DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.

Slides:



Advertisements
Similar presentations
Adult Protective Services System (APSS) Project Progress Report Prepared by: APSS Project Team Date: September 16, 2008.
Advertisements

INPO Update CMBG Meeting June 2013
Ensure Vendor/Engineer of Choice Product Quality
How to Document A Business Management System
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Chapter 5: Project Scope Management
IS&T Project Management: Project Management 101 June, 2006.
Project Execution.
Release & Deployment ITIL Version 3
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
4.2 Develop Project Management Plan
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Develop Project Charter
State of Georgia Release Management Training
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Rational Unified Process Fundamentals Module 5: Implementing Rational Unified Process Rational Unified Process Fundamentals Module 5: Implementing Rational.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Implementing Program Management Standards at Duke Energy.
Standard Design Process Overview
Industry Standard CM Indicators Mike Hayes Exelon Nuclear CM SME CMBG Steering Committee.
Delivering the Nuclear Promise Overview
Overview MRD Enterprise MRD Process
Industry Challenges-Quality Opportunities
Design Oversight Working Group (DOWG) – Next Steps
Standard Design Process (SDP) Interfacing Procedures Ashley Taylor TVA
Software Quality Control and Quality Assurance: Introduction
SDP Software Presented by Bill Clover and Brad Diggans Bill Clover
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Project Integration Management
TechStambha PMP Certification Training
Standard Design Process (SDP) Change Management Ashley Taylor TVA
EOB Methodology Overview
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Description of Revision
Our Change Management Approach
Engineering Processes
API 17Q – Subsea Equipment Qualification
Regional Architecture Development for Intelligent Transportation
Vogtle 3&4 Configuration Management
ENG-008: Standard Digital Engineering Process
CIS12-3 IT Project Management
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Project Management Process Groups
Job Analysis CHAPTER FOUR Screen graphics created by:
1915(i)& (k) Implementation Update
Margin Management Configuration Management Benchmarking Group
Design Oversight Working Group (DOWG) Status Update
Adaptive Product Development Process Framework
TRTR Briefing September 2013
Configuration Management AP-929, Revision 1 Mike Stout Chairman CMBG Steering Committee April 9, 2019 Cleveland 2005.
Portfolio, Programme and Project
Workshop 1: Processing Facility Configuration Information
Ctclink executive leadership committee May 31, 2018
Project Integration Management
PSS verification and validation
Fiscal policy program Presented by Cindy Draper, Fiscal Policy Officer – Training Days 2018 Introduce myself This session is to provide an overview of.
Executive Project Kickoff
{Project Name} Organizational Chart, Roles and Responsibilities
New Plant Configuration Management Development and Implementation Process John Maciejewski INPO June 29, 2009 EN MRM Standardization Model.
WORKSHOP Establish a Communication and Training Plan
Project Name Here Kick-off Date
Presentation transcript:

DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017

DNP Initiative ENG-003 Overview Vision: Implement a standard plant modification process to promote efficient use of engineering resources and streamlined engineering changes. Simplified design process common to all stations Industry-wide training applicability Standardized process software Facilitate sharing of information between stations

DNP Initiative ENG-003 Overview What has been accomplished over the past year? 16 Member Steering Committee Developed SDP procedure IP-ENG-001 SME table top review 4 Utilities piloted the SDP procedure Conducted SDP workshops and webcasts Conducted SDP training for Utility SMEs Developed Change Management Plan Developed Standard Qualification Developed and deployed a Nantel SDP Training Module Development of SDP Procedure IP-ENG-001 (Mar – June 2016) Table Top Review (June 2016) Conducted with 14 subject matter experts Pilot plant representatives Engineering vendors Pilot Process (Oct – Jan 2016) McGuire, Surry, Sequoyah, Vogtle Validate procedure, training, change management plans Comments incorporated prior to Rev 0 issue

DNP Initiative ENG-003 Overview What other SDP activities are in progress? Currently developing standard SDP software Electronic preparation, review and approval Tool to manage Engineering Changes during development through implementation and closure Industry Item Equivalency Working Group Industry Digital Design Working Group

