Continuous Process Improvement

Slides:



Advertisements
Similar presentations
Continuous Process Improvement
Advertisements

Project leaders will keep track of team progress using an A3 Report.
Team Swirly Presents Whirlpool’s Dishwasher Rack’s Clips and Coating: Maintaining Quality Though ISO9000 and Six Sigma.
Quality Management System SEETHARAM- Quality Assurance
1 Introduction to the Professional Teaching and Learning Cycle (PTLC)
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Ensuring Quality and Productivity If you forget the customer, nothing much else matters. —Anne Mulcahy, CEO, Xerox Corporation Chapter 2 Copyright © 2010.
Total Quality Management By: Zaipul Anwar Manager, R & D Dept. Business & Advanced Technology Centre UTM.
Part A - QUALITY AS (3.1): Demonstrate understanding of how internal factors interact within a business that operates in a global context.
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
Overview of Lean Six Sigma
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
SYSTEM ANALYSIS AND DESIGN
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
Instructional Design Eyad Hakami. Instructional Design Instructional design is a systematic process by which educational materials are created, developed,
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
CHAPTER 6 CONTROLLING. Copyright © 2005 Prentice Hall, Inc. All rights reserved. 18–2 What Is Control? Control – The process of monitoring activities.
Teaching material for a course in Software Project Management & Software Engineering – part II.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
 Once the system has been installed it will be monitored to check whether it is working correctly. Sometimes problems with a system will not be found.
Systems Life Cycle. Know why it is necessary to evaluate a new system Understand the need to evaluate in terms of ease-of- use, appropriateness and efficiency.
Formulating a Simulation Project Proposal Chapter3.
5.4 Quality Assurance Chapter 33. What is a quality product? A good or service that meets customers’ expectations and is “fit for purpose”. A good or.
PROJECT WORK System Development Cycle. OVERVIEW Project work for the HSC course follows five stages of the traditional system development cycle. The SDC.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 Accounting systems design & evaluation Karen Lau 25 Feb 2002.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Quality Assurance. Define Quality (product & service) Exceeds the requirements of the customer. General excellence of standard or level. A product which.
1 Continuous Process Improvement  Achieve Perfection  Work as Process to make it Effective, Efficient, and Adaptable  Changing Customer Needs  Control.
© 2007 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Walker: Introduction to Hospitality Management, 2 nd edition Chapter 15 Planning.
Management of Quality. Introduction to Quality Quality Gurus W. Edwards Deming W. Edwards Deming Joseph M. Juran Joseph M. Juran Philip B. Crosby Philip.
Government Engineering college Gandhinagar. Subject: Engineering economics & Management Topic: cost Prepared By Name: Enrollment No.: Nikhil Chaudhari.
Project Management Finals Lesson 1 - Principles - Techniques - Tools.
What is Lean…? It is explained in various ways in various languages, ultimately deriving only one goal of removing waste in the production. This is nothing.
Product Lifecycle Management
Systems Analysis and Design
ITIL: Service Transition
Balanced Scorecard: Quality, Time, and the Theory of Constraints
5.4 Quality Assurance Chapter 33.
SIX SIGMA IMPLEMENTATION
Project planning The systems life cycle.
PowerPoint to accompany:
Unit 6 Application Design Sample Assignment.
Introduction to Quality and Statistical Process Control
Product, Branding and Customer-Service Strategies
The Development Process of Web Applications
Fundamentals of Information Systems
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
Software Requirements
Life Cycle Models PPT By :Dr. R. Mall.
CHAPTER 6 CONTROLLING.
VENDORS, CONSULTANTS AND USERS
C H A P T E R C H A P T E R Planning 15.
SUPPLIER PARTNERSHIP 2.
Objective of This Course
Improvement of the integrated information system How the CIT improve the management system colaboran 24 octubre 2017.
Portfolio Management: Course Introduction
Software life cycle models
Systems Analysis and Design
Managing the Planning Process
PowerPoint Presentation to Accompany Chapter 8 of Management Fundamentals Canadian Edition Schermerhorn  Wright Prepared by: Michael K. McCuddy Adapted.
Introduction to Planning
Managing the Planning Process
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
Protect data in core business applications
Comments on Cost of Prediction Error (or Value of Perfect Information)
Managing the Planning Process
Presentation transcript:

