Principal Load Profiling and Modeling

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Results from the 2013 Survey of LSEs to Obtain Retail DR and Dynamic Pricing information Public Summary Frontier Associates LLC June
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Loads in SCED Version 2 Proxy G Proposal. This is a proposal from Carl Raish as an individual … it has not been vetted internally at ERCOT and should.
Price Responsive Load / Retail DR Data Collection Project and Lessons Learned Paul Wattles Karen Farley DSWG March 2014.
Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley DSWG and RMS sub team October 16, 2012.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Price Responsive Load / Retail DR Workshop Paul Wattles Karen Farley DSWG/REP Workshop April 2014.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
Price Responsive Load Survey Draft Results Paul Wattles Karen Farley DSWG and RMS Aug. 22, 2012.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ERCOT Demand Response Spring 2015 ERCOT Operator Seminar.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Weather Sensitive ERS Training Presenter: Carl Raish Weather Sensitive ERS Training Workshop April 5, 2013.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
2016 Long-Term Load Forecast
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
DSWG – March 9, 2015 Four-CP Response in ERCOT Competitive Area Carl L Raish.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish October 6, 2015.
Sept. 28, 2007 Interim Update Load Response Survey.
Price Responsive Load / Retail DR Workshop Paul Wattles Carl Raish Karen Farley REP Roundtable August 5, 2015 – Updates in RED.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Distributed Generation Registration June 30, 2008.
Retail DR and Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley Updates to DSWG & RMS January 2013.
Price Responsive Load / Retail DR DSWG Update Paul Wattles Carl Raish September 17, 2015.
Price Responsive Load / Retail Demand Response 2013 Analysis Report Overview ERCOT Staff & Frontier Associates RMS Meeting August 5, 2014.
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
DSWG - June 25, Four-CP Response for Transmission- and Distribution- Connected ESIIDs in ERCOT Competitive Area Carl L Raish.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Price Responsive Load / Retail DR RMS Update Paul Wattles Carl Raish September 1, 2015.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Analysis of Load Reductions Associated with 4-CP Transmission Charges in ERCOT Carl L Raish Principal Load Profiling and Modeling Demand Side Working Group.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Interconnecting Wind & Solar Energy in Texas
CRR Deration and NPRR821 WMS 09/06/2017.
EE379K/EE394V Smart Grids: The Retail Perspective
Wind Management at MISO
Hurricane Rita.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
John Dumas Director, Wholesale Market Operations
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Emergency Response Service Baselines
Reflecting Losses in DR within ERCOT August 22, 2012
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
The Retail Perspective
Fleet Electrification
Wholesale Electricity Costs
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

Principal Load Profiling and Modeling Analysis of the Impact of 4-CP Transmission Charges on Real Time Prices Carl L Raish Principal Load Profiling and Modeling WMS – September 6, 2017

How 4-CP Works ‘BUSIDRRQ’ customers ≥ 700 kW or served at transmission (69 kV) voltage are subject to 4-CP charges. Simple average of the metered load during ERCOT system monthly peak 15-minute intervals in four summer months -- June, July, August & September. Multiplied by the applicable prevailing TDSP Tariff, as approved by PUC. Is the basis for the monthly 4-CP-based rates for the following calendar year. Analysis for this report addressed 4-CP in both the competitive and NOIE areas of ERCOT. The analysis used settlement system interval data For ESIIDs in competitive ERCOT areas with ‘BUSIDRRQ’ profile types. Calculated interval data of the native load in NOIE areas … NOIE area boundary metered imports plus generation located inside the NOIE area

Analysis Objective Test quantification of 4-CP impact on real-time prices by: Remove estimated amount of 4-CP response (adding it back to ERCOT load); and, Estimate revised system lambda, taking price response from load and distributed generation into consideration. Issues with generator behavioral response

Analysis Methodology Select 4-CP and Near-CP days in 2015 and 2016. 11 Near-CP days in 2015 and 14 Near-CP days in 2016 Use intervals 48 – 96 for each of the 33 days (1,584 intervals) Calculate revised system lambda with GTBD increased by the 4-CP response amount in each SCED interval Develop ERCOT-level price response model for load and distributed generation Competitive area load using annual survey Load of NOIEs identified as responding to price Exports from distributed generators that respond to price 4. Iteratively: Calculate price response MW based on revised system lambda Modify GTBD based on price response Calculate revised system lambda at the modified GTBD Continue iterating until the point (GTBD adjusted for price response, revised system lambda) matches a point on the aggregated energy offer curve

Competitive Load on 4 CP Days - 2016 CP Reduce = 436 CP Reduce = 452 CP Reduce = 626 CP Reduce = 577 Load reductions for ESIIDs that respond to 4-CP Reductions start around noon and continue to midnight

NOIE 4 Load on CP Days - 2016 CP Reduce = 440 CP Reduce = 481 CP Reduce = 783 CP Reduce = 552 Load reductions for NOIEs that respond to 4-CP Reductions start around noon and continue to midnight

Competitive + NOIE Response 2009 - 2016

Max 4-CP/NearCP Reductions - Hour Ending 17:00 Slope = 21 Slope = 2 Slope = 88

Growth of ESIIDs and NOIEs with 4-CP Response Slope = 10

Max CP/NearCP Reductions - Hour Ending 17:00 Postage Stamp rate for Transmission Cost of Service has more than tripled since 2002 >$7B in Competitive Renewable Energy Zone (CREZ) transmission investment $4.9B of CREZ activated in 2013 alone >$2B in projects activated in 2016 Slope = 2 Postage Stamp Transmission Rates 2002-2017 Currently $52.91 Source: PUCT Dockets The postage stamp rate (per 4-CP kW) is charged to DSPs, who in turn reimburse TSPs for their transmission investments

System Lambda SCED System Lambda λ The cost of providing one additional MWh of energy at the load electrical buses. Essentially the load weighted average marginal price for energy across nodes Aggregate Energy Offer Curve Identify online generators Identify SCED energy offer curves for each Identify LASL and HASL for each Aggregate the SCED energy offer curves between LASL and HASL across the generators Caveats This approach does not consider generator ramp rates, constraint changes, market behavior changes

Preliminary Impact of 4-CP Back-cast on RT Prices Final system lambda > $200 & Δ system lambda > $50 2015 - 3 days and 19 intervals 2016 - 7 days and 40 intervals This approach does not consider generator ramp rates, constraint changes, market behavior changes.

