Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,

Slides:



Advertisements
Similar presentations
Cryogenic discussion and update 30 October 2014Neutrino platform.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
The integration of 420 m detectors into the LHC
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
TE-CRG Activities D. Delikaris, TE-CRG.
Cryostat Design Review Update Steve Kettell DUNE Collaboration Meeting – Technical Board January 14, 2016.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Status of the PANDA Solenoid Magnet Production in BINP
EHN1 Cryogenics Integration
Overview of the Long-Baseline Neutrino Facility Cryogenic System
ATLAS ITk Baby-DEMO update
Magnet cryogenic system update.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Schedule CM SPS G.Vandoni.
Roadmap for triplet cryostats
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Neutrino Platform Overall Protodune Risk Mitigation Plan O
BA6 – crab cavity activities in EYETS
Proximity Cryogenics P&IDs meeting
Collaboration meeting 26 to 28 June 2017
M. Chalifour - TE/CRG-CI
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Teleconference ACS – FREIA 10th May 2017
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
Teleconference ACS – FREIA 31st October 2017
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Status of the cryogenic system for B180
Test box for ProtoDUNE SP – Integration Test
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Schematic diagram of the cryogenic system
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
J. Fleiter, S. C. Hopkins, A. Ballarino
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz, David Montanari 01/09/2016 J.Creus Prats - CERN

Proximity cryogenics contract NP-02 Integration NP-04 Integration Contents Proximity cryogenics contract NP-02 Integration NP-04 Integration Schedule 01/09/2016 J.Creus Prats - CERN

Proximity cryogenics contract Invitation to tender is out since may 18th Bidders conference held on June 8th Eight firms invited to the conference Visit to EHN1 Bid opened on July 8th Offers received under analysis Finance committee on September 16th Contract Award 01/09/2016 J.Creus Prats - CERN

NP-02 Cryo piping NITROGEN ARGON •Cryostat and Proximity Cryogenics connected with electrical breaks •Proximity Cryogenics and External Cryogenics Interconnection •Liquid discharge and collection pipes are placed to walk around the cryostat 01/09/2016 J.Creus Prats - CERN

NP-02 Cable Trays •Electrical cabinet is raised to allow lower cabling access •Cable trays are placed on the edge of proximity cryogenics platform •Cable trays use the gallery to access the electrical cabinet from the bottom •Cryostat cable tray for gas analyzers and pressure sensors 01/09/2016 J.Creus Prats - CERN

NP-02 Warm Piping NITROGEN ARGON •Warm interconnect cryostat with gas services •Argon and Nitrogen cryogenics vent discharge in the external cryogenics area •Vent piping has large diameter to minimize pressure drop after safety valve •Vent piping is designed in order to avoid condensate accumulation (siphon) 01/09/2016 J.Creus Prats - CERN

NP-04 Cryo piping •Cryostat and Proximity Cryogenics connected with electrical breaks •Proximity Cryogenics and External Cryogenics Interconnection •Liquid discharge and collection pipes are placed to walk around the cryostat 01/09/2016 J.Creus Prats - CERN

NP-04 Cable Trays • Racks accessed from the bottom • Cable trays in main trench • Intermediate connection to valve boxes TRENCH 01/09/2016 J.Creus Prats - CERN

NP-04 Warm Piping •Warm interconnect cryostat with gas services •Argon and Nitrogen cryogenics vent discharge in the EHN1 Jura side •Vent piping has large diameter to minimize pressure drop after safety valve •Vent piping is designed in order to avoid condensate accumulation (siphon) 01/09/2016 J.Creus Prats - CERN

Proximity cryogenics: Schedule Schedule to be updated according to selected supplier execution proposal Precedent activities External cryogenics Proximity cryogenics platforms Proximity cryogenics: Installation of valve boxes Installation of cryogenic transfer lines Acceptance tests performed by 2017 week 50 Parallel activities Warm piping 01/09/2016 J.Creus Prats - CERN

01/09/2016 J.Creus Prats - CERN

Raised Electrical Cabinet Backup Slides Raised Electrical Cabinet 01/09/2016 J.Creus Prats - CERN

Backup Slides NP-04 Vent Sizing 01/09/2016 J.Creus Prats - CERN

NP-02 Building Penetration Backup Slides NP-02 Building Penetration 01/09/2016 J.Creus Prats - CERN