EU Phase 3 Customer communications

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
European Developments Transmission Workgroup 5 th April 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
EU Developments Transmission Workgroup 6th October 2011.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
February 2008 Gemini Incident Overview. Agenda Focus this part of the presentation is on the system elements of last year’s Gemini incident :-  Briefly.
European Commission views on intra-day and balancing markets
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
European Developments Transmission Workgroup 1 st December 2011.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
European Developments Transmission Workgroup 3 rd May 2012.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Gas Regional Initiative South South-East
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Transmission Workstream 6 January 2011
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Transparency Project GRI NW Region
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
6/3/2018 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
20th April 2016 Teleconference
EU Implementation Programme
Background and Process
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
Introduction of Code Contingency Guidelines Document
20th April 2016 Teleconference
Update on European Network Codes
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
37th IG Meeting South Gas Regional Initiative
20th April 2016 Teleconference
29th April 2014 Teleconference
CESEC Energy Community Project Monitoring
European Transparency Requirements
Gas balancing – where next
37th IG Meeting South Gas Regional Initiative
Proposer: National Grid NTS Panel Date: 17th April 2014
EUROPEAN TRANSPARENCY UPDATE
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
2/23/2019 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
Gas Regional Initiative South South-East
Introduction of Code Contingency Guidelines Document
Proposer: Debbie Brace Panel Date: 20th March 2014
Transmission Workstream - EU 3rd Package Update
Gas European Network Code Implementation
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Gas Regional Initiative South South-East
Presentation transcript:

EU Phase 3 Customer communications Messages for shippers relating to the impacts of the EU Phase 3 Project March 2015 Version FINAL 1_1 Prepared by: Sarah Carrington

Table of contents EU Phase 3 Customer Communications to the Shipper community page page page page page 06 07 12 14 16 What is the scope of the EU Phase 3 project? Why implement and what are the direct impacts to the shipper community? What parts of the scope have no direct impact but the shipper community should be aware of? EU Phase 3 Milestones and Status Where to go for further information The EU Phase 3 project aims to meet the obligations set out in the Interoperability and Data Exchange Network Code EU Phase 3 Milestones and Status Where to go for further information: Xoserve Website Email Call Common Units Shipper to TSO Data Exchange Disapplication of scheduling charges at IPS Publication of 10 years worth of future capacity data on ENGSOG IP: Publication of hourly physical flow data

