Integrating Transit and Highway Solutions In High Volume Corridors

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
April 10, 2007 Travel Forecasting Methodology for I-95 HOT Lanes in Virginia 13th TRB National Transportation Planning Applications Conference Reno, Nevada.
How can we relieve congestion in the I-95 corridor? I-95 Congestion Relief Study.
Update on VDOT’s Northern Virginia ITS Architecture Plan and Integrated Corridor Management (ICM) Activities MANAGEMENT, OPERATIONS, AND INTELLIGENT TRANSPORTATION.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
WeGoMil - Real-Time Rideshare August 8, 2012 WeGoMil Real-Time Ridesharing Funded by FHWA & VDOT grants 6 month pilot Exclusively for military personnel.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
1 Presented by Tom Harrington WMATA Office of Long-Range Planning TPB Technical Committee June 6, 2008 Future Metrorail Capacity Needs.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan I-95 Corridor Stakeholder and Service Provider Meeting #2 June 13, 2011.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
TRB Transportation Applications Conference Congestion-Free Freeways US Department of Transportation Establishing a Metropolitan.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
Regional Priority Bus Transit Conference June 24, 2009.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Transportation leadership you can trust. presented to 12 th Annual TRB Transportation Planning Application Conference presented by Dan Goldfarb, P.E. Cambridge.
Metropolitan Washington Region 2002 Vanpool Survey TPB Technical Committee Meeting April 4, 2002 Technical Committee Item # 8.
1 TPB Responses to FAMPO Policies on Allocating and Sharing of Regional Transit Funds Presentation to the Transportation Planning Board Item 14 Ronald.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D.
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Ed Regan Senior Vice President.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
1 What If… The Washington Region Grew Differently? The TPB Regional Mobility and Accessibility Study Ronald F. Kirby Director, COG Department of Transportation.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
The Partnership between Transportation and Technology Jennifer Mitchell, Director Department of Rail and Public Transportation ITSVA Conference.
Congestion Management Process / Performance Measures Report
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Englewood Mews HOA May 23, 2017 Michelle Holland, Megaprojects Communication Manager Virginia Department of Transportation John Morse, I-66 Project.
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Update of Transportation Priorities Plan
Nice to Meeks you….The Transform 66 Multimodal Project
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Charlotte Region Fast Lanes Study
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 15, 2016 Helen Cuervo VDOT District Administrator, Northern Virginia.
Four Winds Condominium Association August 2, 2017
Local Government Roundtable Session Arlington, Virginia
I-77 High-Occupancy Toll Lanes
Regional Roads Committee
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Nick Wood, P.E. Texas A&M Transportation Institute
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
DATA Annual Transportation roundtable June 17, 2015
San Mateo Countywide Transportation Plan update
Slugging in the I-395 Corridor
Board Transportation Committee October 13, 2015
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
Responsibilities and FUNDING
Transportation Task Force Mission and Vision
Status Report on Rochester’s DMC Transportation Plan
DATA Annual Transportation roundtable June 15, 2016
April 23, 2018.
VIRGINIA RAILWAY EXPRESS
Draft FY Six Year Program
Interstate 95 Corridor Improvement Plan
Solving the Challenges of Traffic in Northern Virginia
Presentation transcript:

Integrating Transit and Highway Solutions In High Volume Corridors Jennifer Mitchell Agency Director Southeastern Association of State Highway and Transportation Officials August 14, 2017 8/14/2017 2017 SASHTO Conference

Unlocking congestion requires a commitment to all modes of transportation Role of transit solutions in major corridor projects is critical and transformational Commitment of toll revenues to transit payments and multimodal programs enables the Commonwealth to provide transportation options that otherwise may not have possible Unlocking Congestion

Utilizing Toll Revenues for Transit 8/14/2017 2017 SASHTO Conference

Concession agreement with Express Mobility Partners includes $800M over the next 50 years to support enhanced transit service in corridor Annual transit payments will support new and enhanced point-to-point, peak period commuter bus services (including both capital & operating expenses) Services will originate at new and expanded Park & Ride lots in outer suburbs New transit services: Utilize new express lanes to ensure reliable trip times Operated by local transit agencies Flexibility to optimize services over time based on performance measures I-66 Outside The Beltway 8/14/2017 2017 SASHTO Conference

Transit Service To Be Supported by I-66 HOT Lanes 8/14/2017 2017 SASHTO Conference

I-66 Outside The Beltway: Benefits Increase Carpool and Transit Ridership 2022: New transit services begin operation 2025: 13 new/expanded commuter routes with up to 10,000 forecasted daily riders 4,000 new parking spaces at Park & Rides 2040: 20 new/expanded routes with up to 13,400 forecasted daily riders Over 6,000 new parking spaces at Park & Rides I-66 Outside The Beltway: Benefits 8/14/2017 2017 SASHTO Conference