Back-cast Impact of 4-CP on Real Time Prices Final system lambda <= $200 | Δ system lambda <= $50 2015 - 15 days and 701 intervals 2016 - 18 days and 824 intervals This approach does not consider generator ramp rates, constraint changes, market behavior changes.

Quantifying ERCOT level Price Response ERCOT has conducted an annual survey of REPs to identify ESIIDs on several categories of demand/price response programs. ERCOT has used the survey data to quantify the frequency and magnitude of response in competitive areas ERCOT has used NOIE load as calculated from boundary meters to identify NOIEs the respond to price and has quantified the frequency and magnitude of that response. ERCOT has used export data from distributed generators to identify those that respond to price and has quantified the frequency and magnitude of that response.

Competitive Price Response Survey Results 2015 MW 2016 MW ESIIDs Deployed 2015 ESIIDs Deployed 2016 ESIIDs Not Deployed 2015 ESIIDs Not Deployed 2016 4-CP 1,321 1,409 1,800 1,700 9,500 9,700 BI 200 157 9,000 13,000 - OLC 7 4 12,000 2,000 3,000 7,000 OTH 15 34,000 PR 30 28 45,000 79,000 452,000 435,000 RTP 11 1 5,000 10,000 TOU 322,000 331,000

Load Price Response Competitive Loads NOIE Loads Use the 2015 and 2016 REP survey submissions to identify ESIIDs on Real Time Pricing and Block and Index Pricing. Quantify load reductions by load zone on high price days (at least 4 consecutive intervals with prices >= $200) Estimate regression model of load reduction as a function of price at the load zone level NOIE Loads Quantify load reductions by NOIE on high price days (at least 4 consecutive intervals with prices >= $200) and classify as price responsive based on frequency and magnitude of response Estimate regression model of load reduction as a function of price at the load zone level Calculate aggregate model

Distributed Generator Price Response Registered Distributed Generators Selected generators being paid Load Zone prices for exports Eliminated any with primary fuel of sun, wind or other Does include exports from PUNs with generators that are not Generation Resources Unregistered Distributed Generators Selected ESIIDs with DG profile type (exports are settled as negative energy) Eliminated Distributed Renewable Generators (PV and WND profile types) Quantify Price Response Followed baseline methodology used for loads to quantify export increases on high price days (at least 4 consecutive intervals with prices >= $200) Classified generators as price responsive based on frequency and magnitude of response (47 of 109, name plate MW 428.9) Estimate regression model of export increase as a function of load zone price Create aggregate model

Distributed Generator Baseline Examples

Interaction of 4-CP and Price Response Removal of 4-CP response would tend to increase prices Price increases would trigger increased price response Find the point on the aggregated offer curve where system lambda for the GTBD adjusted for price volume of price response is consistent with the price response modeled as a function of system lambda. Limited analysis to days identified with significant changes to system lambda when adding 4-CP response.

Adjust System Lambda for Price Response Aggregate Energy Offer Curve Actual ($75, 66,776.4 MW)

Adjust System Lambda for Price Response Increase GTBD by 1,020 MW of 4-CP Reduction ($6,991, 67,796.2 MW)

Adjust System Lambda for Price Response Lower GTBD by 408 MW of Price Response ($197, 67,388.2 MW)

Adjust System Lambda for Price Response Converges at 188 MW of Price Response ($725, 67,608.5 MW)

Back-cast Impact of 4-CP on Real Time Prices Accounting for anticipated DR/DG price response 2015 - 3 days and 19 intervals 2016 - 7 days and 40 intervals This approach does not consider generator ramp rates, constraint changes, market behavior changes.

Behavioral Issues 4-CP response is hard to predict including both the deployment days and magnitude Only 10 of the 33 deployment days in 2015 and 2016, disregarding behavioral changes other than price DR and DG price response, could potentially result in significant real time price increases 2009 2010 2011 2012 2013 2014 2015 2016

Behavioral Issues Small changes in 4-CP response, disregarding behavioral changes other than price DR and DG price response, can result in significant changes in system lambda Short term behavioral changes in response to higher prices would be likely to draw historically off-line resources into the market and would put significant and highly variable downward pressure on prices Long term behavioral changes of all types would be likely and would further increase the downward pressure 2015

Behavioral Issues (continued) 2016

Behavioral Issues (continued)

Observations Back cast analysis of removing 4-CP load reductions without any other adjustment does show a significant and highly volatile impact on real time prices in 2015 and 2016 for ten days (59 intervals). 4-CP reduction across intervals and across days are highly variable and back cast prices are highly volatile. The back cast analysis shows small changes on the remaining 23 days … days not likely to trigger DG and DR price response or behavioral changes among Generation Resources. Considering price response from DG and DR in the back-cast analysis does show reductions in the impact on real time prices, but the volatility of the impact remains high. On days with significant impacts, Generation Resources would be likely to modify their offer decisions based on the potential for the higher price increases identified above. The short and long term potential for behavioral changes in DR, DG and Generation Resources clearly exists and likely would be highly variable as well.

Questions? ON OFF craish@ercot.com 512/248-3876