Linoleum Installation System

Slides:



Advertisements
Similar presentations
Avoiding cuts in the kitchen …..they are no longer part of the job! Knife Sharpening using a steel.
Advertisements

NGfL CYMRU GCaD FLOOR COVERINGS.
Interior Wall and Ceiling Finish
Tenon Cork Replacement Remove all the old cork plus any residue of the old glue Use the tenon itself to measure where to cut the replacement cork strip.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
HVAC523 Soldering.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Firestone Building Products EPDM Training. Membrane Attachment.
Basic cleaning procedures
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
Step 1: Prepare the surface The floor should be clean, dry, flat and sound. The floor should be free from oily/waxy or curing compounds.
The rules of pattern layout and cutting
Using commercial patterns Trimming, pinning, cutting out, transferring pattern markings. © PDST Home Economics.
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
1 Part 3 Getting Ready to Sew. 2 Stay Organized Gather all your notions and supplies Double-check the steps to take Press after each construction step.
Square Plant Stand. TOOL: Radial Arm Saw NEXT STEP: Surface Planer RESULTS: Rough size pieces for 4 Legs. 33” long PROJECT Square Plant Stand PART Legs.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
MATTING. REMEMBER… Matt Board is expensive. Measure twice, cut once. Lay your matt board on something clean… on newsprint for example, NOT the floor!
COMPACT SHEETING SARLON COMPACT UNI. INTRODUCTION  Compact vinyl flooring contribute to lowering noise disturbance within a building in a number of ways.
HOMOGENEOUS VINYL TILES & SHEETING COLORFLOR STANDARD.
COMPACT SHEETING ETERNAL MARBLE. INTRODUCTION  Eternal is a compact heterogeneous vinyl floor covering with a calendared backing in 2m wide sheeting.
RUBBER TILES NORAMENT 825. INTRODUCTION  FloorworX partners with nora® to bring South Africa sustainable commercial rubber flooring solutions  Ergonomic,
COMPACT SHEETING SURESTEP STAR. INTRODUCTION  Surestep is a 2m wide glass fibre-mat reinforced compact antistatic vinyl floor covering, featuring a 0.7mm.
HOMOGENEOUS VINYL TILES & SHEETING ELITE PUR. INTRODUCTION  Homogeneous vinyl flooring has a uniform structure and composition from the top to the bottom.
STATIC CONTROL TILES & SHEETING PRIMO SD. INTRODUCTION  Static Dissipative flooring is essential for protecting sensitive equipment from static charge.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
HOMOGENEOUS VINYL TILES FLOORFLEX. INTRODUCTION  Homogeneous vinyl flooring has a uniform structure and composition from the top to the bottom as there.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Create decorative backsplashes, accent walls, or other focal points
MEASURING AND CUTTING Chapter 4.
SURESTEP ORIGINAL COMPACT SHEETING.
SUPERFLEX HOMOGENEOUS VINYL TILES & SHEETING.
No Solder Battery Interrupter
Board Replacement for Engineered Glue-Down Pattern Plus with a Premier Performance replacement board.
Board Replacement Laminate-Angle/Angle & Lock & Fold
Grouting Armstrong Alterna Tile
Global Exotics Board Replacement
Board Replacement for Floating Floors
MARMOLEUM REAL LINOLEUM SHEETING.
MARMOLEUM WALTON UNI LINOLEUM SHEETING.
ETERNAL SAND COMPACT SHEETING.
INDUSTRIAL FLOOR HOMOGENEOUS VINYL SHEETING.
ETERNAL STONE COMPACT SHEETING.
Glue Down Lock N’ Fold Board Replacement
MARMOLEUM FRESCO LINOLEUM SHEETING.
FLOORWORX SD STATIC CONTROL TILES & SHEETING.
ETERNAL SMARAGD COMPACT SHEETING.
Fiberglass-Reinforced Sheet Flooring Installation System
Tapiflex Self-adhesive
Hot-Air Balloons.
Excellence 80, Acczent Platinium 100 Tapiflex Essential 50,
Acczent Classic 40, Meteor 70,  Acczent Excellence 70 Silver,  Acczent Excellence 70 Planet,  Acczent Excellence Topaz 70, Ruby 70 Meteor 55, Ruby Acoustic.
By: ALL PURPOSE CLEAN UP ALL PURPOSE CLEAN UP1 THE PROPER WAY TO CLEAN 5 COMMERCIAL FLOOR TYPES.
Fiberglass-Reinforced Sheet Flooring Installation System
ProtectWALL: 1,5 mm & 2 CR Installation Instructions
All about KNIVES…..
Luxe Plank Replacement
Board Replacement for Engineered Glue-Down Hardwood Floors
CANVAS PUR HOMOGENEOUS VINYL SHEETING.
SARLON TRAFIC VISION 3D ACOUSTIC SHEETING.
ETERNAL PALETTE COMPACT SHEETING.
SARLON TRAFIC CRISTAL ACOUSTIC SHEETING.
Gaskets and Packing An introduction to Gaskets Packing
Clay Canteen Project.
Presentation transcript:

Linoleum Installation System S-780 Linoleum Adhesive S-761 Seam Adhesive

Linoleum Installation System BEFORE INSTALLING Plan the layout: Seams should fall at least 6” away from the Subfloor/Underlayment joints. Do not install over expansion joints. Cut pieces to the proper length, allowing enough material at each end to flash 1 ½” up the walls for fitting.