Setting EU Phase 3 in Context – introduction to The Third Energy Package

The European Union (EU) legislation on European gas and electricity markets referred to as the Third Energy Package was introduced by the European Parliament and the Council of the European Union in 2009, and came into law on 3rd March 2011. The aim of this legislation was to create a harmonised European internal energy market. The Third Energy Package consists of two EU Directives and three EU Regulations: Directive 2009/72/EC- concerning common rules for the internal market in electricity Directive 2009/73/EC - concerning common rules for the internal market in gas Regulation (EC) No 713/2009 - on the establishment of the Agency for the Cooperation of Energy Regulators ACER Regulation (EC) No 714/2009 - on conditions for access to the network for cross-border exchange of electricity Regulation (EC) No 715/2009 - on conditions for access to the natural gas transmission networks European Network Codes   The European Third Energy Package came into law on 03 March 2011, with the aim of developing a more harmonised European internal energy market. The Third Energy Package consists of two Directives and three Regulations.  The main Regulation that prescribes conditions for access to the gas transmission network is Regulation EC No 715/2009. To meet the conditions set out within Regulation EC No 715/2009, a number of European Network Codes have been developed.  Once passed into EU law, the European Codes supersede Great Britain's (GB) law and therefore the Uniform Network Code (UNC).  Where the GB gas regulatory framework is considered non-compliant with the European Codes, National Grid NTS (as the Transmission System Operator), has raised a series of EU related UNC Modifications, in order to achieve legal compliance with the Codes. Copies of the various EU related UNC Modifications currently in progress can be found on the Joint Office web site at: http://www.gasgovernance.co.uk/eurodevts A roadmap is published below, which is intended to serve as a reminder and summary for stakeholders of the various UNC and other contractual changes that are needed to implement the EU Codes The European Network Codes approved by the European Commission to date are summarised below, with attached links to the official Regulations: Congestion Management Procedures (CMP) This specifies rules to ensure booked capacity at Interconnection Points is used efficiently to address issues of contractual congestion in transmission pipelines.  The rules amend Annex I of Regulation (EC) No 715/2009 on conditions for access to the natural gas transmission networks.  A two phased implementation in October 2013 and October 2014. Congestion Management Procedures Capacity Allocation Mechanisms (CAM) Commission Regulation (EU) No 984/2013 CAM (Capacity Allocation Mechanisms) seeks to create more efficient allocation of capacity at the Interconnection Points between adjacent Transmission System Operators.  CAM introduces the revised 05:00-05:00 gas Day arrangements at Interconnection Points.  It applies in Great Britain from 01 November 2015. Capacity Allocation Mechanisms Network Code on Gas Balancing of Transmission Networks (Balancing Code) Commission Regulation (EU) No 312/2014 creates balancing rules, including network-related rules on nominations procedures at Interconnection Points, rules for imbalance charges and rules for operational balancing between Transmission System Operators.  The new gas Day arrangements are applicable across the GB balancing zone via this code.  It applies in Great Britain from 01 October 2015.  Balancing Code Network Code on Interoperability and Data Exchange Rules This obliges Transmission System Operators to implement harmonised operational and technical arrangements in order to remove perceived barriers to cross-border gas flows and thus facilitate EU market integration.  Implementation is required by 01 May 2016. Uniform Network Code is the Commercial rules related to the GB regime, which were implemented in the 1990s. The UNC is available on the Gas Joint Office website. Changes to the UNC are called Mods (Modifications) and are given a number. The EU Network Code are essentially primary EU legislation, it was agreed by the industry that NG would transpose the obligations of each EU Network Code into the GB Regime through the Mod route. If you go on to the Joint Office webpage, you’ll see ‘European Modifications’ these are the Mods related to the EU Network Codes. So the Mods relate to the UNC but can also be linked to an individual requirement from an EU Network Code. UNC Modifications The Modifications created to meet the EU Network Code obligations are: 0510V: Reform of Gas Allocation Regime at GB Interconnection Points 0519: Harmonisation of Reference Conditions at Interconnection Points Each EU Network Code; Congestion Management Principles (CMP), Capacity Allocation Mechanism (CAM), Balancing, Interoperability and Tariffs etc.) contains (or will contain) requirements for translation into the GB regime.

What is the scope of the EU Phase 3 project?

EU Phase 3 Project Driver EU Network Code on Interoperability and Data Exchange Rules This obliges Transmission System Operators to implement harmonised operational and technical arrangements in order to remove perceived barriers to cross-border gas flows and thus facilitate EU market integration. The scope that impacts Shippers includes: Common Units: Shippers will now place nominations for Bacton IP at the reference temperatures of 0/25. Shipper to TSO Data Exchange: Shippers will now have the option of using a new Shipper to TSO data exchange method for the IP Nomination process utilising Edig@s messages via the B2B layer. Disapplication of scheduling charges at Interconnector Points: Automated Scheduling Charges will no longer be applied. There is no impact on APIs (application programme interface) and no new APIs. The Interoperability Network Code obligations come into force on 1st May 2016.

Why implement and what are the direct impacts to the shipper community?