DNP Initiative ENG-003 Overview Major Milestones: IP-ENG-001, Standard Design Process, Rev 0 issued Efficiency Bulletin for DNP Initiative ENG-003 as been issued Process – July 28, 2017 Software – July 2018 Design Oversight Working Group established Nuclear Community Website

DNP Initiative ENG-003 Overview Governance of IP-ENG-001: Industry owned and maintained procedure Design Oversight Working Group (DOWG) Similar structure and charter as ERWG Executive Oversight Committee Engineering VP/Director Peer Group DOWG Charter Focus Areas Monitor industry engineering change performance Procedure and Software updates

DNP Initiative ENG-003 Overview Simplified & Streamlined Processes: Engineering Change Types: screening drives to lowest complexity while maintaining safety & reliability Design Change - “Cafeteria-Style” graded approach Design Equivalent Change Commercial Change Other Elements Design Attribute Review Tool Temporary Modifications Emphasis on Teamwork / Stakeholder engagement

SDP Procedure Overview IP-ENG-001 Format Purpose, Scope, Applicability Definitions Roles and Responsibilities Procedure References Utility Interfaces Attachments Flowchart – Procedure Utility Interface Procedure

SDP Procedure Overview SDP Flowchart Attachment 2 (11x17 Handout) Six Phases: Initial Scoping Phase Conceptual/Common Design Phase Detailed Design Phase Planning Phase Installation/Testing Phase Design Closure Phase 11x17 handout to follow along. The procedure uses a flowchart style to step through the process. This convention is modeled after the EPRI Guideline (1008254) and INPO (AP-929) documents, but modified to provide more guidance for each step. These basic rules were created to keep the procedure more visual to reduce the amount of explanation needed. There will be times where the procedure will jump to other attachments and other procedures and we will discuss these as we go through the training. It will probably not fit your utility writer’s guide. Attachment 1 of the SDP has further explanation of the flowcharting conventions. Blue, dotted lined boxes contain steps to be performed using existing utility procedures and are optional if the utility procedure allows Black, solid lined boxes contain steps to be performed using IP-ENG-001 Blocks are numbered based on overall process phase number followed by the step number Solid line arrows are steps to typically be performed, dotted line arrows may be used if beneficial or at management discretion Steps are to be performed in order, unless noted

SDP Procedure Overview Flowcharting Conventions Off page reference to additional steps Document to be issued Start or End of a process Step Number Responsible Owner Decision to determine path Description of step Ref point Blue, dotted line means Performed by utility procedure

SDP Procedure Overview Utility Interface Procedures: Endorse the use of IP-ENG-001 Utilities will implement IP-ENG-001 as written Delineate transitions to IP-ENG-001 Do not redefine, reinterpret, or modify the intent of IP-ENG-001 Provides the “Rosetta Stone” and “road map” to Utility terminology and procedures

SDP Procedure Overview Initial Scoping Phase Request Change Plant Health Process Determine Change Type Advanced Work Authorization? Initial Scoping Study (if needed)

SDP Procedure Overview Conceptual/Common Design Phase Implement at Multiple Sites? Yes – Common Design No – Normal Change Type Form Kickoff and Team Formation Develop Bounding Design Inputs Conceptual Impact Review Meeting Reviews Complete Conceptual Design

SDP Procedure Overview Detailed Design Phase Develop Detailed Design Package - as Determined by Change Type Document Special Implementation Instructions Determine Test Requirements and Acceptance Criteria (if applicable) Reviews Final Impact Review Meeting (if needed) Approve / Issue Change Package

SDP Procedure Overview Planning Phase Plan Work Implementation Package Schedule Work Orders Installation Testing Removal (If Temporary)

SDP Procedure Overview Installation/Testing Phase Implement Change Field Change Requests (If Needed) Perform Tests Turnover to Operations/Return to Service Removal of Temp Change (If Applicable) Turnover to Operations/Return to Service (If Applicable)

SDP Procedure Overview Design Closure Phase Updates to Reflect As-Built Configuration Closeout Engineering Change

SDP Overview Questions?