JWST Science Policy & Science Parallels

Slides:



Advertisements
Similar presentations
JWST Science Timeline: Current Status Janice C. Lee STScI Science Mission Office March 13, 2014.
Advertisements

Hubble Science Briefing The “Monkey’s Tooth?” Hubble’s new infrared view of a star-forming pillar 1 April 3, 2014 Zolt Levay ・ Hubble Heritage STScI.
Mission Engineering and Science Analysis (MESA) Jeff Valenti What is MESA?
Towards Creation of a JWST Astrometric Reference Field: Calibration of HST/ACS Absolute Scale and Rotation Roeland van der Marel Jay Anderson, Colin Cox,
1 HST Cycle 12 TAC Results Bob Williams TIPS – 17 April 2003.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Introducing JWST’s NIRISS: The Near InfraRed Imager & Slitless Spectrograph TIPS/JIM 2011 September 15 Alex Fullerton STScI / HIA.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
Fine Guidance Sensor 2010 HST Calibration Work Shop Ed Nelan Barbara McArthur STScI.
Hubble Science Briefing Delivering JWST Science, from Exoplanets to First Light: The Near-InfraRed Imager and Slitless Spectrograph (NIRISS) March 6, 2014.
An Enabling Policy Framework for Public Libraries Group 1 Process towards Developing National Policy Facilitator: Richard Atuti & Carol Priestley Rapporteur:
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
(Almost) Everything You Need to Know About Preparing and Submitting Proposals to External AO’s Marc Postman On behalf of CMO, SMO, RMO and BRC April 28,
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
Innovations in the Multimission Archive at STScI (MAST) M. Corbin, M. Donahue, C. Imhoff, T. Kimball, K. Levay, P. Padovani, M. Postman, M. Smith, R. Thompson.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
APT Standard Target Name Agenda: History of APT Standard Target Name PR DMS Level 3 Data File Names SANTA: MAST Name Resolver Pros/Cons of adding Standard.
Cycle 1 Planning Process B-G Andersson (SOFIA Science Operations Manager) & Ravi Sankrit (User Support Scientist) SSSC, May 11, 2011 Mountain View.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
1 PPS Demonstrations August 28, Agenda PPS Architecture Overview (15 minutes) – Tony Krueger ETC Overview and Demo (30 minutes) – Donald Mclean.
JWST Calibration mini-summit STScI June 13, 2008.
Coding the JWST Calibration Pipeline(s) 2010 Calibration Workshop Robert Jedrzejewski/STScI.
Common Archive Observation Model (CAOM) What is it and why does JWST care?
Welcome to the First CLASH Science Team Meeting September 20 – 21, 2010 Granada, Spain.
The Future of the Hubble Space Telescope Steven Beckwith April 25, 2005 Space Telescope Science Institute.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Hubble Space Telescope Brad Whitmore 25 April 2012.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
The INS NIRCam Team.
APT Overview for Transiting Exoplanet Proposals Chris Moriarty – APT Developer.
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
Introduction NICMOS (Near-Infrared Camera and Multi-Object Spectroscopy) was installed on the Hubble Space Telescope during SM2 in 1997 and has been the.
Faculty meeting - 13 Dec 2006 The Hubble Legacy Archive Harald Kuntschner & ST-ECF staff 13 December 2006.
Heliophysics MO&DA Program - November 13, Page 1 Notes from the Heliophysics MO&DA Program STEREO SWG Meeting Chuck Holmes “Director, Heliophysics.
Single Object Spectroscopy and Time Series Observations with NIRSpec
Science Mission Office, STScI
Preparing for the Future: NASA's Planning for the Decadal Survey
HST and JWST Pipelines and Reference Files
Introduction to the Astronomer’s Proposal Tool (APT)
Alex Fullerton STScI / NIRISS Team Lead
NIRSpec Time Series Observations
Observing Strategies and Constraints
Imaging with the James Webb Space Telescope
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
The Hubble Legacy Archive (HLA) Slitless Spectroscopy Project
HST Spectroscopic Legacy Working Group Areas for Recommended Work in FY2014 and Beyond Meeting 26 Jun 2013.
JWST Pipeline Overview
Stephanie LaMassa (STScI) – deputy
Single Object & Time Series Spectroscopy with JWST NIRCam
Status of the JWST mission, and planning (AGN) observations
JWST NIRCam Time Series Observations
Bill Blair JWST Project Scientist for User Support STScI/JHU
Massimo Stiavelli, September 15th, 2011
The JWST Director’s Discretionary
Observing Modes Available for Cycle 1
JWST Overheads Jeff Valenti S&OC Mission Scientist
ESAC 2017 JWST Workshop JWST User Documentation Hands on experience
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
ESO Phase 1 & 2 Procedures Gaitee Hussain
Science Policies and Timeline
Detector Parameters Marco Sirianni - ESA.
How to implement coordinated parallels
ESAC 2017 JWST Workshop General Target Visibility Tool
MIRI Observing Templates
Gustaaf van Moorsel September 9, 2003
Presentation transcript:

JWST Science Policy & Science Parallels Neill Reid (SMO) ESAC 29 September 2016 Space Telescope Science Institute JSTAC: April 29, 2014

