Impact of Hurricane Ike on

Slides:



Advertisements
Similar presentations
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Advertisements

Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Florida Public Service Commission Internal Affairs Hurricane Season Preparation Paul Davis, Director Energy Control Center June 5, 2006.
FPL Hurricane Assessment Operating Committee January 25, 2005.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
How to use this presentation. How Power is Restored After a Severe Storm Presented by YOUR NAME YOUR TITLE.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
1 April 27, 2011 Southeast Tornado Event System Operator Conference September and September 25-27, 2012 Memphis, TN Rocky Williamson, SOS Chair Operations.
CenterPoint Energy Houston Electric 2011 Response to Contamination Conditions John Kellum Director of Transmission Operations August 3, 2011.
Hurricane Recovery Update MTAC November 2, HURRICANE RECOVERY TIME LINE OF EVENTS Hurricane Katrina Makes Landfall in Florida 6:30 P.M. Thursday,
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
August 30, Hurricane Ike Timeline Saturday9/13/08 Hurricane Ike makes landfall Lynchburg Pump Station lost power at 1 a.m. Power was restored by.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
The Impact of Ice Nebraska Public Power District
Kenneth (Kenny) Mercado Division Vice President of Distribution Electric Operations Turning on the Lights.
1 Impact of the 2004 Hurricanes Hurricane Charley Landfall on August 13 th Customers affected Poles replaced Transformers replaced Miles of wire replaced.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Hurricane Rita. 2 ERCOT Preparation ERCOT started alerts to QSEs and TOs on 9/21 Did a site failover of EMMS system Austin Taylor Procured satellite voice.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
March 8, 2007 Robert D. Sloan Executive Vice President & General Counsel Entergy Corporation Hurricane Katrina: The Entergy Experience.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 CenterPoint Energy Response to ‘Hurricane Rita’ CenterPoint Energy’s Response to Hurricane Ike COPS Update October 14, 2008.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
Hurricane Rita October 12, Hurricane Rita’s Aftermath Second worst storm in Entergy history At the peak, 766,000 customers without power in Texas.
1 CenterPoint Energy Response to ‘Hurricane Rita’ CenterPoint Energy Response to Hurricane Rita RMS Update October 12, 2005.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
2009 Hurricane Season Preparations Florida Public Utilities Company May 6, 2009.
2015 HURRICANE SEASON PREPARATIONS March 18, 2015.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Hurricane Season Preparation Briefing Florida Public Service Commission May 1, 2008 Kevin Wailes General Manager – Electric Utility.
FRCC System Restoration 2016 FRCC System Operator Seminar.
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
1 Electric Utility Power Systems Generation of Electricity.
Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
Biggest Power Outages in US History A Presentation of Current Solutions PC.
Resiliency and Reliability
Freeport Area Master Plan Project -
September 18, 2007 Regional Disturbance
Barrilla Junction Area Transmission Improvements Project
Utility Needs and Smart Grid for Major Storm Events
Grid Operations Update
2008 Hurricane Season Preparations
Long Island Resiliency & Clean Water Infrastructure Meeting
Hurricane Rita.
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Warren Lasher Manager, Long-Term Planning and Policy
ECEN 460 Power System Operation and Control
Ice Storm 2013 Technical Briefing
Pacific Power Seismic Preparedness Update
Distributed Energy Resources (DER) Experiences at CenterPoint Energy
Most Probable Landfall
TxMAG presentation
Most Probable Landfall
ColumbiaGrid Puget Sound Area Study Team
Presentation transcript:

Impact of Hurricane Ike on CenterPoint Energy’s Transmission System Paul Rocha Director, Transmission Planning Presented at October 2, 2008 ERCOT TAC Meeting

Hurricane Ike 9/12/2008 7 PM Energized Out Restored 0 Circuits Out

Hurricane Ike 9/12/2008 11 PM Energized Out Restored 14 Circuits Out

Hurricane Ike 9/13/2008 2 AM - Landfall Energized Out Restored 36 Circuits Out

Hurricane Ike 9/13/2008 5 AM Energized Out Restored 67 Circuits Out

Hurricane Ike 9/13/2008 8 AM Energized Out Restored 90 Circuits Out

Hurricane Ike 9/13/2008 3 PM Energized Out Restored 97 Circuits Out

Hurricane Ike 9/13/2008 Restoration – 7% Energized Out Restored 7 Circuits Restored 90 Circuits Out

Hurricane Ike 9/14/2008 Restoration – 41% Energized Out Restored 40 Circuits Restored 58 Circuits Out

Hurricane Ike 9/15/2008 Restoration – 70% Energized Out Restored 70 Circuits Restored 30 Circuits Out

Hurricane Ike 9/16/2008 Restoration – 87% Energized Out Restored 87 Circuits Restored 13 Circuits Out

Hurricane Ike 9/17/2008 Restoration – 94% Energized Out Restored 94 Circuits Restored 6 Circuits Out

Hurricane Ike 9/23/2008 Restoration – 100% Energized Out Restored 100 Circuits Restored 0 Circuits Out

Pole Damage

Pole Replacement

CenterPoint MW Load Restoration

Seawall Substation

Stewart Substation

West Bay Substation

Moody Substation

Galveston Substation

West Galveston Substation

Mobile Substation

Network Changes After reviewing damage assessments and analyzing power flow study results, CenterPoint Energy decided not to restore the 69 kV portion of damaged West Galveston substation and 69 kV Ckt. 13, Lamarque – West Galveston Removal of damaged 69 kV connections to Galveston Island could cause some increased loading on remaining three 138 kV connections to Galveston Island Timing depends on rate of load restoration and growth on Galveston Island CenterPoint Energy believes upgrades of remaining 138 kV facilities would be more practical, cost-effective, and timely than restoration of damaged 69 kV facilities CenterPoint Energy will evaluate upgrades to remaining 138 kV connections to Galveston

Galveston Island Network Changes - Temporary

Galveston Island Network Changes - Permanent

Emergency Entergy Connection Implemented emergency interconnection from CNP’s Crosby substation to Entergy’s Dayton substation 9/15/2008 From Dayton substation, CNP used new transmission line built by Entergy after Hurricane Rita to restore power to water plant on the Trinity River normally served by Entergy Disconnected Entergy emergency connection 9/19/2008

Planned Transmission Outages Deferred all planned outages during restoration process CenterPoint Energy expects to resume planned outages next week

Thank You!!! Mutual Assistance No report would be complete without noting the tremendous mutual assistance support from other utilities across North America Far too many to list here, but we want to say… Thank You!!!

Transmission Network Summary Transmission Network Was Quickly Restored Network restored to necessary functionality within 4 days However, storm surge affected Galveston Island, including CNP substations Grid stability maintained despite tie-line and other outages ERCOT actions to adjust for increased probability of line outages was effective Generators performed well 2007 completion of STP– Hillje– WAP tie-line helped Availability of mobile substations aided restoration effort New Entergy 138 kV line expedited water plant restoration Relay and Control infrastructure performed well Hurricane training and drills were effective in preparing personnel