GRWG/GDWG Joint Web Meeting Agenda

Slides:



Advertisements
Similar presentations
22 March 2011: GSICS GRWG & GDWG Meeting Daejeon, Korea Tim Hewison SEVIRI-IASI Inter-calibration Uncertainty Evaluation.
Advertisements

Combining Multiple References GSICS Web Meeting
Xiangqian Wu and Mitch Goldberg NOAA/NESDIS Center for Satellite Applications and Research (STAR) P1.16 GLOBAL SPACE-BASED INTER-CALIBRATION SYSTEM (GSICS)
JMA Report 24 Mar 2009 Yoshihiko Tahara Incorrect RMA equation reported in the January meeting GSICS correction for MTSAT –Don’t we need standard GSICS.
GRWG Agenda Item Towards Operational GSICS Corrections for Meteosat/SEVIRI IR Channels Tim Hewison EUMETSAT 1.
GSICS Data and Products Servers Volker Gärtner (EUMETSAT) For GSICS Data Working Group.
GSICS GDWG Report, Toulouse, 9 February GSICS Data Working Group Status Report V. Gaertner CMA, EUMETSAT, JMA, KMA, NOAA/NESDIS, WMO.
2015 GSCIS annual meeting, March, 2015, New Delhi, India 1 GDWG Agenda Item New GSICS Products Masaya Takahashi, JMA CMA, CNES, EUMETSAT, ISRO, IMD,
GSICS Procedure for Product Acceptance (GPPA) WorkFlow GCC Presented by Fangfang Yu 12/03/
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
1.Bob Iacovazzi (NOAA) - Road to Pre-operational Phase Presentation 2.All – Discussion & Feedback 3.Tim Hewison (EUMETSAT) – Reminders: Korea, Conference,
2013 GSICS Joint Meeting, Williamsburg VA, USA, March GSICS Collaboration Servers Status: 2013 Peter Miu (EUMETSAT) CMA, CNES, EUMETSAT, ISRO,
Highlights (Actions) of GSICS Exec Panel 30 October 2009 Volker Gärtner.
GSICS Baseline Website Review
Marianne König, Tim Hewison, Peter Miu
GSICS Baseline Review: Tools – e.g. GSICS Bias Plotting Tool
Strategy for combining corrections for VIS/NIR+IR channels and plotting tool S. Wagner, T. Hewison (EUM) M. Takahashi (JMA)
GDWG Agenda Item: Tools for GRWG activities
Jerome Lafeuille WMO Space Programme Office
GSICS Collaboration Servers a Vehicle for International Collaboration Status 2011 Peter Miu EUMETSAT.
GSICS Instrument Event Logs: Rational and Draft Template
Review of EUMETSAT’s GEO-LEO Correction
Report from KMA 17th GSICS Executive Panel, Biot, 2-3 June 2016
Report to 8th GSICS Exec Panel
GDWG Agenda Item Existing netCDF Format Updates
Reviewing the GSICS Data Management Working Group Terms of Reference
KMA GDWG Activity Progress Report
GDWG Agenda Item Repository for GSICS Work - Clarification on Archiving Masaya Takahashi, JMA CMA, CNES, EUMETSAT, ISRO, IMD, JAXA, JMA, KMA, NASA, NIST,
Requirements for GSICS Plotting Tool to support VIS/NIR products
Updates on GSICS Operation Plan
Masaya Takahashi Meteorological Satellite Center,
GSICS GDWG/GRWG Joint meeting, Toulouse
Fangfang Yu and Fred Wu 22 March 2011
5g. Repository For GSICS Work Use of github for codes etc
Actions and Recommendations of the Joint Session
GDWG Agenda Item Baseline Reviews: Website
Review of MSU/AMSU Re-Calibration Product
Closing the GEO-ring Tim Hewison
JMA Agency Report 2017 Arata Okuyama, Masaya Takahashi and Hidehiko Murata Meteorological Satellite Center, Japan Meteorological Agency.
Update on the GSICS Procedure for Product Acceptance (GPPA)
Combining Multiple References
Annual GSICS Calibration Report for {Agency}
Masaya Takahashi (JMA), Dohyeong Kim (KMA),
2b. GSICS Coordination Centre (GCC)
AHI IR Tb bias variation diurnal & at low temperature
Updating GSICS Plotting Tool to support VISNIR products
GSICS Coordination Center GSICS EP- Debrief
Infrared Inter-Calibration Product Announcements
JMA Agency Report 2018 Masaya Takahashi, Yusuke Yogo and Hidehiko Murata Meteorological Satellite Center, Japan Meteorological Agency.
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 01 January 2019 Report of GRWG: Aims of meeting Review of Actions Proposal.
KMA Agency Report NMSC/KMA
Dorothee Coppens.
GOES DCC Deseasonalization & AHI DCC Calibration
GRWG+GDWG Web Meeting on Calibration Change Alerts
Use of GSICS to Improve Operational Radiometric Calibration
Developing GSICS products for IR channels of GEO imagers Tim Hewison
Masaya Takahashi1, Yusuke Yogo1, Qiang Guo2, Xiuqing Hu2, and Na Xu2
Summary of 2019 GDWG breakout session
GSICS Products’ Improvements and Developments
Jörg Schulz (EUMETSAT) - Re-calibration of Meteosat archive using HIRS
Tim Hewison1 and all GSICS Developers EUMETSAT
Presentation of GSICS Inter-Calibration Results - Web Displays
Template for GSICS Bias Monitoring Web Pages
GSICS Data Management Working Group Summary and Action Items
Infrared Sub-Group Report Tim Hewison
Masaya Takahashi Japan Meteorological Agency
Defining the Products: ‘GSICS Correction’
Masaya Takahashi1, Yusuke Yogo1, Qiang Guo2, Xiuqing Hu2, and Na Xu2
Midnight calibration errors on MTSAT-2
Towards a GSICS DCC product...
Presentation transcript:

