Presentation is loading. Please wait.

Presentation is loading. Please wait.

GSICS Coordination Center GSICS EP- Debrief

Similar presentations


Presentation on theme: "GSICS Coordination Center GSICS EP- Debrief"— Presentation transcript:

1 GSICS Coordination Center GSICS EP- Debrief
06 December 2018 GSICS Coordination Center GSICS EP- Debrief Larry Flynn and Manik Bali 2018 webmeeting Bangalore, India 17 July 2018

2 Disclaimer "The contents of this presentation are those of the authors and do not necessarily reflect any position of the US Government or the National Oceanic and Atmospheric Administration."

3 Outline GCC Activities EP Guidance Discussions at EP meeting
Summary of Actions

4 GCC presented on the following activities
GCC Activities Global participation in GSICS activities GSICS Quarterly Newsletter Meeting Support GSICS Product Status New products accepted in past year GSICS Action Tracker New Feature added on Product Catalog GSICS References

5 EP guidance was sought on the following topics:
Approval of the new format of Product Catalog, available at GPPA - Demo Phase -: A comprehensive discussion on GPPA ensued ( see following slides) New exceptions a) RAC files –single/multiple, applied to DCC product. J1-CrIS and IASI-B are not yet GSICS references. GSICS Cloud, Internet and Wiki presence : Actions were generated to address this point NOAA-GCC-GDWG <-> WMO need collaboration/cross visits to harmonize cloud usage and meet future demands of data warehousing and publishing. 4. GSICS, 3-G and WIGOS: Actions were generated to address this point There has been increased collaboration between GNSS – GRUAN – GSICS. Within the WIGOS system this has made a highly positive impact contributing to vital validation activities of L1B Climate records and direct instrument monitoring particularly in the Microwave and IR wavelengths. We now have GSICS POC in GRUAN and GRUAN POC in GSICS Should regular updates be provided to EP on 3G and WIGOS ? Should we have a GSICS POC in WIGOS ?

6 1. New Feature on GSICS Product Catalog
Following Actions to improve GSICS Product Catalog in 2018 Annual Meeting, GCC- NOAA-GDWG has added new features to the Catalog Product Type Algorithm Type Data Producer Maturity Level Monitored Instrument Reference Instrument Version Data Start Date Data End Date Docs / Data Links Prime Re-analysis correction GEO-LEO Prime IR EUMETSAT Demonstration MSG-1 SEVIRI IASI-A 6/1/2008 Present Docs Data MSG-2 SEVIRI MSG-3 SEVIRI 8/12/2012 MSG-4 SEVIRI 9/8/2015 Re-analysis Correction GEO-LEO IR 3

7 2. GPPA discussion Outline
GCC Product Status Products in Pre-Op Status  What’s needed? Products in Demo Phase  What’s needed to assign operational maturity? Fast Tracking Product Maturity Apply family clause Auto maturity Reduce GPPA Complexity

8 2. Products in Pre-Op Status
Product Type Algorithm Type Data Producer Maturity Level Monitored Instrument Reference Instrument Version Data Start Date Data End Date Docs URL Data URL Re-analysis Correction GEO-LEO IR NESDIS Preoperational GOES-13 Imager IASI-A 1 4/16/2010 Present Docs Data GOES-15 Imager 8/23/2011 Near-Real Time Correction 1/16/2013 Products are not accessible.

