Www.plk-sa.pl 1 PKP Polish Railway Lines investment plans >> Creating a World Class Rail Network << Warsaw, 16 th November 2011 Dr. Marek Pawlik Dr. Marek.

Slides:



Advertisements
Similar presentations
NEW CENTRE OF LODZ PROGRAMME PRESENTATION Principles of the New Centre of Lodz Programme 2. The objective of the New Centre of Lodz Programme The.
Advertisements

EIMS EXPECTATIONS FROM CROSS-ACCEPTANCE WORK CROSS-ACCEPTANCE SEMINAR 17 NOV PHILIPPE GALLEY-EIM/RFF.
Cellular Networks.
Trade and Investment Promotion Section, Polish Embassy Target Poland EURO 2012 and other opportunities Beata Janota Cork, 13 November 2009.
Intermodality between air and railway passenger transport in Poland: present situation and perspectives Marcin Wolek Ph. D. Department of Transportation.
Copyright © TCH Phone(495) Fax(495) www.tch.ru ATSS Passenger Sales System of Rail Services (PSSRS)
Highlights. Changes of organizational structure from Cutting of number of organizational units from 40 to 23 Creation.
1/ Vliv infrastruktury KD na rozvoj KD Opravdu nechápu na co potřebuje Bratislava a okolí 6 terminálů?
Page 1 6th RESEARCH FRAMEWORK REORIENT Project Implementing Change in the European Railway System by Dr Johanna Ludvigsen Scientific Coordinator.
The EU Rail Freight Corridors in the context of freight transport on the Europe-Asia landbridge Edyta Jaszczuk-Jezierska Member of the Management Board.
Kpmg KPMG Corporate Finance Financing Regional Passenger Rail in Poland: Lessons from the UK Irene Walsh 31 March 2004.
Surface area of triangular prisms and pyramids
6.3: Surface Areas of Pyramids and Cones
Rail Transport. Vocabularies :- Rail transport -- is a means of conveyance of passengers and goods by way of wheeled vehicles running on rail tracks Rail.
Rail Freight Noise Abatement in Europe A consensus building workshop for all relevant stakeholders Conclusions and next steps Luc Aliadière, UIC UIC, Paris.
Promoting Employment and Quality of Work in the Rail Sector Case study: Poland July 2015 EVA Academy Prepared for:
Results 3Q 2008 November Disclaimer The present study has been prepared only for information purposes. It does not constitute an advertisement.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
Rail Cargo Spedition Group. Structure of the company  Rail Cargo Spedition, a.s. → an international forwarding company;  Shareholder of Rail Cargo Spedition,
Through the use of GIS Information Data Systems.
RBGC First Transnational Roundtable Vilnius 24th November 2011 « Core Corridors and the « Rail Baltica » James Pond DG MOVE European Commission.
UIC presentation North South Conference, Catania, 27 April 2013 Jacques COLLIARD, head of UIC security Division.
Compliance – Shared Learning Louise Ward. Overview of Network Rail.
1 Scientific and Organizing Problems Concerning European Grants Related to Shifting Wheelset Andrzej Chudzikiewicz Bezpieczny i Zrównoważony Transport.
The role of competition authorities and sectoral regulators: regional experiences.
10.6 Surface Area of Pyramids, Cones and Spheres SA = B + Pl Slant height (l)- the height of the triangular faces.
Energy Management Systems. How to reduce your energy bills Negotiate a better supply rate Solve peak demand problems Reduce your energy use Power factor.
EURAILSPEED MILANO 2005.
India has one of the largest road networks in the world, aggregating to about 2.3 million km at present. In India, roadways have preceded railways.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 10 Freight Operators & Network Rail.
The role of the railway infrastructure in transport on the Baltic - Adriatic axis Maria Perkuszewska, Vienna, 17th of September 2014.
HOW TO PROMOTE THE ENVIRONMENTAL ADVANTAGES OF THE RAILWAYS ADVERTISING CAMPAIGN FOR RAILWAYS SIAFI 2007 PROJECT.
European Structural and Investment Funds for railways in Poland November 2015 Wolfgang Munch, Deputy Head of Unit DG Regional and Urban Policy.
Innovating cost accounting practices in rail transport companies LO YIIH LIN A
High speed railways in Poland – a political playground or a real need? The advisability of constructing a HSL system in a medium-sized country in Central.
PKP Energetyka S.A. – Projects. QUALITY, SAFETY, COMMITMENT, EFFICIENCY Documents Schedule Scope Structure Risk Targets Questions.
Buy Shellac Kit and Get Great Collection of Nail Polish
Joint Presentation of the NCPs from PL, EE, LV and LT
Communication procedures Traffic Management on RFC5 borders
Department of Transportation Market
POIiŚ „REPAIR WORK/BUILDING WORKS ON THE RAILWAY LINE NUMBER 1 ON THE SECTION CZĘSTOCHOWA ZAWIERCIE”. Bucharest
www 123 hp com setup hp com setup :
www 123 hp com setup 8710 Call Here:
www 123 hp com setup 4650 Printer Support Call:
www hp com setup Printer Support Call:
www 123 hp com setup hp com setup :
www 123 hp com setup 8710 Call Here:
www 123 hp com setup 4650 Printer Support Call:
www hp com setup Printer Support Call:
www 123 hp com setup hp com setup :
www 123 hp com setup 8710 Call Here:
www 123 hp com setup 4650 Printer Support Call:
www hp com setup Printer Support Call:
www hp com setup Printer Support Call:
www 123 hp com setup hp com setup :
www 123 hp com setup 4650 Printer Support Call:
Www hp com setup Printer Support Call:
www 123 hp com setup hp com setup :
www 123 hp com setup 4650 Printer Support Call:
www 123 hp com setup 8710 Call Here:
الوحدة 5- القطاعات: دمج تدخلات مواجهة العنف المبني على النوع الإجتماعي في قطاع حماية الطفل إرشادات دمج تدخلات مواجهة العنف المبني على النوع الإجتماعي.
الاستثمارات في الأسهم – المحاسبة وإعداد التقارير للمستثمر Stock Investments – Investor Accounting and Reporting إعداد :أ.نورا الداوود الفصل الثاني.
Communication procedures Traffic Management on RFC5 borders
נטוורקינג – כולם עושים את זה
الانترنت والبريد الإلكتروني
تبیین نظری ماهیت اقتصاد مقاومتی
ຄວາມຮັບຜິດຊອບຕໍ່ສັງຄົມ ເຄືອຂ່າຍຊາວກະສິກອນລາວ
Ойыны Тапқан – тапқандікі, Көкпар - тартқандікі. Ойынды бастау.
INVESTMENT STATISTICS Approved Investment (USD$)
Railway timetabling tools with automatic solutions
Presentation transcript:

1 PKP Polish Railway Lines investment plans >> Creating a World Class Rail Network << Warsaw, 16 th November 2011 Dr. Marek Pawlik Dr. Marek Pawlik PKP PLK S.A. Vice President

2 TSIs for both HS and CR systems: TSI NOI (Noise) TSI SRT (Safety in Rail Tunnels) TSI PRM (Persons with Reduced Mobility) TSI TAP (Telematics, Passenger Services) TSIs for Conventional rail system TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operational) TSI RST + TSI WAG (Rolling Stock) TSI TAF (Telematics, Freight Services) Structural sub-systems Functional sub-systems OPE MAI TAF/TAP ENE CCS INF RST TSIs for High Speed rail systems: TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operation) TSI RST (Rolling Stock)......

3 Lines of state importance upgrading for interoperability ~1500 kms of lines PKP PLK S.A. investments in structural sub-systems Lines of local importance upgrading in accordance with EU regulations ~1000 kms of lines railway network in Poland kms of lines

4 4 Main Tasks for Preparing High Speed Line Warszawa – Lodz – Poznan/Wroclaw TaskRealisation Feasibility study for HSL Warszawa – Lodz – Poznan/Wroclaw I stage: II stage: Feasibility studies for rebuilding railway junctions in Warszawa, Poznan, Wroclaw, Lodz (with tunnel) Preparation of technical standards for HSL Training of personnel for project, construction and operation of HSL Promotional and information activities Construction of HSL and launching the operation Modernisation of other complementary lines and stations

5 5 Planned HS Lines and its extension to neighbour countries

6 6 HSL Warszawa – Lodz – Poznan/Wroclaw Parameters of a new line Lenght of line~ 450km Maximum speed350km/h Electrification2x25kV, 50Hz Technical standardsin accordance with TSI HS Travel time: Warszawa – Lodz Warszawa – Poznan Warszawa – Wroclaw Poznan – Wroclaw Warszawa - Opole 35 min (currently ~1h 30 min) 1 h 35 min (currently ~3 h) 1 h 40 min (currently ~5 h) 55 min (currently ~2 h 40 min) 2 h 00 min (currently ~4 h 30 min)

7 Modernisation and Extension of CMK line

8 8 HSL Warszawa – Katowice/Krakow – South Border Parameters of a new line Lenght of line~ 440km Maximum speedup to 300km/h Electrification2x25kV, 50Hz Technical standardsin accordance with TSI HS Travel time: Warszawa – Katowice Warszawa – Krakow Lodz – Krakow Poznan – Krakow 1h25min (currently 2h25min) 1h25min (currently 2h35min) 1h25min (currently ~ 3h) 2h30min (currently ~ 6h)

