ICE SECTION The coolest place to be! Elias Métral

Slides:



Advertisements
Similar presentations
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Advertisements

Elias Métral, 1st ICE meeting, 14/07/2010 /191 STATUS OF THE LHC INSTABILITIES E. Métral, N. Mounet and B. Salvant E. Métral, N. Mounet and B. Salvant.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
Introduction to availability modelling in ELMAS Arto Niemi.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Main activities and news from the Impedance working group.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
Ion effects in low emittance rings Giovanni Rumolo Thanks to R. Nagaoka, A. Oeftiger In CLIC Workshop 3-8 February, 2014, CERN.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Status of the magnet studies in the ARCS (FLUKA)
AFC 2017 (and 2018) AFC timeline:
Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT
contribution to the round table discussion
Status and Plans for InCA
Transverse Damping Requirements
The European Strategy for Particle Physics
ABP Computing Working Group
Alternative/complementary Possibilities
Space charge studies at the SPS
20th Hadron Synchrotron Incoherent effects section meeting
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Emittance growth AT PS injection
Status of the beta-beam study
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Joint Meeting SPS Upgrade Study Group and SPS Task Force
LIU, ABP-CWG, PBC, miscellaneous
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Upgrade Strategy for the Experimental Vacuum Systems
How to run ions in the future?
Multiturn extraction for PS2
Impedance working group update
UPDATE ON DYNAMIC APERTURE SIMULATIONS
IS IT POSSIBLE TO INCREASE THE p INTENSITY FOR CNGS BY A FACTOR 2 OR 3
Progress towards Pulsed Multi-MW CERN Proton Drivers
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
CLIC damping rings working plan towards the CDR
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Negative Momentum Compaction lattice options for PS2
I-LHC NOMINAL ions beam in 2007
A High Intensity Neutrino Oscillation Facility in Europe
MC 5 Ideally, we should have talk on general beam dynamics topics and/or on EM field. Most of the identified tentative speakers within the highest-ranked.
Joint session – Beta-beams
First meeting of the LIS section: Welcome to the new members!!
ABP/RTL Main RTL Activities for 2007/8:-
ThomX – Commissioning Meeting – 25/01/2018
LHC Machine Advisory Committee, CERN 12th June 2008
Presentation transcript:

ICE SECTION The coolest place to be! Elias Métral - Does not mean In Case of Emergency - Does not stand for Immigration and Customs Enforcement (thanks Rama!) - Stands for Impedance And Collective Effects Old and New structure => As of July 1st, 2010 (presented by OliverB at the last group meeting on June 16th) Mandate of the ICE section Mandate of the LIS and LCU sections Organization Elias Métral, 1st ICE meeting, 14/07/2010 /8

OLD STRUCTURE Elias Métral, 1st ICE meeting, 14/07/2010 /8

NEW STRUCTURE => NEW ICE SECTION (July 1st, 2010) Selection board next Friday 16/07/2010 (BE-ABP-LIS-2010-48-LD) Elias Métral, 1st ICE meeting, 14/07/2010 /8

MANDATE OF THE ICE SECTION (1/2) - The ICE section carries out theoretical, simulation and experimental research in the dynamics of high-intensity and/or high-brightness particle beams - It analyses the collective effects limiting the performance of the PSB, PS, SPS and LHC accelerators, including beam coupling impedance, space charge, beam-beam and electron cloud - The team coordinates the machine studies of the PS and SPS complex, and it also contributes to the study effort for the upgrade of the LHC injectors and to R&D activities for CLIC, Neutrino factory and Beta Beams Elias Métral, 1st ICE meeting, 14/07/2010 /8

MANDATE OF THE ICE SECTION (2/2) SOME MORE PRECISIONS: 1) Beam-Beam Nominal and Upgrade is in ICE
 - Responsibility for Nominal => WH - Responsibility for Upgrade => FS 2) MAD-X responsibility => LCU - FS is still responsible for the moment (but plan that someone in LCU takes over this responsibility) Elias Métral, 1st ICE meeting, 14/07/2010 /8

MANDATE OF THE LIS SECTION - Is responsible for the single particle beam dynamics studies on LEIR, PSB, PS and SPS and studies of the optics of their transfer lines as part of the performance optimization of the PS-SPS Complex. That implies participation to machine experiments and studies, follow-up of the performance and improvements for the LHC beams and the fixed-target physics beams with particular emphasis on loss and radiation minimization, new beams preparation and contribution to LEIR, PSB, PS and SPS operation supervision - Is in charge of the design, coordination and implementation of a new multi-turn extraction scheme for the PS and studies the application of similar schemes for future upgrades of the LHC Injectors in collaboration with TE/ABT - Studies the beam dynamics issues related to the operation of the PSB with LINAC4 and in particular to the charge-exchange injection of high intensity high brightness H- beams (e.g. space charge effects) in collaboration with the ICE section - Contributes to the study effort for the upgrade of the LHC injectors (e.g. PS2, SPS Upgrade) and to R&D activities (e.g. Neutrino factory) in the frame of the FP7 EU Programme - Is responsible for the coordination of the Ions-for-LHC Project Elias Métral, 1st ICE meeting, 14/07/2010 /8

MANDATE OF THE LCU SECTION The LHC Commissioning and Upgrade section: - Is responsible for the optics design and development for the nominal LHC machine - Studies the mechanical aperture and magnet field imperfections of the machine as installed and impact on beam dynamics - Contributes to the study of commissioning and machine operation scenarios, measurement procedures, including specifications of LHC beam parameters - Provides support for the operation of the LHC during its initial commissioning phase. Participates in machine studies aimed at improving the machine performance - Hosts the Project coordination for the LHC collimation system - Contributes to R&D efforts related to the Phase II LHC collimation system - Contributes to the study of LHC beam limitations and ways to overcome them to reach and exceed LHC nominal performance (LHC upgrade studies and LHeC) - Is responsible for the development and maintenance of software tools for accelerator design and operation - Contributes to and co-ordinates the EUCARD-related R&D activities (LHC upgrade studies) Elias Métral, 1st ICE meeting, 14/07/2010 /8

ORGANIZATION - Proposition to have a regular meeting every week (except when I am absent!) => Same place, same time (if possible => tbc) - 1st part (closed, ~ 20 min) on general information from my side (report from SLMeetings) + hot topics etc. => Presence required - 2nd part (open to any people outside the section, ~ 1h20) where we have “some” presentations => Informal, to discuss all technical details of collective effects (as done in the Impedance Meetings), possibility for the students to give talks, have comments etc. and training for everyone => Presence not necessary - Should not last more than 1h40 in total! - We stop the Impedance Meetings and the discussions will take place here - Round table every 3 or 4 weeks - What is the best day? Proposition to have it on WE morning or FR morning - We will start the next meetings by some status reports on the different activities of the section and future plans => LHC instabilities, BB etc. Elias Métral, 1st ICE meeting, 14/07/2010 /8