9 2. Products in Demo-KMA Product Maturity.
Product Type Algorithm Type Data Producer Maturity Level Monitored Instrument Reference Instrument Version Data Start Date Data End Date Docs URL Data URL Near-Real Time Correction GEO-LEO IR KMA Demo COMS Imager IASI-A 1 31/1/2017 Present Docs Data Product Maturity. Peer reviewed Published impact reports available. Need User Guide (Can be relaxed as GSICS products can have common user guide) Uncertainty Analysis (Does not impact usage of product)

10 2. Products in Demo-JMA Product Maturity.
Product Type Algorithm Type Data Producer Maturity Level Monitored Instrument Reference Instrument Version Data Start Date Data End Date Docs URL Data URL Re-analysis Correction GEO-LEO IR JMA Demonstration Himawari-8 AHI IASI-A 1 3/6/2015 Present Docs Data IASI-B Aqua AIRS MTSAT-2 Imager 12/13/2012 3/9/2016 Aqua AIRS and IASI-A Product Maturity. H8/9 Uncertainty Analysis available MTSAT not available Need Users’ Guide (Bias too small to show any user cases, common user guide can be used).

11 2. Products in Demo-ISRO Product Maturity. Uncertainty Analysis Need
Product Type Algorithm Type Data Producer Maturity Level Monitored Instrument Reference Instrument Version Data Start Date Data End Date Docs URL Data URL Near-Real Time Correction GEO-LEO IR ISRO Demonstration INSAT-3D Imager IASI-A 1 2/19/2016 Present Docs Data INSAT-3D Sounder Product Maturity. Uncertainty Analysis Need Users’ Guide Impact report

12 2. Fast Tracking maturity. EP Guidance
EP Guidance needed for GPPA A. For Classical products we can wave off the Users’ Guide requirement. Perhaps prepare a common users’ guide. B. A common ATBD also can be prepared. This would lessen documentation required in GPPA (Might help MTSAT-2 Himawari 8/9 and COMS). We could seek of these information: Uncertainty estimates OR Regular use of inter-calibration coefficients OR Maturity of L1B radiances (Mitch Goldberg et al.) EP was sought on assigning maturity to products that have stopped being generated.

13 2. GPPA Discussions and Actions
Discussion: Relax the requirement for a User Guide for classical GSICS products. Discussion: Relax the requirement for Uncertainty analysis. This can be complimented by an Impact Report showing the benefit of using Cross-Calibration products. Promotion could weigh whether Input L1B measurements are taken from Operational data processing streams of host agencies. A.GCC GCC to simplify and stream line GPPA checklist and share it with members to fast track maturity; Start with KMA and JMA. GCC A.GCC GCC to provide recommendations on new processing and science maturity levels for GSICS products and services

14 3. GSICS Cloud, Internet and Wiki presence
The GCC registered the gsicswiki.net domain for the next five years. It is envisaged that this will help to reduce the overhead of porting the GSICS wiki from the UMD Atmospheric and Oceanic Science Department to the UMD ESSIC. GCC-GDWG-NOAA maintain the GSICS Product Catalog. WMO is moving to a cloud infrastructure. NOAA has access to cloud infrastructure ( Azure, Google, AWS). Its accessibility for GSICS is being explored. A.WMO WMO to provide information on WMO cloud to NOAA-GDWG. Information sought includes(Visibility, Ability to download data, Disk Space and Redundancy) WMO

15 4. GSICS, 3-G and WIGOS In the lead up to the Microwave Subgroup’s initiative with GRUAN with the aim of using GRUAN measurements to validate GSICS monitoring, the EP gave the following action to the GCC. A.GCC GCC to contact GRUAN POC in GSICS ( Tony/Ralph/Cheng-Zhi) to submit yearly updates on 3G (GRUAN-GSICS-GNSS) collaboration to EP GCC EP-20 GCC

16 Miscellaneous A.GCC&GRWG .20180601.13
GCC/GRWG to develop consensus on contents of intermediate collocation products to be shared with users GCC/GRWG EP-20 GCC A.GEP&GCC& GRWG&GDW G Encourage submission of papers on GSICS in Joint NOAA EUMETSAT Conference o be organized around Oct 2019 in Boston, USA A.GCC GCC to develop harmonized interface for the instrument performance monitoring website as a baseline for inquiring instrument status. Demo by ISRO GCC/ISRO

17 Thank You


Download ppt "GSICS Coordination Center GSICS EP- Debrief"

Similar presentations


Ads by Google