NOGRR-169 OWG discussion Bill Blevins June 28, 2017.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
Transition from Q1- 8th to Q1- 9th edition
PER
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
FRCC Fall Compliance Workshop October , 2013
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Allan Wick, CFE, CPP, PSP, PCI, CBCP Chief Security Officer WECC Joint Meeting October 8, 2014.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
April 23 rd OWG UFLS Survey & Power Factor Review.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Assessing Compliance. 2 NERC Compliance Workshop 11/02/07 Documentation of Compliance with NERC Reliability Standards Jeff Whitmer.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
WPPI – Member Reliability Standards Compliance 2007 APPA National Conference Given by Mike Stuart June 25, 2007.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Date CIP Standards Update Chris Humphreys Texas RE CIP Compliance.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Enterprise Data Warehouse Section 8 – Performance Monitoring.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
© CONSTELLATION ENERGY GROUP, INC. THE OFFERING DESCRIBED IN THIS PRESENTATION IS SOLD AND CONTRACTED BY CONSTELLATION NEWENERGY, INC., A SUBSIDIARY.
Dennis Glass Compliance Analyst III January 21, 2016 PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Talk with.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Electrical Buses and Outage Scheduling.
ERCOT SYSTEM PLANNING Dynamic Model Data Management.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
UFLS Survey Explanation
MOPC Meeting Oct , 2016 Little Rock, AR
PLWG Review 6.9 and the Interconnection process
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
Updated ERO Enterprise Guide for Internal Controls
NERC Entity Registration and Certification in the ERCOT Region
After the FCC Form 471 E-rate Program Applicant Training
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reducing “Unknown” Misoperation Causes
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Compliance Report to ERCOT TAC February 2007
PRC Implementation Plan and Summary of Devices
NERC TPL Standard Overview
GTEC 2017 Annual UST Management & Compliance Assistance Seminar
NERC Cyber Security Standards Pre-Ballot Review
Compliance Open Webinar
Workshop Session 1: Overview
Workshop Session 1: Overview
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
TRTR Briefing September 2013
Reliability Assurance Initiative (RAI) 101
Compliance Open Webinar
Reducing “Unknown” Misoperation Causes
WECC – NERC Standards Update
Presentation transcript:

NOGRR-169 OWG discussion Bill Blevins June 28, 2017

Agenda Overview of PRC-002-2 Existing ERCOT Guides Alignment of Guides with PRC-002

Phased in PRC-002-2 Each Transmission Owner, and Generator Owner shall maintain documentation to demonstrate compliance with PRC-018-1 until that entity meets the requirements of PRC-002-2 in accordance with the NERC Implementation Plan. PRC-018-1 Midnight of the day immediately prior to six (6) years after the effective date of PRC-002-2 in the particular jurisdiction in which the new standard is becoming effective.

Implementation Plan for PRC-002-2 Requirements R1 and R5 (07/01/2016): R1 covers sequence of events recording (SER) and fault recording (FR) identified by Transmission owners using attachment 1 as the methodology. Requires Transmission Owners to identify and notify BES locations for SER and FR. R5 covers dynamic Disturbance recording (DDR) and is identified by ERCOT. Evaluate the list every 5 years.

Implementation Plan for PRC-002-2 Requirements R2, R3, R4, R6, R7, R8, R9, R10, R11: Entities shall be at least 50 percent compliant within four (4) years of the effective date of PRC-002-2 and fully compliant within six (6) years of the effective date. Entities that own only one (1) identified BES bus, BES Element, or generating unit shall be fully compliant within six (6) years of the effective date. Entities shall be 100 percent compliant with a re-evaluated list from Requirement R1 or R5 within three (3) years following the notification by the TO or the Responsible Entity that re-evaluated the list.

Implementation Plan for PRC-002-2 Requirements R12 (10/01/2016): Each Transmission Owner and Generator Owner shall, within 90-calendar days of the discovery of a failure of the recording capability for the SER, FR or DDR data, either: Restore the recording capability, or Submit a Corrective Action Plan (CAP) to the Regional Entity and implement it.

Guide Revision summary 6.1.1, Introduction 6.1.2, Fault Recording Equipment 6.1.2.1, Triggering Requirements 6.1.2.2, Location Requirements 6.1.2.3, Data Recording Requirements 6.1.2.4, Data Retention and Reporting Requirements 6.1.2.5, Maintenance and Testing Requirements (delete) 6.1.3, Phasor Measurement Recording Equipment 6.1.3.1, Recording Requirements 6.1.3.2, Location Requirements 6.1.3.3, Data Recording and Redundancy Requirements 6.1.3.4, Data Retention and Reporting Requirements 6.1.4, Maintenance and Testing Requirements (new) 6.1.4, Equipment Reporting Requirements 6.1.5, Review Process 8, Attachment M, Selecting Buses for Capturing Sequence of Events Recording and Fault Recording Data (new)

Guide Revision summary ERCOT proposes a new attachment to Section 8, rather than broadly referencing the North American Electric Reliability Corporation (NERC) Reliability Standards. The new attachment is consistent with Attachment 1 to NERC Reliability Standard PRC-002-2, Define Regional Disturbance Monitoring and Reporting Requirements. ERCOT proposes to insert the time required to comply with Fault Recording and Sequence of Events Recording Equipment installations, which align with the required NERC implementation timeline. ERCOT inserts paragraphs (1)(a) through (e), (2), and (3) in Section 6.1.3.2, Location Requirements, to address new requirements for existing generation under NERC Reliability Standard PRC-002-2, Define Regional Disturbance Monitoring and Reporting Requirements, R5. This allows for generation identified to align their dynamic disturbance recording required locations with the NERC timeline. ERCOT also restores the 18-month implementation date for phasor measurement recording equipment in paragraph (4)(b) of Section 6.1.3.2. The 18-month implementation date was added on June 1, 2015 after approval of NOGRR142, Phasor Measurement, and just became effective for new units on January 1, 2017.