TDR guideline discussion on Cavity Integration

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Cavity Technical Specification IWLC2010 WG3 industrialization session H. Hayano Geneva,Oct.2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Cost comparison of tuners H. Hayano, KEK AWLC14
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
ILC-BCD: Cavity Package International Linear Collider - Baseline Configuration Document: Cavity Package DESY -MPY-
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Cavity Tuner Spec. profile for Plug Compatibility H. Hayano April 22, 2008 ILC-SCRF
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
Plug compatibility Document ILC10 cavity integration session H. Hayano.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Cavity and Cryomodule Plug-Compatibility To Reach Consensus Akira Yamamoto ILC-08, Chicago, Nov. 17, 2008 Nov. 17, 2008ILC-08 SCRF1.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Lutz Lilje XFEL Coupler Some Comments. XFEL Coupler WEBEX Lutz Lilje DESY Status TTF III Coupler  has shown full ILC performance  has not.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
TDR parameter discussion on Cavity, Cavity Integration R. Geng, H. Hayano
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Rev 0.3: Aug 7, Notes from TRISTAN Experiences N.Toge (KEK) for GDE RDB S2 Rev.0.3 Aug. 7, 2006.
S1G Experiment Schedule Plan
Meeting for S1-Global module design Cryomodule and Cryogenics
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Yamamoto WG3: ML-SCRF Parallel Session,
TESLA Cryomodule Design Ratinales
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Nick Walker (DESY) EU GDE Meeting Oxford
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
Magnetic shielding and thermal shielding
Presentation transcript:

TDR guideline discussion on Cavity Integration GDE-SCRF meeting@Beijing, 12082011 TDR guideline discussion on Cavity Integration H. Hayano

Tuner (2) Coupler (3) Magnetic shield (4) Beam pipe/coupler flange (5) Plug-compatibility boundary definition

S1-Global FNAL cavity DESY cavity KEK-type1 cavity KEK-type2 cavity

(1) Tuner Baseline of tuner is not yet decided. Now, we have 4 kind of tuner test results from S1-Global test. LFD compensation works for 4 kind of tuner. In case of adaptive FB, more wide-band piezo driver will be necessary for KEK stiff tuners. Found failure: wrong drive gear connection, jack gear stuck by bend of slide-jack slope, piezo break-down, (S1-G) drive screw stuck, motor-wire short, … (FNAL CM-1, CM-2) (1) Stiff tuner / non-stiff tuner ? (2) Motor outside/ Motor inside? Motor/piezo accessible or not? (3) Which is robust mechanical design? (4) LV Piezo/HV Piezo? Casing? Stroke? (5) Which is cost-effective design?

(2) Coupler Baseline of coupler is TTF-III. Now, we have two types of coupler results from S1-Global test. Power transmission works for 2 kind of coupler by reasonable short RF process time. Heat load performance were different. Found failure: Big static/dynamic heat load, break-down, copper plating with Ni-strike, thermal anchor position, assembly bolts stuck, (S1-G) center conductor miss-alignment, copper/metal flake contamination into cavity, copper plating non-uniformity, … (FNAL, DESY) (1) Cylindrical window/ disk window? (2) Copper coating method (3) Contamination to cavity

Now, we have two types of magnetic shield results from S1-Global test. There was no clear evidence of performance difference. Shield Outside : require many piece of shield to cover tuner complex, Shield Inside : make string assembly simple, (Q) same shielding performance after tank-weld heat experience? Outer-diameter =229 KEK cavity (1) Outside shielding/ shield inside? (2) HOM cup interference for shield insertion? (3) End-cell shield/ cover-all end-group connection?

Now, we have two kinds of flange & seal in S1-Global test. (4) Beam-pipe/coupler flange, seal Now, we have two kinds of flange & seal in S1-Global test. There was no clear evidence of performance difference. ( However, they were not interconnected. Hexagonal system in module-C and Helicoflex system in module-A were independent.) (1) Al Hexagonal seal / Sn coated Helicoflex? DESY/FNAL cavity KEK cavity (2) Flange diameter? (3) Beam pipe/coupler diameter? (4) Bolts and Nuts? SUS-bolt & CuBe-Nut? 80 78 140 Coupler port diameter 40mm(DESY,FNAL) / 60mm (KEK) 124

LHe vessel Ti vessel / SUS vessel. (1) Where is transition? (2) Welding / brazing (3) Which is cost effective?

(5) Plug Compatibility boundary specification

(1) beam pipe port flange ( beam pipe diameter ) Cavity boundary BCD: TESLA-short cavity cavity boundary (1) beam pipe port flange ( beam pipe diameter ) (2) coupler port flange ( port pipe diameter ) (3) 4 support tabs (4) He pipes

Input coupler boundary BCD: TTF-III coupler input coupler boundary cavity port flange ( port diameter ) (2) cold/warm part interface flange (3) cryostat vessel flange (4) waveguide flange

TDR writing basement (1) Baseline: TESLA cavity with ILC-short length + TTF-III coupler *Baseline of Tuner : need to down-select, after performance & cost comparison (2) Performance: need to describe on RF, thermal, Mechanical, Electrical -performance (3) Procedure: need to describe on Fabrication, Treatment, Inspection, Test -Procedure (4) Plug-compatibility: describe clear boundary definition (5) High-pressure-vessel Regulation: need to describe how to clear it

End of slide