Locational Net Benefit Analysis Working Group

Slides:



Advertisements
Similar presentations
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Advertisements

Development of an Illinois Energy Efficiency Policy Manual A Proposed Process and Approval Plan Presented by: Karen Lusson Illinois Attorney General’s.
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
EIM DISALLOWANCE CASE: PROGRESS IN THE SOUTHWEST Aka: Continued Assault.
California Energy Commission AB 1257 Report on the Role of Natural Gas in California Staff Workshop on California’s Natural Gas Infrastructure, Storage,
United States Department of Agriculture Food Safety and Inspection Service 1 National Advisory Committee on Meat and Poultry Inspection August 8-9, 2007.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
AEE So Cal September 24, 2015 Integrating Renewables and The Distribution Grid of the Future 1.
California Energy Commission Draft 2015 Integrated Energy Policy Report October 20, 2015 Presented by Heather Raitt Assistant Executive Director for Policy.
By Erik Takayesu, PE Director, Electric System Planning Southern California Edison More Than Smart Webinar August 4, 2015 Distribution Resources Plan.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Integration Capacity Analysis & Locational Net Benefits Analysis Working Groups Kick-off Meeting May 12, 2016.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
MTS Working Group San Francisco F2F Agenda Mar. 23, 2015.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
1 Distribution Resources Plan [R ] Locational Net Benefit Analysis (LNBA) and Demonstration Project A (Demo B) Workshop California Public Utilities.
Locational Net Benefit Analysis Working Group June 9, pm – 3:30 pm CPUC Golden Gate Room, San Francisco drpwg.org.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
Overview of SB 350 California Public Utilities Commission Melicia Charles, Energy Division February 23,
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
1 CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup: Meeting 2 – Distribution Planning Group (DPRG) Structure and Time Requirements.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
Locational Net Benefit Analysis Working Group
Multifamily Working Group Announcement Webinar
Locational Net Benefit Analysis Working Group
CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup:
LNBA Subgroup: Avoided Transmission Value
MTS Working Group January 28, 2016
Integrated Capacity Analysis Working Group
SEIA Perspective on Smart Inverter Functions
Pacific Coast Inter-Staff Collaboration Summit
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
Integrated Capacity Analysis Working Group
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Locational Net Benefit Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Inputs Outputs Tools and Techniques.
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
August LNBA Agenda Time Topic 1:00 – 1:15
LNBA Subgroup: Avoided Transmission Value
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Integrated Distribution Planning Process
Introduction to Growth Scenario Working Group
Inter-Staff Collaboration Summit
Integrated Capacity Analysis Working Group
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 21, 2018
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
SIWG CALL ISSUES 27 AND 28 APRIL 4,
SIWG CALL ISSUES 27 AND 28 APRIL 4,
ICA Methodology Clarifications ICA Working Group 5/18/2016
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
DER Growth Scenarios and Load Forecasts Working Group
California Transportation Electrification Activities
Energy Storage Roadmap & Flexibility Roadmap Information Session
Commission Direction on Locational Disaggregation
Presentation transcript:

Locational Net Benefit Analysis Working Group December 13, 2016 Webinar drpwg.org

ICA and LNBA Working Group Background ICA and LNBA WG Purpose - Pursuant to the May 2, 2016, Assigned Commissioner’s Ruling (ACR) in DRP proceeding (R.14-08-013), the Joint Utilities are required to convene the ICA and LNBA WG to: Refine ICA and LNBA Methodologies and Requirements Authorize Demonstration Project A and Project B CPUC Energy Division role Oversight to ensure balance and achievement of State objective (ensure adequate stakeholder representation in consensus statements, keeping WG activities on track with Commission expectations/needs, demonstration project results review, quality control on deliverables) Coordination with both related CPUC activities and activities in other agencies (IDER CSF WG, CEC and CAISO interagency matters, interconnection/Rule 21/SIWG, other proceedings that may impact or be impacted by locational value calculation such as AB 350/IRP and LTPP/TPP/RPS) Steward WG agreements into CPUC decisions when necessary More Than Smart role Engaged by Joint Utilities to facilitate both the ICA & LBNA working groups. This leverages the previous work of MTS facilitating stakeholder discussions on ICA and LBNA topics.

Update on Timelines Date Short Term Long Term Dec. 16 IOU Final Demo B report due* Jan. 6 In-person meeting Determine schedule for discussions up to Q2 2017 Depending on WG availability, begin LT refinement discussions Jan. 11 First draft circulated Jan. 17 First round of edits due Jan. 18-19 Second draft circulated Jan. 20 Webinar Jan. 27 Second and final round of edits due Jan. 31 Report submitted

Review of IOU Demo Project Report and Developing WG ST Final Report Purpose: The final Demo reports are due Dec. 31, 2016 (and may be available as early as Dec. 16). The next WG meetings are scheduled for Jan. 6 and Jan. 20. Given the limited time for WG members to review IOU final Demo reports, it is suggested that the LNBA WG pre-assign volunteer lead(s) for report sections. The volunteer(s) would be responsible as the lead author of the final WG report for WG recommendations on that particular section, receive input and comments from other WG members, and lead discussions on that topic for the two WG meetings in January. MTS will continue to coordinate and facilitate WG input into the final report.

Review of IOU Demo Project Report and Developing WG ST Final Report 1. Demo B Background and Objectives 7. Project Deferral Benefit Calculation 1.1 Definition of LNBA Components for Demo B LNBA Tool Deferral Benefit Calculation 1.2 Definition of Net in Demo B Inputs and Outputs 1.3 LNBA Tool Overview Transmission Benefits 1.4 Heat Map Overview Other LNBA Components Calculation 1.5 CPUC Requirements and Deliverables Sources 2. Electric Services User Inputs in ‘DER Dashboard’ Tab of LNBA Tool 2.1 Services that DERs Can Provide in Demo B LNBA Tool Avoided Energy 2.2 Services that DERs May be able to Provide in the Future Conservation Voltage Reduction LNBA Tool Avoided Generation Capacity 2.3 Services that DERs Cannot Provide LNBA Tool Avoided GHG, RPS, and Ancillary Services 3. Selected Planning Areas 3.1 Planning Inputs: Load LNBA Renewable Integration Cost 3.2 Planning Inputs: DER Forecasts Societal and Public Safety 4. Description of Deferrable Upgrade Projects by Planning Area Lessons Learned, Refinements, and Uncertainties Appendix 1: Heat Map 5. Description of Operations and Maintenance Work by Planning Area Appendix 2: E3 LNBA Tool Documentation Appendix 3: ACR to Final Documents Table 6. Description of Reliability Work by Planning Area