Italian policies and programmes on JI

Slides:



Advertisements
Similar presentations
European Commission: Environment Directorate General Slide: 1 Linking the EU Emissions Trading Scheme with JI and CDM Linking the EU Emissions Trading.
Advertisements

Preparatory work on JI in Bulgaria Milya Dimitrova Ministry of Environment and Water, Bulgaria UNFCCC Technical Workshop on Joint Implementation
1 CF Assist Activities in Central and Eastern Europe Helmut Schreiber Annual Meeting of the Host Country Committee on Carbon Finance February 15-16, 2005.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
Conducting Carbon Projects Presented by Adam Shepherd Regional Workshop on Legal, Institutional and Financial aspects of Carbon Finance Istanbul, Turkey.
The New Market Mechanism Emissions Trading – Developments in China & Europe Workshop 25 th April 2012 Dr Luke Redmond
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
CONTRACTING FOR CARBON Legal Framework for JI Projects under the Kyoto Protocol.
Asian region workshop on “capacity development for the clean development mechanism” October 2005, AIT, Bangkok, Thailand VIETNAM DNA INSTITUTIONAL.
The Austrian JI/ CDM programme Forum MPD Maroc Marrakech, April the 21st and 22nd 2004 Mag. Angela Friedrich Ministry of Environment, Austria.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
PCF project cycle Training Workshop : Project Formulation for the Clean Development Mechanism Hanoi, Vietnam September 30 – October 2, 2002.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Carbon Finance Strategy at the World Bank Carbon Finance Strategy at the World Bank CHARLES CORMIER December 2005.
Options and Recommendations Pre-sessional consultations on registries June 2002, Bonn, Germany DEVELOPMENT OF A NATIONAL REGISTRY IN BULGARIA Options.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Cooperative Mechanisms UNFCCC secretariat JI under UNFCCC - An overview -
European Wind Energy Conference February - 2 March 2006, Athens, Greece PROMOTING WIND ENERGY THROUGH THE FLEXIBLE MECHANISMS OF THE KYOTO PROTOCOL.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
Carbon Finance Strategy the World Bank Carbon Finance Strategy the World Bank CHARLES CORMIER Sept 2005.
The policy and plan on CDM Forum MDP Maroc Marrakech, April Italian Ministry for the Environment and Territory Department for Global Environment,
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
Canada’s CDM & JI Office Project Facilitation Support Through Canada’s CDM and JI Office.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
UNEP Collaborating Centre on Energy and Environment CD for CDM - Phase 1 - First National Workshop, Egypt December Capacity Development for.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Structure of the presentation The origins of CDM What is the CDM? Players of CDM.
Clean Development Mechanism The Dutch Approach Reginald Hernaus Ministry of Housing, Spatial Planning and the Environment.
Markets & Mechanisms Developments inside and outside the UNFCCC negotiations. Building and Urban Methodologies Workshop UNFCCC, Bonn, March 2014.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
1 RENA: how it could help to address environmental challenges RENA: how it could help to address environmental challenges ALBANIA 11 th REReP Task Force.
Building Bridges Presentation of The Regional Environmental Center for Central and Eastern Europe Marta Szigeti Bonifert Executive Director.
The Adriatic Sea Partnership: A pilot program for the Mediterranean “Extraordinary Meeting of MAP Focal Points” Side Event Catania, Italy 7 November 2006.
Integrating Carbon Finance into the Bank’s Work PCF project cycle.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Preparation and review of the Project 1. Project ideas reviewed by PCF 2. PCN prepared by project sponsor 3. Host country endorsement sought 4. Further.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Sellers’ strategies regarding Joint Implementation Company Perspective
Spanish Policy on flexible mechanisms
JISC – work accomplished and challenges ahead
Role of Parties involved in JI-projects: Sweden
Example(s) of JI Track 1 procedures
Cambodia National Work Plan
UNFCCC Technical Workshop on Joint Implementation
Dr. Popi KONIDARI Research Fellow of KEPA Prof. Dimitrios MAVRAKIS
(Financed by the Italian Ministry of Foreign Affairs - Law 84)
Joint Implementation A Parties and Buyers Perspective
The various tracks of JI…
REReP regional meeting on “Energy and climate” in South Eastern Europe
European Commission High Level Group
The Austrian JI/CDM Programme Status, Experience, Outlook
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Small-Scale Projects Under JI
JISC from COP/MOP 1 to COP/MOP 2 UNFCCC Technical Workshop on JI
Carbon Finance at EBRD: IGOs’ perspectives
REReP regional meeting on “Energy and climate” in South Eastern Europe
Joint implementation and eligibility requirements
Possibilities for promoting environmental protection projects
Development of determination and verification manual (DVM)
Joint implementation programmes of activities (JI PoA)
Work Accomplished by JISC
Presentation transcript:

Italian policies and programmes on JI Claudia Croce UNFCCC JI Technical Workshop 13 - 14th February 2007, Bonn Ministry for the Environment, Land and Sea of Italy Department for Environmental Research and Development

Use of the flexible mechanisms in Italy According to the new political programme, the Italian Government is planning to utilise the flexible mechanisms (CDM and JI) up to a cap of 20% of the overall reduction target This amounts to 19 MtCO2eq/yr in the five years of the 1st commitment period of the Kyoto Protocol (2008-2012)

Commitment and Actions of IMoE €150 M actual capitalization. Italian private sector involved. 1st tranche closed on June, 30 2006. € 2.0 € 150 M € 18.8 M

Italian Carbon Fund concept Purchase fund, operational as for March 2004. First tranche closed on June, 30, 2006. Investment phase ongoing Purchase of project-based emission reductions (ERs) Purchase period initially up to 2012 (with option to extend) Payment on delivery on the basis of a long-term contract (pre-financing possible in individual cases) Distribution of credits “pro quota” to fund’s participants (Italian public and private entities)

ICF project selection No specific limitations as for project types but exclusions of (in line with the KP): Nuclear power projects Large hydro power projects Project size: generally no limitations but transaction costs! Generally no regional limitations No more than 50% of the total capitalisation in one country Preference to projects in China, LAC, Mediterranean region and Central-Eastern Europe

IMoE major cooperation programmes The Sino Italian cooperation programme (China) The Central-Eastern Europe Task Force: Serbia & Montenegro, Croatia, Bosnia & Herzegovina, Albania, Macedonia, Romania, Bulgaria and Ukraine The Mediterranean cooperation: - The MEDREP initiative - Algeria, Egypt, Israel, Morocco and Tunisia The LAC cooperation: - Brazil, Argentina, Belize, Cuba, Mexico, Panama, Uruguay

IMoE JI Cooperation programme National JI Focal Point appointed in Nov. 2006 JI Guidelines and Procedures drafted and internally approved MoU signed with Romania in Dec. 2006. Implementation phase starting next week. MoU with Ukraine under Government ratification MoU with Bulgaria under negotiation Interest for Green Investment Scheme under discussion at the political level

Italian JI Guidelines and Procedures Director General of the IMoE has been appointed as the Designated Focal Point (DFP) The Italian DFP only issues Letters of Approval for Italian individuals and/or legal entities either domiciled  on  the  Italian territory   or  legally established there The Government of Italy is not currently approving JI projects implemented in Italy

Italian JI Guidelines and Procedures (cont.) Two different scenarios may occur: Italy is not the Host Party (non HP) and the Host Party has chosen the verification procedure under Track 1 Italy is not the Host Party (non HP) and the Host Party has chosen the verification procedure under Track 2

Requirements A self-certification by the Project Participant stating that: participation in the given project activity meets the requirements imposed on such participation under the terms of the Kyoto Protocol and the JI Guidelines participation in the given project activity meets the criteria prescribed in the Guidelines by the World Commission on Dams (in case of large hydro projects only) (only for Host Party that has already signed the Treaty of Accession) the acquis communitaire has been taken into account in the definition of project baseline 2. Communication to the Italian Designated Focal Point of the web site where the project information has been posted

Additional requirements in case of Track 1 verification procedure A copy of the Letter of Approval from the Host Country’s Designated Focal Point A copy of the Project Design Document (PDD)

Additional requirements in case of Track 2 verification procedure A copy of the Letter of Approval from the Host Country’s Designated Focal Point A copy of the Project Design Document (PDD) A copy of a pre-verification report by the Accredited Independent Entity as to be sent to the JISC No fees required for the issuance of the LoA

Thank you! www.minambiente.it www.italiancarbonfund.org www.carbonfinance.org