Continuous Process Improvement

Problem Solving Method Topics The PDSA Cycle Problem Solving Method

Input/Output Process Model Improvement Strategies The Juran Triolgy Improvement Strategies Types of Problems

Continuous Process Improvement Achieve Perfection through Continuous Improvement

View all Work as a Process Adapting Changing Customer needs Eliminating Waste & Rework Use Benchmarking to improve competitive advantage

Input/Output Process Model FEEDBACK PROCESS People Equipment Method Materials OUTPUT Information Data Product INPUT Materials Money Information OUTCOMES CONDITIONS

The Juran Trilogy Planning Control Improvement

The Juran Trilogy Diagram Quality Planning Quality Control (during operations) Sporadic Spike Cost of Poor Quality 40 Original zone Of Quality control 20 New Zone of Quality Control Operations Begins Chronic Waste (an Opportunity for Improvement Quality Improvement Time Lessons Learned

The starting point is Quality Planning — creating a product, service or process that will be able to meet established goals and do so under operating conditions.

Chronic waste, which is a cost of poor quality that can exist in any process, may exist due to various factors including deficiencies in the original planning. If the waste does get worse (sporadic spike), a corrective action team is brought in to determine the cause abnormal variation. Once the cause(s) has been determined, and corrective action taken, the process again falls into the zone defined by the “quality control” limits.

Maintaining control will not guarantee your business is successful Maintaining control will not guarantee your business is successful. You must constantly challenge your processes and continuously improve them. The Trilogy figure shows that in due course the chronic waste falls to a much lower level, to adhere to a new zone of quality control. Such a reduction does not happen of its own accord. It results from purposeful Quality Improvement or “Breakthrough.”

Improvement Strategies Repair Refinement Renovation Reinvention

Types of Problems Compliance-This occurs when structured system have standard inputs, and outputs perform unacceptable from user point of view Unstructured-Not Specified by Standards Efficiency-User is satisfied, process is costly, working conditions unsatisfactory Process Design-Poor & obsolete design process Product Design-Development stage of product

The PDSA Cycle Act Plan Study Do

Problem Solving Method Phase 1: Identify the Opportunity Phase 2: Analyze the Current Phase Phase 3: Develop the Optimal Solutions Phase 4: Implement Changes Phase 5: Study the Results Phase 6: Standardize the Solutions Phase 7: Plan for Future

Continuous Process Improvement Cycle Phase 1 Identify the Opportunity Phase 2 Analyze The Process Phase 7 Plan for Future Act Plan Study Do Phase 3 Develop the Optimal Solutions Phase 6 Standardize The Solution Phase 6 Standardize The Solution Phase 6 Standardize The Solution Phase 5 Study the Results Phase 4 Implement

Study Results What’s Inspected Type of Data Timing By Whom Type of Record Process Improved Process Variable On -line Device Electronically Automate Equipment Manual Product Sample Attribute Off-line Process Operator Electronically or Manually Process Adjusted Operator Lot Sorted 100% of Product After Lot Complete Inspector Sample Repaired or Discarded

Widespread improvement in society IMPACTS Widespread improvement in society Long term OUTCOMES Intermediate effects on clients Medium term OUTPUTS Products and services delivered Short term ACTIVITIES Tasks transforming inputs to outputs Ongoing INPUTS Financial, human, material resources

Outcome Statements are Derived from identified problems or issues Policy Area: Education From To School buildings are not maintained and are made from poor materials Many Children of rural families are unable to travel to distances to school Improve school structures to meet standards of market economy. Rural children gain equal access to educational services. Schools are not teaching our youth the content they need for the market economy. The poor and vulnerable are falling behind and not getting a decent education. Improved curricula meets market-based economy standards. Children most in need are receiving educational assistance FOR EACH PROBLEM AREA WE FORMULATE AN OUTCOME OUTCOMES PROBLEMS

This is not my JOB

Enough for today