Linac4 status and perspectives

Slides:



Advertisements
Similar presentations
LINAC4 and 3 MeV test stand at CERN
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Managed by UT-Battelle for the Department of Energy SNS MEBT : Beam Dynamics, Diagnostics, Performance. Alexander Aleksandrov Oak Ridge National Laboratory.
ESS DTL beam commissioning
Beam Dynamics Layout of the FAIR Proton Injector Gianluigi Clemente, Lars Groening GSI, Darmstadt, Germany Urlich Ratzinger, R.Tiede, H.Podlech University.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Project X Overview Dave McGinnis October 12, 2007.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Anders Sunesson RF Group ESS Accelerator Division
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Luminosity expectations for the first years of CLIC operation CTC MJ.
LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Linac4 Status 1 M. Vretenar sLHC public event
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Linac4 DTL Beam Dynamics 1Jean-Baptiste Lallement – Mini-workshop on DTL design - 13/09/2011 Mini-workshop on DTL design – 13 September 2011 JB Lallement,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
The Preparation for CSNS Accelerator Commissioning Sheng Wang June 8, 2015, Dongguan.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
The CERN Linac4 history, performance, perspectives
NICA injection complex status
Experience with beam instrumentation at Linac4
Status of HESR 18th March Gießen Dieter Prasuhn.
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Updated with comments 22 may 2017 Updated again 29 June 2017
Linac4 M. Vretenar for the Linac4 design team
A. Martynov on behalf of accelerator division.
Hadron Sources and Linacs
Linac4 Beam Characteristics
Impact of the current debuncher limitations (…can we get rid of longitudinal painting?)
HIPPI yearly meeting, sep28-sep
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Physics design on Injector-1 RFQ
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Update on Linac4 Status, Reliability Run and Modelling
PSB Injection scheme in the Linac 4 era
Superbeams with SPL at CERN
LINAC4 commissioning plans etc.
Progress towards Pulsed Multi-MW CERN Proton Drivers
Pulsed Ion Linac for EIC
Collective Effects and Beam Measurements in Particle Accelerators
Advanced Research Electron Accelerator Laboratory
Generation of Higher Brightness Beams for LHC
commissioning and measurements
The SPL-based Proton Driver at CERN
(Beam) Commissioning Plan
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

Linac4 status and perspectives Alessandra Lombardi and Maurizio Vretenar for the LINAC4 team Contents : Linac4 commissioning up to 160 MeV; Source; Debuncher; Reliability Run. LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Made it to the final energy! Safely on the dump. It has been stripped. It has been delivered to the HST. Oct 2013 3MeV 30 mA Nov 2015 50 MeV 20 mA Nov 2016 160 MeV 18mA 45 KeV 50 mA LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Layout and commissioning stages All items needed for the connection to the PSB are in house LINAC4 machine layout- 352MHz Pre-injector (9m) DTL (19m) CCDTL (25m) Π-mode (23m) 3MeV 50 MeV 100 MeV 160 MeV SOURCE Plasma Generator Extraction e-Dump LEBT 2 solenoids Pre chopper RFQ CHOPPER LINE 11 EMQ 3 Cavities 2 Chopper units In-line dump 3 Tanks 3 Klystrons : 5 MW 1 EMQ 114 PMQ 2 steerers 7 Modules 7 Klystrons : 7 MW 7 EMQ + 14 PMQ 7 steerers 12 Modules 8 Klystrons: 12MW 12 EMQ 12 steerer Beam Commissioning stages 45 keV 3 MeV 12 MeV 105 MeV Not yet the final source – details later (50mA standalone) (30mA-Nov15)***** 25mA – Nov16 October 2013 (10mA- Aug 14) (30mA-oct 15) (20mA-Nov15) 20 mA –Nov16 August 2014 (20mA – Nov15) November 2015 (20mA – Nov 15) 18mA –Nov2016 June 2016 (20mA – Jun16) October 2016 15mA – Nov 2016 LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Beam CURRENT 160 Mev matching and steering 3 MeV 45 keV Source emittance RFQ acceptance LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Beam Current BCT Energy intensity L4L.BCT.1213 45keV 25 mA Emittance/ 3 MeV 20 mA RFQ Acceptance L4L.BCT.4013 19mA L4C.BCT.0717 50 MeV 16mA Matching and L4T.BCT.0107 160 MeV 14 mA Steering LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Reaching the final energy Characteristic curves : energy out of an RF cavity as function of amplitude and phase. Solid line : simulations, Dotted : measurements LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Reaching the final energy LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Transverse measurements From three (or more) profile measurements deduce the emittance. Technique refined in HSL by forward tracking and tomographic reconstruction. At 160 MeV X-X' Emit [rms] = 0.3188 Pi.mm.mrad [ Norm. ] Y-Y' Emit [rms] = 0.3295. ] LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Main parameters LINAC4 – CDR (2006) LIU specs march 2015 LINAC4 – achieved (IN PROGRESS) Protons per bunch in 650 ns : 3 1012 in 1.5 µm 70mA peak at the source 65 ma peak in the linac 40 mA after chopping 60 mA peak at the source 40 mA peak in the linac 26 mA after chopping Injection over 20 turns 50mA peak 18 mA peak in the linac (30 mA potentially) 12 mA average after chopping (20 mA potentially) Injection over 40 turns (ok for LHC beams) 160 MeV 0.4 π mm mrad 0.3 π mm mrad (at 160 MeV) 400 µsec 1Hz Up to 600 µsec 1Hz Fast Chopping at 3 MeV 2µsec inj kicker rise-time Demonstrated , including transmitted beam quality LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

