CURRENT STATE OF ACQUISITION, TEST & EVALUATION ENTERPRISE NOVEMBER 2012 PRESENTATION TO INCOSE ENCHANTMENT CHAPTER Charles Pete Adolph.
Advertisements

C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Recent Trends in DoD Systems and Software Engineering Processes Bruce Amato Acting Deputy Director, Software Engineering and Systems Assurance Office of.
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Slide 3.1 © The McGraw-Hill Companies, 2002 SOFTWARE LIFE-CYCLE MODELS.
Business, Cost Estimating & Financial Management Considerations
Presidential Direction
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
Technology Readiness Assessment (TRA)
Life Cycle Logistics.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Identify the Risk of Not Doing BA
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
DAG CH 3 Figure 11: Weapon System Development Life Cycle
TechStambha PMP Certification Training
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
AT&L Hot Topics in Acquisition
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Information Required for Milestone and Decision Reviews
DAG CH 3 Figure 13: Weapon System Development Life Cycle
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
DAG CH 3 Figure 19: Weapon System Development Life Cycle
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
DAG CH 3 Figure 15: Weapon System Development Life Cycle
8 Tech Processes Drive Acquisition
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Competitive Prototyping – the New Reality Sharon Vannucci Assistant Deputy Director Systems Engineering Policy and Guidance Systems and Software Engineering Office of the Secretary of Defense Program Managers’ Skills Course, PMT 403 June 18, 2009

Technical Acquisition Excellence for the Warfighter Bottom-line Upfront DoD 5000.02 changes emphasize early stages of pre-systems acquisition - prior to Milestone B (MS B) Reduce risk before making business commitment Improve likelihood of being able to meet commitments Prototyping means new challenges for the program during this early period Pre-Milestone B prototyping is required by USD(AT&L) policy . . . and now it’s the law! Technical Acquisition Excellence for the Warfighter

First – Competitive Prototyping Policy “Evolutionary acquisition requires . . . Technology development preceding initiation of an increment shall continue until the required level of maturity is achieved, prototypes of the system or key system elements are produced, and a preliminary design is completed . . .” “The TDS and associated funding shall provide for two or more competing teams producing prototypes of the system and/or key system elements prior to, or through, Milestone B.” Technical Acquisition Excellence for the Warfighter

Second – DoDI 5000.02 Prototyping and Competition MS A MS B MS C Materiel Solution Analysis Technology Development Engineering & Manufacturing Development Production & Deployment Operations & Support MDD P-PDR-A P-CDR-A FRP DR “The Technology Development Strategy and associated funding shall provide for two or more competing teams producing prototypes of the system and/or key system elements prior to, or through, Milestone B. Prototype systems or appropriate component-level prototyping shall be employed to reduce technical risk, validate designs and cost estimates, evaluate manufacturing processes, and refine requirements . . .” Technical Acquisition Excellence for the Warfighter 4

Now – Competitive Prototyping Legislation PL 111-23 (“Acquisition Reform”), Section 203: Requires the Secretary of Defense to modify acquisition policy to require each MDAP’s acquisition strategy provides for competitive prototypes prior to a MS B decision Allows prototyping to occur at the system or subsystem level Includes provision for Milestone Decision Authority (MDA) waiver only on the basis that the cost of producing the competitive prototypes exceeds the expected life-cycle benefits (in constant dollars) of producing the prototypes or for critical national security objectives Programs receiving a waiver must still produce a prototype before MS B be reported in writing by the MDA to the congressional defense committees and the Comptroller General of the US Weapon Systems Acquisition Reform Act of 2009 (May 22, 2009) Technical Acquisition Excellence for the Warfighter

Acquisition Reform Thumbnail New legislation, Public Law 111-23, Weapon Systems Acquisition Reform act of 2009 (May 22, 2009) Strong bipartisan Congressional support Heavy focus on “starting programs right” Renewing focus on systems engineering early in a program’s life Requiring completion of competitive prototypes for all Major Defense Acquisition Programs (MDAPs) Requiring completion and MDA assessment of a system-level Preliminary Design Review before MS B Strengthening developmental test and evaluation capability Technical Acquisition Excellence for the Warfighter

Technical Acquisition Excellence for the Warfighter Reform Objectives “The key to successful acquisition programs is getting things right from the start with sounds systems engineering, cost-estimating, and developmental testing early in the program cycle. The bill that we are introducing today will require the Department of Defense to take the steps needed to put major defense acquisition programs on a sound footing from the outset. If these changes are successfully implemented, they should help our acquisition programs avoid future cost overruns, schedule delays, and performance problems.” –Senator Carl Levin (D-MI), Chairman, Senate Armed Services Committee “The Weapon System Acquisition Reform Act of 2009 is an important step in efforts to reform the defense acquisition progress. This legislation is needed to focus acquisition and procurement on emphasizing systems engineering; more effective upfront planning and management of technology risk; and growing the acquisition workforce to meet program objectives.” –Senator John McCain (R-AZ), Ranking Member, Senate Armed Services Committee Technical Acquisition Excellence for the Warfighter

