Asia-Pacific Energy Regulatory Forum

Slides:



Advertisements
Similar presentations
Demand Response Commissioner Suedeen Kelly June 3, 2008.
Advertisements

Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Presentation to WECC Market Interface Committee March 24, 2015
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Demand Response in Midwest ISO Markets February 17, 2008.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Retail Competition: Managing a Difficult Transition David L. O’Connor Commissioner Massachusetts Division of Energy Resources (DOER) Presentation to National.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Reliability Demand Response Product February 25, 2011
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
FERC Staff’s Report on Demand Response and Advanced Metering.
An Overview of Demand Response in California July 2011.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
1 A Conversation about MISO Paul Spicer November 8, 2007.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
ISO Confidential Climate & Energy Law Symposium University of San Diego School of Law Karen Edson Vice President Policy & Client Services November 6, 2015.
Renewable Energy Challenges: System Stability
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Transmission-Distribution Interface Working Group Meeting
Wind Management at MISO
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
FERC Standard Market Design Working Papers
Alternative Approach for Loads in SCED v.2
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
The Future of Demand Response in New England
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
CPDe Event The Changing Value in Flexibility 19th April 2018.
New England Electricity Restructuring Roundtable
Benefits of New England’s Proposed Capacity Market
Trends in U.S. Electric Power Markets and Renewable Integration
Enhanced Proxy Demand Resource: ESDER 3 PDR-LSR
Forecasting and Operations CAISO Case
DECISION
Update on Energy Imbalance Market
Solar Energy Commercialization
Wholesale Electricity Costs
Energy Supply Business Model enabled by the Clean Energy Package
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
The Future Grid and Energy Storage
Presentation transcript:

Asia-Pacific Energy Regulatory Forum Federal Energy Regulatory Commission Flexibility and Market Efficiency Rama Zakaria Advisor Federal Energy Regulatory Commission September 28, 2016 Seoul, South Korea

Disclaimer The views in this presentation are those of the presenter and do not necessarily represent the views of the Federal Energy Regulatory Commission

Outline Changing Market Environment Need for Flexibility Options to Increase Flexibility Importance of Market Reforms Wholesale Market Reforms FERC Reforms Demand Response Integration of VERs Ancillary Services Price Formation Removing Barriers to Participation of Energy Storage RTO/ISO Reforms: CAISO Retail Market Reforms

Changing Market Environment Technological Development and Innovation Increased penetration of VERs and DERs Increased reliance on NG Dynamic Load New Technologies creating options – e.g. energy storage Federal and State Public Policies Consumer Preference Fuel Supply and Demand

Renewable Portfolio Standards

Need for Flexibility The ability of a power system to respond to change in demand and supply Source: National Renewable Energy Laboratory

Need for Flexibility: CAISO January 2020 Source: California Independent System Operator (CAISO)

Options to Increase Flexibility Source: National Renewable Energy Laboratory

Importance of Market Reforms Market reforms enable the transition to a 21st century power grid that is efficient, reliable, and sustainable Provide accurate price signals and recognize the value resources provide to the grid including flexibility Support high penetration of VERs Reduce vulnerabilities and improve service reliability Promote efficiency and transparency Remove barriers to participation of new technologies – e.g. energy storage Enable DERs to provide grid services Reduce system costs and save ratepayers money Enable customer participation and business model innovation

FERC: Demand Response Demand Response (DR) occurs when electricity customers change consumption patterns in response to the grid needs When aggregated over enough customers, DR becomes a major resource that can be used to manage the grid’s variability in the short-term and avoid overbuilding the system in the long-term by cutting down peak demand Demand Response Order 745 Issued in 2011 and upheld by the Supreme Court in Jan. 2016 Requires grid operators to pay DR resources that provide a net benefit to the system the locational marginal price (LMP) that it pays generators in energy markets Gave electricity markets access to a new cost-effective resource and contributed to the development of DR in capacity and ancillary service markets

FERC: Integration of VERs Integration of Variable Energy Resources (VERs) Order 764 (2012) Allows for more efficient integration of VERs Requires transmission providers to offer customers the option of scheduling transmission service on a more frequent intra-hour basis, in intervals of at least 15 minutes Requires new interconnection customers with VERs facilities to provide meteorological and operational data to transmission providers to allow for more accurate power production forecasting

FERC: Ancillary Services Frequency Regulation Compensation Order 755 (2011) Requires compensation of frequency regulation based on actual service provided (capacity and performance payment) Third Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies Order 784 (2013) Sale of Primary Frequency Response at Market-Based Rates Order 819 (2015) Notice of Inquiry on Provision and Compensation of Primary Frequency Response (February 2016) Reactive Power Requirements for Non-Synchronous Generation Order 827 (June 2016)

FERC: Price Formation In 2014, FERC initiated a proceeding to explore opportunities for improving price formation in energy and ancillary services markets Settlement Intervals and Shortage Pricing Order 825 (June 2016) Requires RTOs/ISOs to: (1) align settlement and dispatch intervals; and (2) trigger shortage pricing for any dispatch interval during which a shortage of energy or operating reserves occurs Notice of Proposed Rulemaking on Offer Caps (January 2016) Propose to cap each resource’s incremental energy offer at the higher of $1,000/MWh or the resource’s verified cost-based offer Order Directing RTO/ISO Reports (November 2015) Pricing of fast-start resources Commitments to manage multiple contingencies Look-ahead modeling Uplift allocation Transparency

FERC: Removing Barriers to Participation of Energy Storage Request for Information on barriers to participation of energy storage in FERC energy, capacity, and ancillary services markets (April 2016) Data requests from RTOs/ISOs and request for public comments Information requested includes: Eligibility of electric storage resources to participate in RTO/ISO markets Technical qualification and performance requirements for market participation Bid parameters for different types of resources Opportunities for distribution-level and aggregated electric storage resources to participate in the markets Treatment of electric storage resources when receiving electricity for later injection to the grid

RTO/ISO Reforms: CAISO Western Energy Imbalance Market (EIM) Launched in November 2014 EIM Entities: CAISO, PacifiCorp, NV Energy. Puget Sound Energy and Arizona Public Service to join in October 2016 Benefits More efficient dispatch Reduced renewable energy curtailment Reduced need for flexibility reserves Flexible Resource Adequacy Criteria and Must Offer Obligation (FRAC-MOO) Requirement to procure flexible resource capacity Flexible Ramping Product Distributed Energy Resource Provider (DERP), June 2016 Extends market participation to distributed energy resources <0.5 MW – current minimum threshold – by allowing distribution system level aggregation

Retail Market Reforms California Public Utilities Commission Energy Storage Distribution Resources Plans (DRP) Integrated Distributed Energy Resources (IDER) Energy Storage and Distributed Energy Resources (ESDER) – joint effort with CAISO New York Public Service Commission: Reforming the Energy Vision (REV) Distribution System Platform (DSP) Provider Ratemaking Reforms to support DSP Provider model Market-Based Earnings (MBEs) Incremental Ratemaking Reforms Rate design Reforms