Introduction City of San Marcos fastest growing city for 3rd consecutive year. Portions of San Marcos River designated State Scientific Area. City commitment.

Slides:



Advertisements
Similar presentations
Texas Hydrological Innovations Group: Ben Bates, Jason Pickett, Mark Pillion, Yasmin Sierra.
Advertisements

CITY OF SAN MARCOS/TEXAS STATE UNIVERSITY 2015 WORK PLAN BUDGETED CONSERVATION MEASURES.
Proposal to Create and Implement a Geodatabase for Freeman Center, Texas State University San Marcos, TX.
Evacuation Safety Planners * Jason HaycockRobert Broussard Colleen Grentz Project Manager Analyst & Webmaster Analyst & Project Designer.
Socio-Economic Benefits of Austin’s Tree Canopy A proposal for analysis presented by: Kyle Fuchshuber (Project Manager) Jerad Laxson (Asst. Project Manager)
 Project Manager: Kevin Scardino Assistant Manager/Web Master: Nathan Andrews GIS Technician/Data Specialist: Barkley Jenkins GIS Analyst: Mukarram Kamran.
Progress Report : Design and Creation of a Geodatabase on the Colorado River Refuge Owned by Pines and Prairies Land Trust Arma-Geo Products Geography.
IS 466 ADVANCED TOPICS IN INFORMATION SYSTEMS LECTURER : NOUF ALMUJALLY 20 – 11 – 2011 College Of Computer Science and Information, Information Systems.
Geographic Information Systems Thomas Jay Forrest Information Services 8 March 2007.
COMPREHENSIVE DATABASE FOR SPRINGS IN TEXAS Prepared by: Ben Bates, Jason Pickett, Mark Pillion, Yasmin Sierra Status Report.
The City of New Braunfels Parks and Recreations Asset Management Project.
L. Guilliams, C. Pennington, G. Shreve Sidewalk Inventory City of Seguin, Texas Wellness and Lifetime Knowledge WALK.
Construction of Geodatabase for New Braunfels Drainage and Right-of-Way Systems FINAL PRESENTATION BY GENIUS, INC.
BaCon Makes Everything Better!. Ekaterina Troudonochina Julian Montejano Mark Hiler Veronica Gentile Team Manager Webmaster, GIS Analyst GIS Analyst Pwpt.
Rachel Cavin, Manager James Dodds, Assistant Manager Taylor Dorn, GIS Analyst Kyler McNew, GIS Analyst Cartographic Modeling of Sidewalk Location Selection.
Cody JohnstonProject Manager Kathleen AndrewsAssistant Manager Logan HaynerGraphic Designer Peter Kennedy McMinnResearcher.
Katy Morris: Project Manager Nick Down: Assistant Manager Travis Hamel: GIS Analyst.
Proposal for Geodatabase on 5 Mile Dam Soccer Complex Daniel Cohen – Project Manager Samuel Boesch – Assistant Manager Mathew Riggan – GIS Consultant.
Cen-Tex Geodata Solutions Hospital Facility Needs Assessment Proposal.
Rio Vista Park: GPS Inventory & Land Management Brian SingerJohn Elkins Amy CogdillChris Rollins.
DeWitt County Emergency Response Handbook 1 of 14 Project Manager: Robert Gannon Assistant Project Manager: Matt Ahrens GIS Analyst: George Caracostis.
Potential Scenic Sites Analysis for the Hill Country Conservancy Nancy A. Heger, ManagerGene Sipes, Assistant Manager Matt Broadaway, GIS AnalystMatt Gray,
Flash Flood Pilot Project: Prepared for Texas Department of State Health Services and Texas Flash Flood Coalition Sarah Eason, Mark Tijerina, Cooper Sims,
Wendy Welch ADAPTING THE ARC HYDRO DATA MODEL AND TOOLS TO A HYDROGEOLOGIC FRAMEWORK KITSAP PENINSULA, KITSAP, MASON AND PIERCE COUNTIES, WASHINGTON.
San Marcos Municipal Airport Airspace Planning Project Prepared for: Texas Department of Transportation.
Evacuation Safety Planners * Jason HaycockRobert Broussard Colleen Grentz Project Manager Analyst & Webmaster Analyst & Project Designer.
Potential Scenic Sites Analysis for the Hill Country Conservancy Nancy A. Heger, ManagerGene Sipes, Assistant Manager Matt Broadaway, GIS AnalystMatt Gray,
Remote Sensing Applications for Environmental Analysis in Transportation Planning : Application to the Washington State I-405 Corridor.