Common Units –what are the impacts? Shippers will now need to nominate at 0/25 reference conditions at Bacton IP (approximately 0.1% less than existing 15/15 reference conditions). Gemini will have the ability to draw a distinction between gas flowing at a reference temperature of 15/15 and 0/25.  This will mean that certain processes will be undertaken at 0/25 (Nominations) and certain processes will be undertaken at 15/15 (Shipper Balance) in Gemini. The maximum nomination period (30 days) will not be available for Users at Bacton IP, IUK and BBL, for Gas Day 1st May. Users will only be able to effectively nominate from D-20 (11th April 2016). The maximum notice periods available will then increase incrementally from Gas Flow Day 1st May 2016; until the full 30 day notice period is available again. This is similar to the transitional arrangements that were requested as part of the Gas Day go live on 1st October 2015. Changes to Market Information Provision Initiative (MIPI) to ensure that the data published on the NG Website is in GB Units. Data published on ENTSOG transparency platform will continue to be published in EU units. Common Units –what are the impacts? 15/15 = GB units 0/25 = EU units This is being implemented to comply with the Interoperability and Data Exchange Network Code and Transparency Guidelines in Reg 715/2009

Shipper to TSO Data Exchange – what are the impacts? The Interoperability code requires Transmission System Operators (TSOs) to implement ‘common data exchange solutions’ in their nominations arrangements with TSOs and Shippers at Interconnection Points (IPs) – Interconnector UK, BBL Company, Moffat for GB). TSO - TSO data exchange was successfully delivered as part of EU Phase 2 in 2015 utilising a Business to Business (B2B) solution layer. National Grid NTS will meet the obligation by implementing an integrated solution with a B2B layer that enables us to communicate with a counterparty that has implemented a document based solution. Shippers interested in taking up this opportunity should in the interim email Xoserve at .box.xoserve.geminichange@xoserve.com Xoserve will then liaise with the Shipper and an individual implementation plan will then be created. Shippers can sign up to using the B2B layer access before and after go live of 1st May 2016. Shipper to TSO Data Exchange – what are the impacts? This is being implemented to comply with the Interoperability and Data Exchange Network Code and Transparency Guidelines in Reg 715/2009

Disapplication of scheduling charges at IPs - what are the impacts? There will be a system solution to ensure that Scheduling Charges will no longer be applied at Interconnection Points Removal of potential charges to the shipping community regardless of whether it is an ‘Allocate by Nominate Day or an ‘Allocate by Measure Day’. This is being implemented to comply with UNC Mod 510 which is linked to the Interoperability and Data Exchange Network Code

What parts of the scope have no direct impact but the shipper community should be aware of?

What parts of the scope have no direct impact but the shipper community should be aware of? Publication of 10 years worth of future capacity data on ENTSOG Transparency Platform : driven by Annex 1 Regulation 715/2009 - future Entry and Exit capacity data for all Relevant Points published annually 10 years ahead on the ENTSOG Transparency Platform. This information is currently available on the National Grid Website. Publication of hourly IP physical flow data: on the ENTSOG – not requested by regulatory change but agreed by ENTSOG.

EU Phase 3 Milestones and Status

EU Phase 3 Project Milestones and Status System Testing (ST): 23rd November to 29th January Complete System Integration Testing (SIT): 1st January to 4th February Complete. There has been really positive engagement with the adjacent TSOs for SIT and UAT. User Acceptance Testing: 1st February to 11th March NG completing the testing of the new Shipper to TSO data exchange functionality on behalf of the community as well as system functionality change including Gemini. User Trials: 14th March to 8th April An email inviting Shippers to take part was issued on the 29th January. Code Deployment: 10th April All scope items identified will be implemented on this date. A contingency date of the 24th April is also planned. This will take place during an extended Gemini outage which has been communicated via UK Link Committee. There will be a further communication in the event that the contingency date is used. Go Live: 1st May EU Phase 3 Project Milestones and Status

Where to go for further information

Where to go for further information Visit Xoserve for information on Gemini changes at: www.xoserve.com Please email your questions to : Box.GasOps.BusinessC@n ationalgrid.com Please call: Sarah Carrington EU Comms and Engagement Lead on 01926 655560