9 High speed trains on conventional railway lines High speed trains on conventional railway lines - standards for: - HS lines - HS trains - compatibility with: Cohesion Fund investments - existing railway infrastructure 2:40 Warszawa - Gdańsk 1:35 około 340 km Warszawa - Poznań 0:35 około 120 km Warszawa - Łódź 1:40 około 345 km Warszawa - Wrocław 1:30 Warszawa -Białystok 1:40 Warszawa - Lublin 3:30 Warszawa - Rzeszów 3:1 5 Warszawa - Szczecin ok. 3:30 Warszawa - Berlin

10 PKP PLK S.A. investment process plans to the Master Plan 2030; tenders for feasibility studies; gradual change from tenders for design and tenders for construction to tenders for design and construction; intensive works on standardised tender documents both in legal and technical dimensions.

11 TSIs for both HS and CR systems: TSI NOI (Noise) TSI SRT (Safety in Rail Tunnels) TSI PRM (Persons with Reduced Mobility) TSI TAP (Telematics, Passenger Services) TSIs for Conventional rail system TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operational) TSI RST + TSI WAG (Rolling Stock) TSI TAF (Telematics, Freight Services) Structural sub-systems Functional sub-systems OPE MAI TAF/TAP ENE CCS INF RST TSIs for High Speed rail systems: TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operation) TSI RST (Rolling Stock)......

12 PKP PLK S.A. CCS investments plans to the ERTMS National Deployment Plan quoted by MP2030; ETCS implementation: - 84 kms - pilot project (l2), kms - CMK speeding-up (l1) - 8 traction vehicles in the pilot, - 10 HS Locos for IC trains (to be equipped after suply) - 20 HS trainsets to be delivered with ERTMS on-board - European ERTMS Master Plan (~ 300 kms per year in Poland); GSM-R implementation: - 84 kms pilot + 2 MSCs in Warsaw and Poznań kms of lines with already available preliminary GSM-R planning

13 TSIs for both HS and CR systems: TSI NOI (Noise) TSI SRT (Safety in Rail Tunnels) TSI PRM (Persons with Reduced Mobility) TSI TAP (Telematics, Passenger Services) TSIs for Conventional rail system TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operational) TSI RST + TSI WAG (Rolling Stock) TSI TAF (Telematics, Freight Services) Structural sub-systems Functional sub-systems OPE MAI TAF/TAP ENE CCS INF RST TSIs for High Speed rail systems: TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operation) TSI RST (Rolling Stock)......

14 RS certification for network versus ETCS cert by projects; PLK Involvement in RS XA legal works: /57/EC annex VII, /131/EC changing annex VII; Follow up EU legal works (GIG based on corr. F & C): - supporting notification of the Polish requirements for RS, - supporting equivalence checking. key RS questions The Railway System Safety Directive RUs and IMS Safety Management Systems Current TSI Legacy National Rules Open Points Off TENS Final TSI Scope of X Acceptance

15 TSIs for both HS and CR systems: TSI NOI (Noise) TSI SRT (Safety in Rail Tunnels) TSI PRM (Persons with Reduced Mobility) TSI TAP (Telematics, Passenger Services) TSIs for Conventional rail system TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operational) TSI RST + TSI WAG (Rolling Stock) TSI TAF (Telematics, Freight Services) Structural sub-systems Functional sub-systems OPE MAI TAF/TAP ENE CCS INF RST TSIs for High Speed rail systems: TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operation) TSI RST (Rolling Stock)......

16 PKP PLK S.A. strategy regarding rail telematics TAF implementation PLK strategy accepted; Involvement in TAF CCG: - PLK is investing in TAF Common Components, - PLK is a test partner for Common Interface; Active in TAF + TAP + WIMO discussions; Preparing implementation (1st step): - CE20 east-west on data from SEPE, - CE65 north-south on manualy entered data. (Wagons & Inter-Modal units Operational database)

17 TSIs for both HS and CR systems: TSI NOI (Noise) TSI SRT (Safety in Rail Tunnels) TSI PRM (Persons with Reduced Mobility) TSI TAP (Telematics, Passenger Services) TSIs for Conventional rail system TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operational) TSI RST + TSI WAG (Rolling Stock) TSI TAF (Telematics, Freight Services) Structural sub-systems Functional sub-systems OPE MAI TAF/TAP ENE CCS INF RST TSIs for High Speed rail systems: TSI INF (Infrastructure) TSI ENE (Energy) TSI CCS (Control Command) TSI OPE (Operation) TSI RST (Rolling Stock) Railway Safety Directive

18 PLK SMS (safety management system) ACCEPTED by Polish NSA

19 Thank you very much for your attention