Enron Generation Overview - Pastoria

Slides:



Advertisements
Similar presentations
Financing Wind Transactions Financing Wind Power The Future of Energy IPED Conference July 25-27, 2007.
Advertisements

FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Regulatory Flexibility Committee Competitive Procurement September 18 th Joe Kerecman Director Government and Regulatory Affairs
Powering Wolverine’s Renewable Future Presented to Great Lakes Regional Wind Institute Detroit, Michigan by John P. Miceli, Energy Market Analyst March.
Charles Hosken, General Manager Imperial Irrigation District
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
SOUTHERN CALIFORNIA EDISON SM Local Capacity Requirements (LCR) RFO for New Resources and Other SCE Solicitations Stu Hemphill September 26, 2013.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
NATURAL GAS LEASES Understanding Your Rights Protecting Your Interests Agricultural Law Resource and Reference Center Ross H. Pifer, J.D., LL.M., Director.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
ECONOMIC DEVELOPMENT SERVICES SOUTHERN CALIFORNIA EDISON Leading the Way in Electricity | Business Customer Division 1 For External Use Economic Development.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Electricity licensing and trading rules in Latvia Mini-Forum, July 3, 2006 Sandija Audzere, Head of Energy Unit, Legal Department Public Utilities Commission.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
Fountain Valley Power 225 MW Peaking Station for Public Service of Colorado.
Brownsville Overview Management Presentation November 2000
Progress Briefing - Energy Initiative
Lincoln Energy Center Overview
California Product Offerings
Irvine Ranch Water District Distributed Energy Storage Case Study
Enron Generation Overview - Pastoria
Who Is Southern Power? Stephen Gowland Business Development Manager
Enron Generation Overview
Wheatland Overview Management Presentation October 2000
Four Corners Wind Resource Center Webinar
First in Service First in Value
Enron Generation Overview
Privileged and Confidential
PowerButte: Solar Overlay Replacement with PowerButte Guide
Enron Corp. Board of Directors Presentation
RMR Update November 6, /05/2002.
Overhaul of Combustion Turbines Under NSR Regulations
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation
Gleason Overview Management Presentation October 2000
Privileged and Confidential
SkyGen Energy Revolving Credit Facility Indicative Proposal
Dominican Republic LNG and Power Plan Facility
Affordable Energy Production from Renewable Fuel
Enron Generation Overview - Pastoria
Brownsville Overview Management Presentation December 2000
Presentation to the Enron Corp. Finance Committee
Utilities Department Wedgefield Water November 28, 2017.
Phase 3 Solar Feasibility Study Findings and Recommendations
Transwestern Station 1 Heat Recovery Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
SunZia Project Description
Dominion Investments in Virginia
Improving Energy Reliability & Performance
New England Resource Adequacy
Improving Energy Reliability & Performance
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
City Council April 30, 2018 Item 13
Plug & Play CHP? Is Your Pocket About to be Picked?
DISTRIBUTED GENERATION in Massachusetts
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Enron Generation Overview - Pastoria October 4, 2000 Confidential & Proprietary Management Presentation Enron Generation Overview - Pastoria

Pastoria Energy Facility Project Overview Development Strengths Expected Project Timeline Key Project Agreements Pro Forma Assumptions California Power Market Other Acquisition Issues Summary

Pastoria Overview Project Overview 750 MW (nominal) natural gas-fired, combined cycle plant Site, located in Kern County, 30 miles south of Bakersfield, will be leased from Tejon Ranchcorp (“Tejon”) Electrical interconnection with Southern California Edison (“SCE”) at the 230 kV Pastoria Substation Gas interconnection with Kern/Mojave pipeline Water will be supplied by the Wheeler Ridge Maricopa Water Storage District (“Water District”) and Azurix (an Enron affiliate) Merchant plant will sell its output into the power markets of the California Power Exchange (“PX”) and the California Independent System Operator (“ISO”) In advanced stage of development California Energy Commission (“CEC”) declared the Application for Certification (“AFC”) “Data Adequate” on January 26, 2000 and is expected to issue its final decision in November 2000

Pastoria Overview Site Location

Pastoria Overview Equipment Two power islands in a “two-on-one” and “one-on-one” configuration comprised of: three GE 7FA combustion gas turbines one GE D11 steam turbine one GE A11 steam turbine three HRSGs Emissions will be minimized through the use of Best Available Control Technology Pastoria will have the option to utilize XONON technology SCRs Cooling towers Zero discharge wastewater system

Development Strengths Pastoria Overview Development Strengths Attractive location SCE power transmission SP-15 pricing zone Kern/Mojave gas pipeline Avoids intrastate transportation charges San Joaquin Valley Unified Air Pollution Control District No impact from South Coast Air Quality Management District reclaim issues Additional value from potential Contract with California Department of Water Resources (“CDWR”) Expansion Reliability-must-run (“RMR”) contract Power islands have been secured EPC contract has been negotiated but not signed ERCs have been obtained Water contracts executed Significant barriers to entry by competitors

Expected Timeline - Development Pastoria Overview Expected Timeline - Development

Expected Timeline - Permitting/Approval Process Pastoria Overview Expected Timeline - Permitting/Approval Process

Key Project Agreements Pastoria Overview Key Project Agreements Tejon Agreements Transaction Agreement Option Agreement Ground Lease Easement Agreement Agreement for Combined Cycle Power Islands Engineering Procurement and Construction Turnkey Contract Water Supply Agreements Water District Azurix Labor Agreements Interconnections Williamson Act