GRWG/GDWG Joint Web Meeting Agenda Review of Agenda Approval of Minutes Discussion of ATBD Harmonization – in coordination with GPRCs Focus on GSICS Correction Harmonization – in coordination with GDWG File and variable name Archive strategy Suggestions/Discussions Review of Actions Any Other Business Next Meeting Date and Time Key issues Meeting Adjourned 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting Approval of Minutes Web meeting on 26 Mar 2009 Minutes drafted 2 Apr 2009 Discussion continued till 14 Apr 2009 Revised accordingly and distributed Special meeting on 12 May 2009 Move to approve both minutes 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting ATBD Issues (1 of 4) Y. Tahara suggested Tb-based GSICS Correction JMA and CMA disseminate scaled Tb, unlike EUMETSAT and NOAA who disseminate scaled radiance It was later confirmed that the scaled Tb can be converted to radiance easily without invoking Planck’s function and spectral response function etc. GRWG recommends harmonized products when possible JMA agreed on radiance-based GSICS Correction 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting ATBD Issues (2 of 4) Y. Tahara and A. Okuyama suggested alternative regression to properly account for LEO uncertainty GRWG welcomes the suggestion GPRCs are encouraged to further study this and other options GPRCs are free to select the option optimal for their applications, however the advantage of the choice should be documented. 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting ATBD Issues (3 of 4) X. Wu suggested amending the GSICS data flow with “Products” at the end A collection of GSICS products, extracted or derived from Statistical and other data, to serve as interface with users. R. Iacovazzi amended that all and only Products should be subject to GSICS Approval M. König and T. Hewison amended that initial product should be GSICS Correction (formula and coefficients) only Other useful information, such as bias before and after correction, can be added later No consensus yet No change at present May be discussed in future if relevant 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting ATBD Issues (4 of 4) X. Wu suggested each ATBD be focused on a particular GEO-LEO pair Current structure requires recommending one option for a class Sometimes trivial, e.g., gap filling scheme for IASI-based algorithm Sometimes difficult, e.g., collocation for GPRCs with and without specialized information (orbit pointing) and software (McIDAS). No consensus yet No change at present With EUMETSAT ATBD as example, GPRCs should be able to handle May be discussed in future if relevant 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting ATBD Issues Any others? 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Harmonization Among GPRCs Focus on GSICS Correction formula and coefficients only Following is status at NOAA, using the simplest case (GOES-11 10.7 m channel) as example to explore the path Open to comments 2 Jun 2009 Joint GRWG/GDWG Web Meeting

GSICS Correction Status at NOAA Regression: RGEO = slope * RLEO + intercept RGEO & RLEO: radiance from GEO & LEO Slope and intercept: regression coefficients, weighted with stdv_env Indication of nonlinearity will be investigated further 2 Jun 2009 Joint GRWG/GDWG Web Meeting

