Proposed C13 MERIT SYSTEM Steve Jetter/Abdul Cassim

Slides:



Advertisements
Similar presentations
Fundamentals and Best Practices for outcomes and success.
Advertisements

Statistical Evaluation of Dissolution for Specification Setting and Stability Studies Fasheng Li Associate Director, Pharmaceutical Statistics Worldwide.
Multilayer Perceptrons 1. Overview  Recap of neural network theory  The multi-layered perceptron  Back-propagation  Introduction to training  Uses.
Request for Proposal - Best Value Generally RFP’s are created for large dollar technical purchases, services and consultants.  Consideration in addition.
Statistics Versus Parameters
1 Plots and LSMEANS by parameter: Original data & Lab Adjusted data Elisa Santos November 7 th, 2005.
#PhUSE Standard Scripts Project Proposal for Qualification of Standard Scripts.
08/02/011 Statistical Summary of the Mack T10 Precision/BOI Matrix.
Analysis of the ISM Matrix Draft 3 November 5, 2004.
Summary of the Undergraduate and Postgraduate Standard Assessment Regulations Academic Year 2012/13.
Academic Regulations for Taught Programmes 2014/15 Stewart Smith-Langridge Annette Cooke Governance Services 5 November
Fluid technologies for a better world ™ M-11 EGR Oil Filter Pressure Delta Beaded Filter Correction Factor Jennifer Van Mullekom, Ph. D.
SGP Logic Model Provides a method that enables SGP data to contribute to performance evaluation when data are missing. The distribution of SGP data combined.
1 The Second Addition of LTMS (Theoretical Sneak Peak for the VG) VG SP: May 2010.
Revised ISM IAS Merit Calculation Proposal June 22, 2010 Pat Fetterman Steve Kennedy (discussed with Shawn Whitacre & Philpe Saad 6/21/10)
Grading and Analysis Report For Clinical Portfolio 1.
Working paper number WLTP-DHC Comparison of different European databases with respect to road category and time periods (on peak, off peak, weekend)
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Summary of Standard Assessment Regulations Academic Year 2013/14.
JACTest Monitoring Center Test Monitoring Center Report to the Mack Test Surveillance Panel June 17, 2002 Montreal.
ISM Test Development Task Force Report June 21, 2004.
External Examiner Induction Academic Regulations for Taught Programmes 2015/16 Annette Cooke/Alison Jones Quality and Enhancement Office 4 November 2015.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Slide 1 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Program Field Follow data Test Criteria Test Matrix Results.
Mack T12 Piston Distress October 11, CMIR piston 4 CMIR piston 5 TRWL = 101mg TRWL = 31 mg.
Every Student Succeeds Act (ESSA) Accountability
Test Monitoring Center Report to the Mack Test Surveillance Panel
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Measures of dispersion
WECC Regional Standards Update
CPU Scheduling Algorithms
Caterpillar C13 Matrix Data Analysis
Request for Proposal - Best Value
Caterpillar C13 Test Matrix Update
Punch items for LTMS Version 2 Surveillance Panel Consideration
Chapter 6: CPU Scheduling
Chapter 6: CPU Scheduling
Module 5: CPU Scheduling
Request for Proposal - Best Value
An in-depth analysis of applying engineering education to a professional environment. Reagan Hughes, Courtney McCreary, Aldo Perez, Christopher.
LDZ System Charges – Structure Methodology 26 July 2010
3: CPU Scheduling Basic Concepts Scheduling Criteria
Chapter5: CPU Scheduling
COP pass/fail decisions
LUCAS 2009/2012 results Optimising comparability and Quality Reports Item 4.1 Working Group for Land Cover and Land Use Statistics Bech.
LUCAS SURVEYS 2009/2012: Optimising comparability
Using statistics to evaluate your test Gerard Seinhorst
Chapter 6: CPU Scheduling
Group Member Evaluation Form
Lecture 2 Part 3 CPU Scheduling
Quality Criteria Final Criteria.
Quality Criteria Near Final.
Operating System , Fall 2000 EA101 W 9:00-10:00 F 9:00-11:00
Chapter 6: CPU Scheduling
Ag.no.17 A65 Method Manual: Reference period for remuneration data
Module 5: CPU Scheduling
Proposed actions for gtr development
PROPOSED CHANGES TO RATING METHODS
Chapter 6: CPU Scheduling
RESOLUTION OF GENERIC SAFETY ISSUE 191
Grading criteria master thesis
CPU Scheduling: Basic Concepts
Module 5: CPU Scheduling
A handbook on validation methodology. Metrics.
  Using the RUMM2030 outputs as feedback on learner performance in Communication in English for Adult learners Nthabeleng Lepota 13th SAAEA Conference.
IWG Worn tyres Tyre Industry work status July 17th 2019
IWG Worn tyres Tyre Industry work status July 17th 2019
IWG Worn tyres Tyre Industry work status July 17th 2019
Presentation transcript:

Proposed C13 MERIT SYSTEM Steve Jetter/Abdul Cassim Presented to C13 SP Steve Jetter/Abdul Cassim Dec 5, 2005 Norfolk, Va

Current Parameters in Calculation Parameters are those which were included in the motion the SP passed regarding readiness of the C13 test for PC-10 The following pass/fail parameters included in system Oil Consumption Delta Top Land Carbon Top Groove Carbon 2nd Ring Top Carbon No Hot Stuck Rings needs to be a separate pass/fail due to on/off nature Piston, Ring, or Liner distress to make test non-interpretable (validity criterion)

Limits and Weightings Current proposal differs from 10-10-05 proposal based on feedback CAT has received on original draft merit system Proposed limits determined by following criteria Merit System should provide clear separation of Oil A and Oil D/PC-10G as Failing and Passing oils Anchor Limits: Set at levels that Caterpillar desires for acceptable oil performance based on analysis of matrix data Cap Limits: Set at maximum level that Caterpillar is willing to accept for that individual parameter vs. previous system that set at the 3-test limits (Caps now at 1 to 2 sdev) Max Merit Limits: Set at level consistent with best performance observed in the Matrix data for the parameter Weightings set to emphasis the parameters that showed the most discrimination and are most critical to Caterpillar

Proposed Merit System Original proposal Initial proposal with new parameters 2RTC parameter limits…

2RTC Parameter Limits Caterpillar’s initial proposal for limits based on the following Heavy Carbon on 2RTC is not desirable Cap: Set to exclude heavy carbon on a test with all six rings having 100% carbon (no varnish). Will allow some amount of heavy carbon on single/multiple rings if not 100% carbon ratings Anchor: Set near max value seen in matrix for oil PC-10G (max of PC-10G was 17.25) Max Merit: Set at level consistent with best performance observed in the Matrix data for the parameter (7.0) 2RTC is smallest overall contributor (15%) to overall Merit. Based on feedback received during various discussions with concerned parties, Caterpillar understands that there is concern over this parameter and a more conservative approach to limit setting may be needed to gain acceptance

2RTC Parameter Limits Concerns with 2RTC parameter Matrix data not all generated with same methodology Some did not rate heavy carbon Some rated chamfers and some did not Some rated “polished” carbon as light carbon since it did not have any depth SP has agreed a final rating method and are in the process of comparing “matrix methods” to “final method” via a round robin ring rating In general, expected that above items will lead to higher ratings with final method when heavy carbon is present Caterpillar want to ensure that limits Exclude very poor oils (PC-10F, PC-10C) Based on statistics of current data (final method should improve consistency of results)

2RTC Parameter Limits Caterpillar’s revised proposal for limits based on the following Cap: Set to exclude poor oils (PC-10F & PC-10C) but allow other matrix oils to pass parameter Anchor: Set at 2 sdev below the Cap (~10 lower) Max Merit: Set at level consistent with best performance observed in the Matrix data for the parameter Based on review of data, the following values were determined by Caterpillar Cap: 30 Anchor: 20 Max Merits: 5

Final Proposed Merit System Following merit system currently planned for presentation to class panel for exit ballot…

Final Proposed Merit System – Matix Data