolitan areas will be most in need of these improvements. Complexity in implementation of this module depends on several factors. Some locations might have to confront environmental and operational challenges that will increase the complexity of development and implementation of technology and procedures to realize this module.PBN routes need to be in place. B0-15 B1-15 ICAO SIP 2012- ASBU workshops

ICAO SIP 2012- ASBU workshops B1-70 Increased Runway Throughput through Dynamic Wake Vortex Separation B1-70 - Increased Runway Throughput through Dynamic Wake Vortex Separation Summary This module addresses Improved throughput on departure and arrival runways through the dynamic management of wake turbulence separation minima based on the real-time identification of wake turbulence hazards. Main Performance Impact KPA-02 Capacity , KPA-04 Efficiency, KPA-05 Environment, KPA-06 Flexibility Domain / Flight Phases Aerodrome Applicability Considerations Least Complex – Implementation of re-categorized wake turbulence is mainly procedural. No changes to automation systems are needed. B1-70 B2-70 ICAO SIP 2012- ASBU workshops

ICAO SIP 2012- ASBU workshops B1-70 Increased Runway Throughput through Dynamic Wake Vortex Separation Wake vortex separation can be reduced under certain crosswind conditions. This upgrade requires: Tactical Wind Prediction and Monitor function (for next departure) Strategic Weather function (for planning horizon) Stability of operation to ensure usability/reliability Mid Term (Block I) ICAO SIP 2012- ASBU workshops

ICAO SIP 2012- ASBU workshops B1-30 Service Improvement through Integration of all Digital ATM Information B1-30 - Service Improvement through Integration of all Digital ATM Information Summary Implementation of the ATM Information Reference Model (AIRM) integrating all ATM information using UML and enabling XML data representations and data exchange based on internet protocols. Second step of implementation of digital IM, with the WXXM for meteorological information. Main Performance Impact KPA-01 Access & Equity; KPA-03 Cost-Effectiveness; KPA-10 Safety Domain / Flight Phases All Phases of Flight Applicability Considerations Applicable at State level, with increased benefits as more States participate B1-80 B0-30 B1-30 B2-31 B1-31 B2-35 ICAO SIP 2012- ASBU workshops

Integrated Weather Information B1-105 - Better Operational Decisions through Integrated Weather Information B1-105 - Better Operational Decisions through Integrated Weather Information Summary The primary goal of this module is to enable the reliable identification of applicable air traffic management (ATM) solutions when weather phenomena are impacting, or forecast to impact, aerodromes or airspace. In order to achieve this goal, full ATM-Weather Integration is necessary. ATM-Weather Integration means that weather information is included in the logic of a decision process or aid such that the impact of the weather constraint is automatically calculated and taken into account when the decision is made or recommended. Main Performance Impact KPA-02 Capacity, KPA-04 Efficiency, KPA-09 Predictability, KPA-10 Safety Domain / Flight Phases All flight phases. Applicability Considerations Applicable to traffic flow planning, and to all aircraft operations in all domains and flight phases, regardless of level of aircraft equipage. Benefits accrue and/or costs are avoided as processes and Decision Support Tools (DSTs) employing ATM-Weather Integration concepts and techniques are adopted. B2-31 B1-105 B3-105 ICAO SIP 2012- ASBU workshops

B1-05 - Improved Flexibility & Efficiency in Descent Profiles (OPDs) Summary This module provides the baseline for using Required Navigation Performance (RNP) with Vertical Containment. Vertical RNP is the requirement on vertical system accuracy at the 99.7% probability level. It indicates the normal operating error characteristics of a navigation system. The system is designed to enhance vertical flight path precision during descent, arrival, and while in the non-precision environment and enables aircraft to fly an approach procedure not reliant on ground based equipment for vertical guidance. Main Performance Impact KPA-04 Efficiency Domain / Flight Phases Descent, Arrival, Flight in Terminal Area Applicability Considerations The baseline for this block is Improved Flight Descent Profile enabled by Block B0-5. This block is a component of Trajectory-Based Operations (TBO). B1-5 B3-5 ICAO SIP 2012- ASBU workshops

Challenges - How to Get There? Budget considerations are greater for Block 1 since these modules do involve technology insertion in either ground/air or both. Block 1 has a strong dependency on moving to network based communications for aviation. There are regional synchronization issues of equipage and capabilities to achieve much of Block 1. This is essential to the successful implementation to the future Blocks. Global standards can alleviate such risks and ensure interoperability between regional ANSPs. Global standards also offers stakeholders a common rubric. Aviation System Block Upgrade – Block I ICAO SIP 2012- ASBU workshops

ICAO SIP 2012- ASBU workshops