Texas Nodal Market Go-Live Procedure

Slides:



Advertisements
Similar presentations
June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
Advertisements

Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Detailed Design Document Review Process Compiled by.
Nodal EDW Project Reporting Requirements & Conceptual Design Update EDW Project Team July 23, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program CRR Detailed Design Document Review Process Compiled.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 5, 2009 Joel Mickey
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Emerging Technologies Working Group Update to WMS March 05, Contents I.Update on NPRR 588 II.Solar Forecasting: Protocol Revisions Needed III.Solar.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 6, 2008 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Lead from the front Texas Nodal 1 TPTF Update for TAC April 4, 2008 Trip Doggett.
Kenan Ogelman TAC Chair Tab 8.2: 2013 Competitive Constraints Board of Directors Meeting ERCOT Public September 18, 2012.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
1 Texas Nodal Presentation Board of Director’s Meeting September 20, 2005.
April 17, Texas Nodal Market Implementation Readiness Update May 8, 2007.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
ERCOT Nodal Readiness Plan Trip Doggett TAC Special Meeting September 7, 2005.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Enterprise Data Warehouse Section 8 – Performance Monitoring.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Impact Analysis and Feasibility Study Review – NPRR164, NPRR169 and SCR752 Troy Anderson ERCOT Program Management Office January 15, 2009.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 TPTF Update for TAC June 26, 2008 Joel Mickey.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
Nodal-Related Proceedings at the Public Utility Commission of Texas Keith Rogas September 7, 2005 ERCOT TAC Special Meeting.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
July 7, 2008 TPTF Texas Nodal Market Implementation: Metrics Revisions Jerry Sullivan.
1 TAC Report to the ERCOT Board November 14, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett.
Current Stakeholder Timelines for Emergency Issues May 6, 2008 TPTF.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
1 TDTWG Report to RMS SCR Addressing ERCOT System Outages Tuesday, May 10.
1Texas Nodal Texas Nodal Nodal Process COPs Meeting By Raj Chudgar, ERCOT Monday, 10/24/2006.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Ancillary Service Qualification Self-Certification approach ROS Discussion March 16,
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
TPTF Update for TAC October 5, 2007 Trip Doggett
Protocol Revision Subcommittee
Current Stakeholder Timelines for Issues Needing a Rapid Response
June 7, 2016 Retail Market Subcommittee Update to COPS
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
September Protocol Transition Plan
Commercial Operations Sub-Committee Update to TAC
STEP 8 - CLOSING PHASE: TRANSITION SUPPORT
Oceanic and International Operations
Presentation transcript:

Texas Nodal Market Go-Live Procedure Requesting TAC vote on this Procedure to solidify expectations about the timeline and sequence of events that enable the transition to the nodal market: Spans from the completion of the 168-Hour test through the completion of the Transition Outage Management Guideline Plan Describes the level of testing by ERCOT and MPs during this time period Outlines contingencies plans for loss of nodal functionality after the Texas Nodal Market Implantation Date (TNMID) and guidance for the ERCOT CEO to execute § 21.12.5, if needed Describes communications, health checks, and IT environment controls Other key aspects considered when developing the procedure: Reduce risk by limiting the number of moving parts leading up to, during, and just after the TNMID Reduce risk by operating the systems as-if they are production prior to operating under protocols 4/1/2008 TPTF

Timeline overview and Procedure review process Reviewed by ERCOT Staff (~70 comments) Published v0.04 for TPTF Comment on 4/22; comment close on 5/2 (~130 comments) Published v0.05 for TPTF comment on 5/13; comment close on 5/16 (~50 comments) Distributed v0.06 to TPTF on 5/20 for consideration of voting on 5/23 ‘Motion to approve the TNM Go-Live Procedure v0.07 as modified by TPTF on May 23, 2008’ carried with 100% in favor and 4 abstentions (Cooperative, IOU (2), and IREP). 4/1/2008 TPTF