Municipal Class Environmental Assessment

Slides:



Advertisements
Similar presentations
1 Environmental Assessment of Trade Negotiations Government of Canada Approach WTO Public Forum September 25, 2006.
Advertisements

TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Identify Problems, Planning Objectives and Constraints.
Environmental Project Commitments The Alberta Experience
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Scoping in the EIA process Proposal Identification Screening
Bureau of Land Management Regulations Washington State Association of Counties Cooperating Agency & Coordination Training November 22, 2013 – Vancouver,
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Internal Auditing and Outsourcing
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
Environmental Impact Assessment (EIA): Overview
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Feasibility Study.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
The Business Plan: Creating and Starting the Venture
Traditional Project Development Process ConstructionPlanningNEPA Design ROW CE, EIS, EA Location and Design Concept approval.
The overarching goal of the legislation is to have Ecology conduct research and develop recommendations for implementing and financing an electronic product.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Agenda  Opening Remarks - NIRB  NIRB Presentation: NLCA Reconsideration of the Meadowbank Gold Mine Project Certificate  General questions on.
National Environmental Policy Act Environmental Engineer US Army Garrison.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
March 8, 2016 Presentation of Item CCW – Solid Waste Management Infrastructure Projects – Final Siting Report.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
Strategic Environmental Assessment (SEA) Development of alternatives for environmental planning in Ireland Dr Margaret Desmond EPA Postdoctoral Research.
Meeting of the Parties to the Protocol on Pollutant Release and Transfer Registers to the Convention on Access to Information, Public Participation in.
What If I Have to Go Beyond an IEE?. EA Training Course 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs) How Do I Prepare.
EIA approval process, Management plan and Monitoring
Design and modeling 10 step design process
Ten-Stage Design Process
Sanitation is Business
Environmental Evaluation of Projects in Greece
The Public Sector Equality Duty (PSED) & Integration Joint Boards
Ten-Stage Design Process
Code Governance Review UNC Modification Proposals
Relationship between World Bank and Romanian EA requirements
Strategic Environmental Assessment (SEA)
Bosnia and Herzegovina Community Development Project
Feasibility Report.
10th Air Quality Governance Lekgotla Session: 7.3
Environmental Impact Assessment EIA
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
The GEF Public Involvement Policy
Issues of Technology Needs Assessment for Climate Change
Ontario Presentation to the NEB Modernization Expert Panel
Presentation transcript:

Municipal Class Environmental Assessment

Municipal Class Environmental Assessment Protecting the Environment is very important in Ontario. Municipal projects often have the potential to impact the natural, social and economic environment so the projects must comply with the Province’s Environmental Assessment Act.

Environmental Assessment is a planning and decision making process used to promote environmentally responsible decisions. The Municipal Class Environmental Assessment process has been approved under the Environmental Assessment Act and it sets out the process that municipalities follow while planning most sewer, water, road, and transit projects.

EA Process This presentation will describe the general process used in Ontario to assess the potential environmental impacts of a municipal project on the environment and then select the best solution. Project Types Then we will outline the specific process used for each type of project.

Responsibilities and Rights Next we will describe the proponent’s role and then we will review the public’s responsibility to participate in the Environmental Assessment process and their right to question or appeal the decision at the end of the process. Detailed Information Finally, we will provide direction on how to obtain further, more detailed information on the Municipal Class Environmental Assessment.

Municipal Class Environmental Assessment General Process “The Problem” The Municipal Class Environmental Assessment process begins with defining the problem or the opportunity that should be addressed. Consultation with affected parties should be early in and throughout the process such that the planning process is a cooperative venture.

Municipal Class Environmental Assessment General Process Alternative Solutions Consideration of a reasonable range of alternatives, both the functionally different alternatives to, and the alternative methods of, implementing the solution are to be considered.

Municipal Class Environmental Assessment General Process Preferred Solution Next, identification and consideration of the effects of each alternative on all aspects of the environment must be done. It is important to note that the environment is broadly defined and includes the natural, the social/cultural, the technical and the economic/financial environments. All must be considered. After a systematic evaluation of alternatives in terms of their advantages and disadvantages, to determine their net environmental effects, a preferred solution is selected.

Municipal Class Environmental Assessment General Process Documentation The information gathered and the process followed is documented and available for public review. The style of the documentation varies with the project type.

Municipal Class Environmental Assessment General Process Implementation Implementation includes preparing contract drawings, proceeding with construction and monitoring the environmental provisions that were committed to during the process.