The RAL Front End Test Stand

Slides:



Advertisements
Similar presentations
The Front End Test Stand Collaboration ELECTROMAGNETIC DESIGN OF A RFQ FOR THE FRONT END TEST STAND AT RAL A. Kurup, A. Letchford The RAL front end test.
Advertisements

Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Front end test stand — WP2
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
MEBT Design Considerations The beam energy in the MEBT is sufficiently low for the space charge forces to have a considerable impact on the beam dynamics.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
ISIS Accelerator Division
The RAL Front End Test Stand David Findlay ISIS Accelerator Division Rutherford Appleton Laboratory Oxfordshire, UK STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Ion Source Development at RAL Dan Faircloth Including the work of: Scott Lawrie, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Alexander Aleksandrov Oak Ridge National Laboratory
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
PASI OsC meeting 12th July 2012
Developments of the FETS Ion Source Scott Lawrie.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
The CERN Linac4 history, performance, perspectives
The RAL Front End Test Stand
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Laser-based Beam Diagnostics for the RAL Front End Test Stand
Linac4 Beam Characteristics
Progress in the Multi-Ion Injector Linac Design
Status of the Front End Test Stand April 2007.
Optimisation of the FETS RFQ
H- Ion Source Development
LINAC4 commissioning plans etc.
(i.e. the 4-vane cold model)
Pulsed Ion Linac for EIC
Collective Effects and Beam Measurements in Particle Accelerators
Advanced Research Electron Accelerator Laboratory
commissioning and measurements
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Mechanical Engineering progress for the Front End Test Stand
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Multi-Ion Injector Linac Design – Progress Summary
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

The RAL Front End Test Stand UKNF WP2 The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group UKNF Meeting 10-January 2007

The FETS team John Back (Warwick) Aaron Cheng (Imperial) Mike Clarke-Gayther (ISIS) Adeline Daly (ISIS) Dan Faircloth (ISIS) Christoph Gabor (ASTeC) Simon Jolly (Imperial) Ajit Kurup (Imperial) David Lee (Imperial) Alan Letchford (ISIS) Ciprian Plostinar (ASTeC) Jürgen Pozimski (ASTeC/Imperial) Peter Savage (Imperial)

FETS main components: High brightness H- ion source. Magnetic Low Energy Beam Transport (LEBT). High current, high duty factor Radio Frequency Quadrupole. Very high speed beam chopper. Comprehensive diagnostics.

Magnetic LEBT A 3 solenoid magnetic LEBT at 65 keV is being designed at Warwick, based on the one successfully used on the ISIS RFQ pre-injector upgrade. A magnetic LEBT has some disadvantages: increased length and solenoid aberrations can cause emittance growth; uncertainties surround the space charge neutralisation process. However an electrostatic LEBT has been rejected due to the close proximity of the caesiated ion source.

Optimisation of the magnetic design, based on available beam data, is nearing completion.

An initial beam optics design has been completed An initial beam optics design has been completed. Further optimisation will be carried out based on the results of the Mk II pepper-pot measurements. First simulations used an idealised beam of the required emittance based on ISIS LEBT measurements.

Recent simulations have used distributions from the first data analysis of the Mk I pepper-pot results. Beam at LEBT entrance from measurement

Given that the emittance of this beam is at least twice that required for FETS the results are very encouraging.

324 MHz RFQ A 0.5 m, 324 MHz 4-vane RFQ cold model is almost complete. The cold model designed at IC contains all the significant features of the final 4 m long design. Machining operations were tested in Aluminium initially

A braze test piece has been completed

Machining of the cold model segments was 90% complete Machining of the cold model segments was 90% complete. Frustratingly the IC workshop resource became unavailable so machining remained 90% complete. Daresbury laboratory agreed to make the final cuts and machining has started again this week.

A computer controlled bead pull perturbation system is under development at IC to perform cavity field measurements on the cold models

Initial tests have been performed on a pill-box cavity and simple 4-rod RFQ model with good results.

An initial beam dynamics design has been completed at RAL for the FETS 324 MHz RFQ. It showed negligible emittance growth and 94% transmission for an ideal 60 mA beam. Further optimisation is expected.

High speed beam chopper A novel tandem chopper technique has been developed at RAL to overcome the conflicting requirements of fast rise time (< 2ns) and long flat-top (up to 100 s). A ‘fast’ chopper creates a short, clean gap in which a ‘slow’ chopper can switch on. The fast pulser is limited in flat-top but can switch between bunches. The slow pulser cannot switch between pulses but can generate the required flat-top.

A state of the art fast switch developed for RAL has achieved ±1 A state of the art fast switch developed for RAL has achieved ±1.4 kV with rise and fall times less than 2 ns.

A trimmable helical structure with adjustable delays is being investigated as a replacement for the more ‘typical’ meander line due to higher efficiency. Adjustable L-C trimmer Adjust cable lengths to change delay

Three chopper line optics designs are under investigation Three chopper line optics designs are under investigation. A short line keeps the emittance growth low but makes chopping harder and requires some challenging technology. A long line is ‘easier’ but controlling the emittance is more challenging.

The shortest solution will require novel, compact, high gradient quadrupoles and DTL-like cavities. Hybrid PM and EM quads are being investigated. CCL type cavity DTL type cavity

Detection of distribution Diagnostics Accurate diagnostics are essential for FETS to be successful. In addition to more usual diagnostic devices, non-destructive laser stripping techniques will be employed. Photo detachment Detection of distribution Charge separation - “no” momentum transfer I(t,y,x)-> 2 D profile, transv. e magnetic dipole I(t,y)-> profile, long. e (TOF)

The IAP Frankfurt laser transverse emittance measurement system will be developed further on FETS. Initial investigations have begun at RAL.

2D beam profile measurement through laser tomography is being studied at IC for use on FETS. Electron Collection Laser photo-dissociation

Two orthogonal projections gives the X & Y profiles but coupling information is lost.

Using pairs of mirrors covering 90 sectors allows 2D reconstruction.

A preliminary design of a 4 mirror system has been completed A preliminary design of a 4 mirror system has been completed. The first nano-positioning stages and lasers for tests have been purchased.

FETS Building R8 at RAL The ground floor of R8 has been taken over for FETS. Refurbishment is almost complete.

FETS High Power Klystron The Toshiba E3740A 2MW high power pulsed klystron has been delivered to R8. European tender started for klystron PSU.

Next Steps In 2007 we hope to: Complete building work in R8. Install component support structures. Continue ion source characterisation, install and commission ion source in R8. Complete LEBT design, procure (and install) LEBT. Complete the RFQ cold model and test. Define the high and low power RF systems and RFQ coupling. Procure klystron PSU and test components. Characterise PM quadrupoles. Finalise MEBT design. Test prototype chopper structures. Define and order vacuum system. Commission pepperpot MKII. Laser tomography and laser emittance tests and finalise designs. Define control system. Review radiological aspects and design shielding. Other stuff …