I-66 Outside The Beltway: Benefits Move More People 2,000-4,000 more people per hour (depending on location) Reduce Congestion Will eliminate 10.5 miles of congestion in each direction during peak hours Hours of daily congestion will be reduced by four to eight hours by 2040 I-66 Outside The Beltway: Benefits 8/14/2017 2017 SASHTO Conference

Allocation of toll revenues to fund new and improved travel choices that include transit, TDM, bicycle, pedestrian and roadway options Tolling to begin in December 2017 Northern Virginia Transportation Commission to choose projects for funding with toll revenues $9.8 million initial Multimodal Program of 10 projects underway Commonwealth Transportation Board must approve projects funding with toll revenues I-66 Inside The Beltway 8/14/2017 2017 SASHTO Conference

I-66 Inside The Beltway: Benefits Use of toll revenue to fund additional and improved travel choices that benefits I-66 users Increase the person-carrying capacity of the highway by 34,000 individuals by 2040 Dynamic tolling will allow traffic to move at free-flow speeds during rush hour I-66 Inside The Beltway: Benefits 8/14/2017 2017 SASHTO Conference

Transurban committed to annual transit payment beginning in 2019 $15 million initially with annual escalation I-95/395 Express Lanes DRPT is leading the development of a new Transit/TDM study in coordination with: Cities of Alexandria and Fredericksburg Arlington, Fairfax, Prince William, Spotsylvania, and Stafford counties Northern Virginia Transportation Commission Potomac and Rappahannock Transportation Commission VRE and WMATA 8/14/2017 2017 SASHTO Conference

I-95/395 Express Lanes: Benefits Move More People 35 - 50% increase in traffic volumes in HOT lanes; relieves General Purpose lanes Move more than 13,000 more people in PM peak (north of Glebe Rd) •Reduce Congestion Average 6 to 8 minute travel time reduction in General Purpose Lanes 15% reduction in travel times in General Purpose lanes Increasing capacity on I-395 reduces diversion of traffic to arterial roadways •Expand Travel Choices Promote HOV throughout the day (currently no incentive to HOV during off-peak) Allow all motorists to continue north on the HOT lanes at Turkeycock Run or enter the southbound HOT lanes exiting DC I-95/395 Express Lanes: Benefits 8/14/2017 2017 SASHTO Conference

I-95/395 Express Lanes: Benefits Increase Reliability Reduce congestion in HOT lanes before and after current HOV restricted periods Improve Safety Increased capacity will reduce the potential for congestion-related crashes Increase safety at Eads Street interchange (eliminate southbound weave) Noise Mitigation Provide opportunities along corridor to mitigation noise I-95/395 Express Lanes: Benefits 8/14/2017 2017 SASHTO Conference

Conversion of 8 miles of HOV lanes in Norfolk to HOT/Express Lane in Fall 2017 I-264/64 Interchange to I-564 Interchange Westbound – Monday through Friday 5AM – 9AM Eastbound – Monday through Friday 2PM – 6PM Opportunity to utilize some toll revenue to support enhanced transit service in the corridor during toll hours Working with HRT to evaluate eligible routes and services I-64 HOT Lanes 8/14/2017 2017 SASHTO Conference

Tysons Corner: Integrating Land Use & Transit 8/14/2017 2017 SASHTO Conference

Dulles Corridor Metrorail Project 8/14/2017 2017 SASHTO Conference

WMATA Silver Line Expansion Funding Source Dollars Percentage Federal $900M 15.6% Virginia $575M 10.0% NVTA $60M 1.0% Fairfax County $918M 15.9% Loudoun County* $274M 4.7% MWAA (Aviation Funds)* $234M 4.1% Dulles Toll Road $2.8 B 48.6% Total $5.76B 100% WMATA Silver Line Expansion Funding *Dollars contributed solely to Phase 2 Portion 8/14/2017 2017 SASHTO Conference

Tysons Corner: Today Existing Tysons Corner Land Use *Courtesy of Fairfax County 8/14/2017 2017 SASHTO Conference

Tysons Corner: 2050 Tysons Corner 2050: 100,000 residents 200,000 employees Source: Fairfax County 8/14/2017 2017 SASHTO Conference

8/14/2017 2017 SASHTO Conference

Integrating Transit and Highway Solutions In High Volume Corridors Jennifer Mitchell Agency Director Southeastern Association of State Highway and Transportation Officials August 14, 2017 8/14/2017 2017 SASHTO Conference