 Affordable housing in San Marcos, TX is in short supply.  Housing is unavailable for certain income levels.  The ratios between rent-occupied and.
Rio Vista Park: GPS Inventory & Land Management Brian SingerJohn Elkins Amy CogdillChris Rollins.
BaCon Makes Everything Better! Final Report. Ekaterina Troudonochina Julian Montejano Mark Hiler Veronica Gentile Team Manager Webmaster, GIS Analyst.
Introduction The Austin metro area is one of the fastest growing in the country – State Highway 130; easing the pressure – Study of Sections 5-6 How GTG.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
T.E.E.G.S Transportation, Emergency, and Environmental GIS Services Matt Smith Project Manager Lauren Bender GIS Analyst Amanda Magera GIS Analyst Aaron.
Evacuation Safety Planners * Progress Report. Introduction: Objectives for this project were arrived upon through correspondence with the City of San.
San Marcos Flooding EAGLE Project Manager Justine Williams Assistant Manager Joshua Bridges Web Master Alexander Nankervis GIS Analysts David Smith David.
Current Land-Use and Development Database for the Texas Hill Country.
Krystal Zwinggi Project Manager John McClintock GIS Analyst Lance English Webmaster Michael Stanley GIS Analyst.
W. E. T. Water Elevation Technologies David Lynch Project Manager Miriam Mosher GIS Analyst Jeff Gravett GIS Analyst Clinton Buehring GIS Analyst.
City of Woodcreek, TX Project Proposal GEO 4427 Advanced GIS II.
Assessment of Hill Country Land Use: Records at the County Level Loma Environmental Strategies.
Daniel Cohen Matt Riggan Sam Boesch. Introduction  The five mile dam complex needs a geodatabase to keep up with modern technology when repairing features.
Campus Storm Water Proposal A Storm Water Solutions Project.
Logo Amy Jagge, Project Manager, GIS Analyst Steven Ferguson, Assistant Manager, GIS Analyst Blake Durant, GIS Analyst, GPS Tech Jacob Waterman, GIS Analyst,
TEXAS STATE (SAN MARCOS) MAP VISUALIZATION C TO 2015 PROJECT Proposal Submission to the Texas State University Archives 1 Project Manager: Christian.
DeWitt County Emergency Response Handbook 1 of 9 Project Manager: Robert Gannon Assistant Project Manager: Matt Ahrens GIS Analyst: George Caracostis.
TEXAS STATE (SAN MARCOS) MAP VISUALIZATION, C TO 2015 PROGRESS REPORT Project Manager: Christian Hartnett GIS Analysts: Corby Shaub Johnnie German.
Progress Report Sara Breit David Mills Dylan Ham Daniela Castro.
Data Collection on Two Wheels
References/Acknowledgments
Neighborhood Project Funds
Digitizing the San Marcos Cemetery
Needs-Mapping and Prioritization Recommendations
Deep Creek Lake PRB Meeting Budget Update 25 April 2016
Using GIS to Enhance the Collaboration, Creation and Management of Assigning Addresses and New Roads in Island County Becca Blackman GIS Coordinator/Administrator.
GIS Basic Training June 7, 2007 – ICIT Midyear Conference
Analyzing Inlets, Outfalls, and Land Cover Using Spatial and Network Analysis Within the San Antonio Sewershed Aspen Navarro, Project Manager, GIS Analyst.
About Austin Ridge Riders
San Marcos Flooding Evacuation Analysts Geo-Referenced Locations
Progress Report Project Manager-Clancy Taylor
Members Cliff Walden- Manager Ty Wolosin- Assistant Manager
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Digitizing Muleshoe Bend and Reimer’s Ranch
City Council Meeting December 20, 2016
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Geospatial Resources Texas A&M University Cecilia Smith, Ph.D.
Using a Digital Terrain Model to Analyze a Watershed in Order to Match Inlets with their Respective Outfalls Aspen Navarro, Project Manager, GIS Analyst.
Kalamazoo River Greenway Timeline
Digitizing the san Marcos cemetery
Introduction San Marcos Cemetery is a 45-acre plot located along Ranch Road 12, just West of the intersection of 12 and W Holland St. Some burials data.
Presentation transcript:

GPS Inventory & Impervious Cover Mitigation Ramon Lucio Park and Baseball Fields

Introduction City of San Marcos fastest growing city for 3rd consecutive year. Portions of San Marcos River designated State Scientific Area. City commitment to sustainable growth with respect to natural environment and citizens. Park and Recreation Facilities Inventory. Impervious cover, runoff and water quality.

Purpose Determine spatial and attribute data of park amenities. Create geodatabase modeling Ramon Lucio Park boundaries and features. Evaluate impervious cover. Propose plan for mitigation of impervious cover.

Data Ramon Lucio Park Base Map: Buildings Streets Park boundaries GPS monuments San Marcos River Ramon Lucio Park Aerial Image Ramon Lucio Park Features: Parking Spaces Illumination ADA Trash Youth Baseball and Softball Fields Irrigation Fences

Software ArcMap Trimble GeoXT GPS Adobe Creative Cloud GPS Pathfinder

Methodology Evaluation/Update of Rio Vista Park GDB.   Evaluation/Update of Rio Vista Park GDB. Create Data Dictionary (illumination/points, trails/lines, parking lots/polygons, etc). Data collection in the field: Some features contain uniquely identifying attributes (illumination). GPS unit for data collection: Trimble GeoXT (submeter accuracy) prop. of Texas State Univ. Merge data with the Rio Vista Park data into single GDB containing both parks. Determine quantity and location of impervious cover. Propose mitigation plan according to city code.

Timeline Wed, September 2nd – Discuss project guidelines and needs.    Wed, September 2nd – Discuss project guidelines and needs. Mon, September 7th – Identify main objective and tasks. Wed, September 9th – Review previous project data provided by client. Mon, Sept 14th / Wed, Sept 16th – Preliminary site survey.  Mon, Sept 21st / Wed, Sept 23rd – Prepare project proposal. Mon, September 28th – Present Proposal to City of San Marcos.  

Timeline Wed, Sept 30th / Mon, Oct 26th – Begin inventory at Park. Wed, October 28th – Report progress with City. Mon, Nov 2nd / Wed, Nov 18th – Continue Park Inventory. Mon, Nov 23rd / Mon, Nov 30th – Compile data and analyze impervious cover. Wed, December 2nd – Present and handoff final deliverables. GDB Analysis Sep. 2 - Sep 14 Proposal Prep Sep. 14 - Sep. 28 Data Collection Sep. 28 - Nov. 2 Compiling & Analysis Nov. 2 - Nov. 30 Report & Present Nov. 30 - Dec. 2

BUDGET Services/ Salaries Supplies, Equipment, and Overhead Project Manager ArcGIS subscription: $600 $4500 for 20 days work Trimble GPS rental: $3750 Web Master/ Researcher Workstation rental: $7500 $4300 for 20 days work Office supplies: $500 GIS Technician Insurance: $5000 Transportation: $1000 Researcher/ Editor Salaries Subtotal: $17,400 Equipment Subtotal: $17,850

Deliverables Visual representation of Ramon Lucio Park and Baseball features. Map showing amenities and impervious cover locations. CD containing all relevant data and files. Merged geodatabase containing Ramon Lucio Park & Rio Vista Park. Plans for mitigating impervious cover. Final Report and detailed poster.

Conclusion KMRS Geospatial Consultants will: Collect GPS & attribute data for requested features at Ramon Lucio Park. Create integrated GIS merging Rio Vista Park and Ramon Lucio Park data. Propose changes mitigating impervious cover within Ramon Lucio Park.

References Janzen, Eric; and Beausoleil, Sofia; 2015. San Marcos is nation’s fastest-growing city. KXAN-TV Austin Austin, TX, May 20. http://kxan.com/2015/05/20/san-marcos-is-nations-fastest-growing- city/ Last accessed 24 Sep 2015. Gofrey, Andria N.; and Guerra, Jonathan; 2010. Endangered Species – San Marcos Prepared as part of a National Park Service Trails and Rails project in partnership between Amtrak, Inc, and the Department of Recreation, Park and Tourism Sciences at Texas A & M University, 2010. Texas Parks & Wildlife (2012). San Marcos River State Scientific Area Information Sheet. San Marcos, TX. Flinker, Peter; 2008. The Need To Reduce Impervious Cover to Prevent Flooding and Protect Water Quality. Rhode Island Department of Environmental Management, 2008, revised 2010. Schueler, Thomas R.; Fraley-McNeal, Lisa; and Cappiella, Karen; 2009. Is Impervious Cover Still Important? Review Of Recent Research Journal of Hydrologic Engineering, ASCE, April 2009. UNCC Press Release, 2015. University partners with city, county on Web-based Quality of Life Explorer University of North Carolina – Charlotte http://inside.uncc.edu/news-features/2015-06- 15/university-partners-city-county-web-based-quality-life-explorer#sthash.1Jnjppz5.dpuf Last accessed 24 Sep 2015.