Linoleum Installation System FITTING Fit piece #1 by Pattern Scribing or Straight Scribing methods and position in the room.

Linoleum Installation System Prepare the seam by trimming the factory seam edge using a straight edge or the S-33 Edge Trimmer. If using a straight edge, hold the knife at a 90º angle.

Linoleum Installation System Using the S-33 Edge Trimmer is quicker, easier and more accurate than hand cutting. S-33 Edge Trimmer

Draw a pencil line on the subfloor at the trimmed factory edge. Linoleum Installation System Draw a pencil line on the subfloor at the trimmed factory edge. The pencil line will act as a starting or stopping point while applying the adhesive, and as a guide if repositioning the material is necessary after the Linoleum has been placed into the adhesive.

Linoleum Installation System Overlap Piece #1 with Piece #2 approximately ½” to 1”. Do not overlay too far as it may result in shading issues. Piece #2 Piece #1 Overlap piece #2 to piece #1 approximately ½” to 1”. Do not overlay too far as it may result in shading issues.

Linoleum Installation System Tube or Lap? The shape of the room may dictate whether you Tube or Lap the material to expose the subfloor. Tubing Material (note location of logo) Lapping Material (note location of logo)

Starting at the lap point and working toward the end wall, apply the Linoleum Installation System Starting at the lap point and working toward the end wall, apply the S-780 Linoleum Adhesive over the entire exposed subfloor area using the regular notching of the S-891 Trowel. Do Not apply the adhesive past the pencil line. Regular trowel notching 1/16” deep, 1/16” wide, 3/32” apart.

Allow the recommended open time before placing the material into Linoleum Installation System Allow the recommended open time before placing the material into the adhesive. Porous Substrates: up to 10 min. Non-Porous Substrates: 10-20 min. Allow the recommended open time before placing the material into the adhesive. Porous Substrates: up to 10 min. Non-Porous Substrates: 10-20 min.

Linoleum Installation System After placing the material into the adhesive use a 100 lb roller to roll the Linoleum. Start in the center of the Linoleum working toward the edges and roll in both directions. Stay 6” to 12” from the seam. Do Not roll the seam at this point. Using a a 100 lb roller roll material up to 6“ to 12” away from the seam. Do not roll the seam at this point.

Carefully lap Piece #2 back halfway to expose the subfloor. Linoleum Installation System Carefully lap Piece #2 back halfway to expose the subfloor. Apply adhesive over the exposed substrate and up to the edge of Piece #1. Piece #2 Piece #1

Linoleum Installation System Lay piece #2 into the adhesive. Starting in the middle of Piece #2 roll the material in both directions using a 100 lb roller (staying approximately 6” to 12” away from the seam area). Do Not roll up to the seam edge at this time. Piece #2

Use the S-83 Recess Scribing Tool to recess scribe all seams net. Linoleum Installation System Use the S-83 Recess Scribing Tool to recess scribe all seams net. S-83 Recess Scriber

Insert a piece of scrap material beneath the scribe mark (under Linoleum Installation System Insert a piece of scrap material beneath the scribe mark (under Piece #2 and overlaying Piece #1). With the scrap on the same side as the cutting hand, cut the seam at a 90 degree angle. Be sure to hold the knife blade straight up and down. Piece #1 Piece #2 Scrap

Piece #1 Apply a 1/8” bead of the S-761 Linoleum Seam Adhesive Linoleum Installation System Apply a 1/8” bead of the S-761 Linoleum Seam Adhesive along the seam edge of Piece #1 using the applicator bottle. Piece #2 Piece #1

Tuck the edge of Piece #2 into place against Piece #1. Linoleum Installation System Tuck the edge of Piece #2 into place against Piece #1. Piece #2 Piece #1

Linoleum Installation System As Piece #2 is being tucked into place the S-761 Seam Adhesive will ooze at the seam area. Piece #2 Piece #1

Clean adhesive residue from the surface of the flooring using Linoleum Installation System Clean adhesive residue from the surface of the flooring using a clean, white cloth dampened with water. S e a m

Remove burr at the seam by carefully skiving with the back Linoleum Installation System Remove burr at the seam by carefully skiving with the back of the S-92 Knife.

Roll the seam into place using the S-77 Hand Roller. Linoleum Installation System Roll the seam into place using the S-77 Hand Roller.

Linoleum Installation System At this point roll the entire floor in both directions, using the 100 lb roller.

Residential Linoleum Linoleum Installation System Residential Linoleum is not a no-wax floor like vinyl – it requires different maintenance procedures Wait 2-3 days before beginning maintenance Damp mop with Armstrong S-485 Commercial Floor Cleaner - do not use Once ‘n Done When exposed to high-traffic areas and/or staining agents, a stain-resistant sealer is recommended. After initial cleaning, apply 2-3 coats of Armstrong Shinekeeper Floor Polish

Residential Linoleum Ongoing floor care: Sweep or vacuum regularly Use walk-off mats at outside entrances Avoid excessive amounts of liquid during maintenance procedures When necessary, strip the floor and reapply coats of polish Use Armstrong products specifically designed for Armstrong Genuine Linoleum Genuine linoleum is made from natural raw materials…products with harsh alkalis or high pH (such as ammonia) should be avoided