GSICS Correction Status at NOAA Smoothing – Theoretical basis: GEO bias can vary slowly (seasonal and beyond) in unknown fashion Smoothing period should be reasonably short to catch this variation GEO bias can also vary diurnally Particularly for 3-axis stabilized platforms Will be investigated separately GEO bias does not vary day-to-day (absent of special event) Smoothing period should be reasonably long (more than one day) to smooth out regression uncertainty Two ways of smoothing Running average of regression results from daily collocations Running period of regression 2 Jun 2009 Joint GRWG/GDWG Web Meeting

GSICS Correction Status at NOAA GSICS Corrected GEO Radiance RGSICS = 1/slope * RGEO - intercept/slope Amount of Correction Correction = RGSICS - RGEO 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Recursive Regression to Identify and Remove Outliers Time period: 2009048-2009052 (5 days) Daytime Linear regression weighted with inverse of FOV std radiance unfiltered filtered Outliers Systematic under-estimate of GOES-11 radiance at both low and high ends – nonlinearity? 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting Running average = 5 days Regression period = 10 days GEO – LEO azimuth < 40 degree Daytime collocation Over the Ocean collocation Otherwise, all the collocation pixels used Running average = 5 days, Regression period = 10 days, GEO – LEO azimuth < 40 degree, Daytime collocations over ocean. No recursive regression. 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting Running average = 5 days Regression period = 15 days GEO – LEO azimuth < 40 degree Daytime collocation Over the Ocean collocation Otherwise, all the collocation pixels used 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting 2-D Distribution of GSICS radiance correction for GOES11 channel 10.7um Running average = 1 Regression period = 10 Running average = 1 Regression period = 30 Running average = 5 Regression period = 10 Running average = 5 Regression period = 30 This slide confirms that regression period is the dominant factor to smooth the daily GSICS correction 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting 2-D Distribution of GSICS radiance correction for GOES11 channel 10.7um Running average = 5 days Regression period = 30 days Strong seasonal variations for the cold scenes Significant warming correction trend for the warm scenes Larger correction for the cold scenes than the warm scene 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting 2-D Distribution of GSICS radiance correction for GOES11 channel 10.7um Running average = 5 days Regression period = 60 days 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting 2-D Distribution of GSICS radiance correction for GOES11 channel 10.7um Running average = 5 days Regression period = 90 days 2 Jun 2009 Joint GRWG/GDWG Web Meeting

GSICS Correction Status at NOAA Discussions: 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Harmonization with GDWG File and variable name Archive strategy Suggestions/Discussions 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting Review Actions 30 Jan 2009 Members shall carry out the modified GSICS 2009 Operation Plan by December 2009 All GPRCs shall prepare its ATBD, to be reviewed at the web meeting in May 2009 and submitted to GCC by June 2009. NOAA shall distribute its ATBD before the web meeting in March 2009. All GPRCs shall routinely produce the GSICS Correction for its GEO by March 2009, with its choice of algorithm and format for the product. The documentation and harmonization of the GSICS Correction shall be discussed at the March and May web meetings. The initial release shall occur by June 2009. NOAA GPRC shall produce GSICS Correction for all GEOs by March 2009, using a common baseline algorithm to facilitate algorithm comparison and improvement. All GPRCs shall evaluate the Product Acceptance Procedure with the LEO-LEO products and a GSICS product of its choice, and provide feedback on scientific criteria to be met by GSICS products by June 2009. B. J. Sohn shall coordinate with CMA, JMA, KMA, NOAA, and NASA to identify the targets by June 2009. F. Wu shall coordinate a review of GSICS Implementation Plan by December 2009. Color code: Complete / On Schedule / Delayed / Need Revision 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Review Actions – Web Meetings All participants to upload the presentations by Friday prior to the meeting (May 2009). JMA to prepare a report on the difference between AIRS and IASI they recently characterized (June 2009). JMA to inform GSICS EP (through Secretariat J. Lafueille) of the personnel change (CLOSED). CMA to inform GSICS EP (through Secretariat J. Lafueille) of the personnel change (CLOSED). KMA to distribute a detailed description of selecting additional sites for SADE (CLOSED). EUMETSAT and NOAA to submit complete ATBD, defined in a hierarchical structure following T Hewison's example. 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting Any Other Business Suggestions? 2 Jun 2009 Joint GRWG/GDWG Web Meeting

Joint GRWG/GDWG Web Meeting Next Meeting Date and time Key issues Meeting Adjourned 2 Jun 2009 Joint GRWG/GDWG Web Meeting