Tejon Agreements Transaction Agreement Pastoria Overview Tejon Agreements Transaction Agreement Outlines relationship between Pastoria and Tejon (site lessor) Option Agreement Grants Pastoria the option to lease the site and acquire easements Six-year option term Ground Lease 25-year term Options to extend for three five-year terms Fixed rent Variable rent based on spark spread Easement Agreement Establishes terms regarding laterals for access, transmission, gas and utilities

Agreement for Combined Cycle Power Islands Pastoria Overview Agreement for Combined Cycle Power Islands Pastoria has secured rights to two GE power islands Contains market-based terms, including performance and delivery guarantees Deliveries will support a June 2003 commercial operations date

Engineering, Procurement and Construction Turnkey Contract Pastoria Overview Engineering, Procurement and Construction Turnkey Contract Contract between PEF and NEPCO (an Enron affiliate) has been completely negotiated, but not executed Contains market-based terms, including performance and completion guarantees Purchaser and NEPCO each will have the option to execute If NEPCO contract is pursued, signing cannot occur earlier than 14 days after closing of the Pastoria transaction

Water Supply Agreements Pastoria Overview Water Supply Agreements Water District Will provide primary supply of up to 5,000 acre-feet per year Judgment validating contract became final September 30, 2000 Azurix Will provide a guaranteed back-up supply and scheduling services Pastoria must exercise an option in 2001 and pay $6,500,000 to acquire rights to 40,000 acre-feet of water and trigger Azurix’s obligations Payments of $500,000 per year and $550 per acre-foot will cover purchases from the Water District and Azurix Pastoria will have option to terminate Azurix at any time and keep the Water District contract and the back-up water supply, subject to paying the applicable termination fee

Pastoria Overview Labor Agreements Pastoria has entered into contracts to construct, operate and maintain the plant with union labor The unions include: IBEW Local #47, AFL-CIO Southern California Pipe Trades Council 16 State Building & Construction Trades Council of California Building and Construction Trades Councils of Kern, Inyo and Mono Counties United Association of Plumbers & Steamfitters

Interconnections Electrical Pastoria Overview Interconnections Electrical Interconnect to the SCE Pastoria Substation – 1.38 miles Double circuit, 230 kV Impact study has been completed; facility study to be issued in mid-October Negotiations on Interconnect Agreement to begin upon issuance of facility study Gas Transportation Interconnect with the 42-inch Kern/Mojave pipeline – 11.65 miles Possible gas sources include Canada, Rocky Mountains, California and Permian Basin 24-inch pipeline 700-900 psig LOI currently under negotiation

Pastoria Overview Williamson Act Site is currently subject to the Williamson Act (the “Act”) The Act is a land-use policy enacted to preserve land and agricultural purposes Implemented through a contract between the landowner and the county To remove land from the Act Approval of County Board of Supervisors Expiration of appeal period Pay cancellation fee ENA has Obtained Kern County Board of Supervisors’ approval Reduced the appeal period to same time frame as the rehearing period for the CEC final decision, through passage of legislation California Assembly Bill 2698 was signed into law by the Governor on September 29, 2000

Pro Forma Assumptions Performance Assumptions Pastoria Overview Pro Forma Assumptions Performance Assumptions Capital Costs Assumptions Annual Operations & Maintenance Assumptions

Performance Assumptions Pastoria Overview Performance Assumptions

Capital Costs Assumptions Pastoria Overview Capital Costs Assumptions

Annual Operations & Maintenance Cost Assumptions Pastoria Overview Annual Operations & Maintenance Cost Assumptions

Other Acquisition Issues Pastoria Overview Other Acquisition Issues Continuing Involvement Additional Value Opportunities Legal Structure

Continuing Involvement Pastoria Overview Continuing Involvement ENA desires to maintain continuing involvement with Pastoria Continuing involvement could include: Scheduling coordination Fuel supply Power marketing Any arrangement must be mutually beneficial for ENA and purchaser

Additional Value Opportunities Pastoria Overview Additional Value Opportunities Additional value being pursued by ENA Expansion of Pastoria to 1,000 MW and a possible RMR contract Bilateral contract with CDWR re: Edmonston Pumping Station Proposals for additional value must be priced as an addition to the base offer

Pastoria Overview Legal Structure Pastoria Energy Facility, L.L.C. is a single member, Delaware limited liability company wholly-owned by ENA Purchaser will acquire all of ENA’s member interest in Pastoria

California Power Market - Overview Pastoria Overview California Power Market - Overview Has experienced numerous energy and capacity shortages and reliability problems The California Energy Commission (“CEC”) estimates 6,000 to 11,000 MW of additional capacity required in five years Transmission imports are limited Increasing load demands in adjacent states are reducing resources available to satisfy California demand Demand is growing by 1,250 MW per year according to the ISO CEC expects reliability problems from 2001 to 2005 60% of generation base has been in service for at least 30 years

California Power Market – Recent Developments Pastoria Overview California Power Market – Recent Developments California experienced significantly higher energy prices than expected this summer According to ISO, high prices were result of: Unexpectedly high load growth exacerbated by unseasonably high temperatures Higher gas prices Larger number of scheduled and forced outages than expected Lack of new plants built in recent years To address the power crisis, ISO and others are recommending: Acceleration of permitting and siting of projects Focus on developing load responsive programs

Pastoria Overview Summary Pastoria has secured rights to much of the major equipment and is in the most advanced stages of the CEC permitting process Pastoria has been strategically located, designed and developed to give it a competitive edge over other plants and optimize its optionality and opportunities to extract additional value ENA desires to maintain some form of continuing involvement with the project