Ion Commissioning: Thursday & Friday

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Post LS1 operational envelope & MPS implications
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
Saturday 30th June - Sunday: Rocky !
Status of LHC Operations
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Summary of Week 13 G. Arduini, B. Holzer
Thursday morning 09:30 Dump of pPb fill.
Lost at 12:05 to power converter (RTQX2.R1) problem
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
Week 36 Machine coordinators R.Assmann, R.Bailey
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Collimation qualification during the first weeks of the 2011 run
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Ion Commissioning: Thursday & Friday Optics Checks BI Checks Collimation Checks First Ramp Collimation Checks Squeeze B1 Inj., Circ. & Capture B2 Inj., Circ. & Capture 06/11/2010 LHC 9:00 meeting

Debunching at injection 06/11/2010 LHC 9:00 meeting

Friday Morning: Collimation checks at 450 Z GeV Check collimator alignment Gap centers checked for 11 collimators per beam. Reproducibility from proton to ion at 0.4mm level. OK for injection nominal settings and probably for intermediate settings as used at 3.5TeV. Loss maps: Betatron cleaning inefficiency: Leakage to dispersion suppressor: 0.5% - 2% Experimental IR's: clean Arcs: 0.1% RF: clean Loss maps: Momentum cleaning inefficiency: Leakage to dispersion suppressor: 0.5% - 4% Experimental IR's: 10% (TCTH in IR1, b2), 1% (TCTH in IR5, b1) Arcs: 0.3% RF insertion: 0.5% 06/11/2010 LHC 9:00 meeting

Conclusions from Ralph A.: collimation @ 450 GeV Loose about factor 50-100 in cleaning efficiency for ions, compared to protons. This is expected (ion fragmentation and dissociation) Main losses in predicted locations, namely the dispersion suppressor magnets. Maybe losses occur somewhat earlier in space than expected We see a large 10% leakage into IR1 from IR3 losses for beam 2. It is not clear what ion species escapes IR3 and travels to IR1. To be analyzed in detail OK for injection and ramp to 3.5 TeV As ion species form independent "beams" we worry about potential high energy losses into IR1. Therefore request of full set of loss maps at 3.5TeV before a squeeze is performed DONE 06/11/2010 LHC 9:00 meeting

141 BLM screen dumps in 1.5 hours ! Momentum losses B1 -1000Hz Momentum losses B2 -1000Hz 06/11/2010 LHC 9:00 meeting

Asynchronous Beam Dumps at injection Dump protection OK: There was essentially no leakage to the TCTs during the async. dump of both beams, so I think everything is fine! Chiara Bracco 06/11/2010 LHC 9:00 meeting

not uniform signal strength, in general better for vertical BGIs. 06/11/2010 LHC 9:00 meeting

Schottky data – Ralph Steinhagen Plus: Re-verified FB operation - FB's OK 06/11/2010 LHC 9:00 meeting

16:25 start first ramp – no beam losses There is light a bit above 0.5 Z TeV Emittances on flat top: B1; H=5.5 , V=5.6 B2; H=5.8 , V=8.7 Bunch length up at injection, down during the ramp 06/11/2010 LHC 9:00 meeting

More loss-maps at 3.5 Z TeV – ok-ish negative frequency trim of -1000Hz for negative off momentum loss map 06/11/2010 LHC 9:00 meeting

22:15: first squeeze finished: perfect trajectory Wirescans @ injection: B1-H: 4.5 B1-V: 3.1 B2-H: 5.1 B2-V: 4.5 Wirescans afer squeeze: B1-H: 7.1 B1-V: 6.5 B2-H: 6.8 B2-V: 10.1 06/11/2010 LHC 9:00 meeting

First programmed dump at 3.5 TeV No surprises for dump of a bunched beam at 3.5 TeV B2 B1 06/11/2010 LHC 9:00 meeting

Beta Beat Checks at 3.5 Z TeV, squeezed AC-dipole fixed from last night: reboot controls Looks very similar to protons Rogelio 06/11/2010 LHC 9:00 meeting

Work over night Asynch dump tests at flat top to be analysed in detail but looks ok Next ramp: loss maps after the squeeze To be analysed in detail B2: Q_H trimmed to 0.34 06/11/2010 LHC 9:00 meeting

Chromaticity through the ramp 06/11/2010 LHC 9:00 meeting

Plans Saturday Find collisions 2 x 2 bunches Collimation – loss maps Asynchronous dump Stable beams 2 x 2 bunches Sunday Stable beams, increase # bunches 2 x 17, 2 x 128 bunches 04/11/2010 LHC 8:30 meeting