Context JWST was conceived as a “prime-only” observatory Instrument operations in parallel mode were envisaged as only available for internal calibration measurements Operating two or more instruments in parallel mode Supports the goal of maximising JWST’s scientific productivity Implementation supported by SWG and JSTAC JWSTMO submitted a proposal to the JWST Project requesting additional resources to implement science parallels The proposal was accepted by the Project Additional resources have been provided to support implementation Science policy decisions have been taken to specify the availability of parallel observations in Cycle 1 ESAC: September 29 2016

definitions ESAC: September 29 2016

Coordinated parallels In programs with coordinated parallels, all observations contribute to a single, coherent science program Fully achieving the science goals outlined in the proposal requires observations with all instruments specified in the proposal The observing parameters of the coordinated parallels are taken into account in developing the observing schedule Observations are submitted as a single proposal APT templates will be developed for JWST Coordinated parallels are common with HST In particular, imaging programs routinely combine ACS/WFC3 for multi-wavelength imaging ESAC: September 29 2016

Examples: Frontier Fields & other deep field surveys Blank field WFC3+ACS Orion imaging survey (PI: Robberto, Cycle 13) Cluster ACS+WFC3 ESAC: September 29 2016

Pure parallels Pure parallel observations constitute stand-alone science programs that are crafted to take advantage of scheduling opportunities offered by unrelated, independent prime science programs Pure parallels increases the science return by adding new science Observing parameters are set based on the scheduling requirements of the prime program; pure parallels do not influence those requirements Pure parallel programs have been most effective scientifically as coherent programs run by associated science teams Observations are submitted as a separate, stand-alone program Standard APT templates for JWST Parallel programs are matched against suitable prime programs once those programs are fully defined and LRP-ready ESAC: September 29 2016

Pure parallels on HST Initially, pure parallel programs were matched against prime programs using a automated scheduling algorithm – almost exclusively imaging Initially relatively successful, leveraging WFPC2 imaging (eg Medium Deep Survey) Default ACS parallel program introduced in Cycle 11 to fill out schedule Diminishing science return relative to prime with completion of prime imaging programs, eg GOODS Pure parallel programs on hiatus from Cycle 13 Wear and tear coupled with limited science impact Pure parallels reintroduced post-SM4 Explicit effort made to optimise opportunities TAC-selected programs matched manually against prime programs (primarily COS, including COS GTO programs) with the PIs working in conjunction with Institute staff ESAC: September 29 2016

Examples: Medium Deep Survey - WFPC2 The Brightest of Reionising Galaxies – WFC3-IR direct WFC3 Infrared Spectroscopic Parallel Survey – WFC3-IR grism ESAC: September 29 2016

Implementation & Policies ESAC: September 29 2016

APT Coordinated Parallel GUI Coordinated parallel observations will be specified via observing templates in APT Templates optimise the observing scheme (dithers, filter changes, etc) for both instruments

Pure Parallel Observations Pure parallel observations are matched against observations from multiple approved programs (i.e. post-TAC) Pure parallels may not affect the observing scheme of the prime observation SWG: July 18 2016

Implementation Status As of September 29 2016: All two-instrument pure-parallel combinations will be available for Cycle 1 Instrument combinations for coordinated parallels have been prioritised by STScI, working in conjunction with the SWG. Top 5 priorities are: NIRCam Imaging + MIRI Imaging (*) NIRCam Imaging + NIRISS WFSS (*) MIRI Imaging + NIRISS WFSS (*) NIRSpec MOS + NIRCam Imaging (TBD) NIRCam Imaging + NIRISS Imaging (*) Coordinated parallel templates for at least 4 combinations (*) will be available by the start of the APT GTO proposal preparations for Cycle 1. The remaining coordinated parallel templates (incl. 3-instrument coordinated parallels) will be implemented prior to launch and will be available in Cycle 2. ESAC: September 29 2016

Policies All parallel observations are limited to two instrument combinations in Cycle 1 Coordinated parallels will be available to GO and GTO proposers from Cycle 1 Instrument combinations will be limited to those specified in the Calls for Proposals for each cycle GTO and GO (including DD-ERS) proposers will have access to the same options in each cycle The science case for GO coordinated parallels will be assessed by the TAC The science case for GTO coordinated parallels will be assessed by an review panel reporting to NASA HQ and the STScI Director Coordinated parallels will carry the same exclusive access period as the prime observations GO Pure Parallel programs will be available in Cycle 1 All instrument combinations will be available unless specifically excluded in the Cycle 1 GO Call for Proposals Pure parallel observations may not interfere with prime observations Some prime observations (e.g. exoplanet transit, coronagraphy) may not be available for pure parallel programs All pure parallel observations will have zero exclusive access period (ie non-proprietary datasets) ESAC: September 29 2016

Summary Science parallels will be implemented for a limited subset of instrument combinations for both GO and GTO programs in JWST Cycle 1 Coordinated parallel programs will be reviewed and assessed by the TAC (GO programs) or an independent review committee (GTO programs) Pure parallel programs are available as GO programs and the data will have no proprietary period ESAC: September 29 2016