Summary of Legislation The Weapon Systems Acquisition Reform Act of 2009 contains provisions that will: Address problems with unreasonable performance requirements by requiring DoD to reestablish systems engineering organizations and developmental testing capabilities; make trade-offs between cost, schedule and performance early in the program cycle; and conduct preliminary design reviews before giving approval to new acquisition programs; Address problems with unreasonable cost and schedule estimates by establishing a new, independent director of cost assessment to ensure that unbiased data is available for senior DoD managers; Address problems with the use of immature technologies by requiring the Director of Defense Research and Engineering to periodically review and assess the maturity of critical technologies and by directing the Department to make greater use of prototypes, including competitive prototypes, to prove that new technologies work before trying to produce them; and Address problems with costly changes in the middle of a program by tightening the so-called “Nunn-McCurdy” requirements for underperforming programs. Excerpts from Bill Signing Ceremony Press Release – May 22, 2009 Technical Acquisition Excellence for the Warfighter 8 8

Impact of Acquisition Reform Legislation on Early Acquisition Policy Establishes Director, Systems Engineering (D, SE) and Director, Developmental Test and Evaluation (D, DT&E) as principal advisors to the Secretary of Defense and the USD(AT&L) on systems engineering and development planning and on developmental T&E, respectively Mandates documented assessment of technological maturity and integration risk of critical technologies for MDAPs during the Technology Development (TD) phase Establishes D, DT&E and D, SE joint tracking and Congressional reporting on MDAP achievement of measurable performance criteria Mandates competitive prototyping and MDA completion of a formal Post-Preliminary Design Review Assessment for all MDAPs before MS B; additional MDA certification to both at MS B Strengthens technical analysis of cost and schedule breaches during the Technology Development (pre-MS B) and the Engineering and Manufacturing Development (post-MS B) phases Technical Acquisition Excellence for the Warfighter

Acquisition Lifecycle Comparisons Defense Acquisition Management System, May 12, 2003 A B C (Program Initiation) System Development and Demonstration Concept Refinement Technology Development Production and Deployment Operations and Support Design Readiness Review Full-Rate Production Decision Review Concept Decision Defense Acquisition Management System, December 8, 2008 A B C (Program Initiation) Materiel Solution Analysis Engineering and Manufacturing Development Production and Deployment Technology Development Operations and Support FRP Decision Review PDR PDR CDR Materiel Development Decision PDR after B w/ Post-PDR Assessment Post-CDR Assessment Or Defense Acquisition Management System, May 22, 2009 A Technology Development B C (Program Initiation) Technological Maturity and Integration Risk Assessment Materiel Solution Analysis Engineering and Manufacturing Development Production and Deployment Operations and Support FRP Decision Review Competitive Prototyping PDR CDR Tech Materiel Development Decision Post-PDR Assessment Post-CDR Assessment 10

What this means for Program Managers Systems engineering is now recognized in law as inherently necessary in requirements definition, development planning, and early acquisition Need for and focus of all engineering in the “pre-acquisition” phases (Materiel Decision Analysis and Technology Development) is dramatically altered: Earlier engineering involvement (well before Milestone A) More government expertise to plan for and oversee requirements definition, technology maturation, and competitive prototyping leading to fully expressed system design (the allocated baseline) More informed, “knowledge-based” decision making at MS B Technical Acquisition Excellence for the Warfighter

DoD 5000.02 and McCain-Levin Change the Early Acquisition Landscape PDR CDR Materiel Development Decision (MDD) Renewed emphasis on manufacturing across the lifecycle PDR, PDR Report to the MDA, and Post-PDR-Assessment System-level CDR with an initial product baseline and a Post-CDR Report to the MDA Competitive Prototypes Post-CDR Assessment by the MDA between EMD sub- phases What are the implications of these changes for programs? How can systems engineering enable the program during this early phase? Technical Acquisition Excellence for the Warfighter

Planning for Milestone A and Technology Development Phase Documents / activities / data requiring technical input from the Systems Engineer BEFORE Milestone A: Analysis of Alternatives Technology Development Strategy Critical Program Information Technology maturation plans Competitive Prototyping plans Net-Centric Data Strategy Market Research Data Management Strategy Component Cost Estimate Systems Engineering Plan Test and Evaluation Strategy The Program Manager’s Challenge: Where to find the data!? Technical Acquisition Excellence for the Warfighter

In Conclusion . . . MDD MS MS A B Business Decisions Engineering Agreement to pursue a materiel solution Business Decisions Selection of a preferred solution Preferred System Analysis Program Initiation Uncertainty Preferred System Concept Engineering Support Technology Maturation and Prototyping P-PDR-A System Level Specs PDR PDR AoA Preliminary Design CDR CDR Final slide- So why am I here welcoming you? We have recognized the important of early SE to provide the technical basis for our acquisitions and PDR has traditionally been a technical review and within the SE lane. However, SE is only effective when it supports the work in other areas and is informed by those areas With the changes PDR has taken a new role and it is critical that SE work in tandem with the other areas for acquisition sucess Completed Design Materiel Solution Analysis Technology Development “Knowledge-based” Decision Making . . . making acquisition decisions when you have solid evidence and acceptable risk Technical Acquisition Excellence for the Warfighter