A word on the source Many improvement since march 2015 Intensity Stability Auto-Pilot (automatic regulation of critical source parameters for increased stability) Caesiation with autopilot , time needed went from half day w/o beam to few hours in degraded beam conditions Still needs attention Control of the emittance Optimised electrode shape Matching into the LEBT Mastering neutralisation? Current at 3 MeV before chopping Today’s LINAC4 20mA Record LINAC4 ( at 3 MeV) 30 mA Nominal LIU 40 mA Can be compensated with more injected turns in the PSB . Studies by Benedetto and Forte show that emittance is ok for LHC beams. LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

A word on the Debuncher PIMS-like cavity located approx. 40 m after the last PIMS with the purpose of adapting the energy spread to the desired value in the PSB (from 120keV to 700keV rms). Note that the energy spread from the linac is about 300keV. Without energy painting the needed voltage is 900kV. Ok. With energy painting, the debuncher has to adapt to the velocity profile along the macro-bunch, i.e. more power is needed from the amplifier to dynamically change the phase. With the current amplifier the de-buncher cannot adapt to any energy painting scheme and a compromise on speed/energy spread/range of energy painting is necessary https://indico.cern.ch/event/569203/ and https://indico.cern.ch/event/570568/ LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Reliability Run Purpose : insure a smooth transition from commissioning to operation, achieve a beam-avaliability (tbd) for the PSB as high as possible and possibly above 90%. (https://indico.cern.ch/event/588169/) Phase When 0-Finalisation Before May 17 Consolidation of LLRF and BI instrumentation. CRUCIAL to respect the schedule 1-make the linac4 reliable by addressing weak points June - August Short runs followed by repairs/optimisation Accelerator Fault Tracker in place; OP involved with Linac team still leading. 2-Mock-up of operation as after the connection Sept- Mar18 (including 2 months shut-down) Daily preparation of different beams, continuous operation for weeks, exploitation of the LINAC4 flexibility) OP leading the run with linac team as support. Call-out list during working hours. LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Reliability run – details Keep in place HST dump , to have the possibility to have multiple destinations/users and verify the energy. AFT + the expertise of the Aft team from the beginning (June 2017). Beam-on time calculated from the logbook entries keeping into account that there is not a piquet service. Software to facilitate running from the CCC should be transferred to OP or written by OP. needs have been identified. Main dump HST temporary dump LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

NEXT steps and planning Achieve the HST goals Achieve Reliability Run goals Intervention, repairs : alignment, vacuum DTL, source (and new LEBT?)….. LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

Summary and conclusions Construction and installation of LINAC4 finished at the end of 2016. A beam of 15mA at 160 MeV has been obtained at LINAC4, it has been stripped and delivered to the HST. The Nov 2016 measurement campaign confirms that all the technical choices for the linac are solid and that there are no fundamental show-stoppers or drastic changes needed. Further adjustments on the source and improvement of the matching/steering should allow to reach a minimal LIU LHC beam of 30mA (vs 40 nominal). The reliability run is the focus for 2017 and it is an important step in the transition to operation. LHC Performance Workshop 23-26 January 2017 Linac4 status and perspectives Alessandra Lombardi

LHC Performance Workshop 23-26 January 2017