FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM

Slides:



Advertisements
Similar presentations
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
Advertisements

Weather Information Exchange Model - WXXM -
System Wide Information Management
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
The European Organisation for the Safety of Air Navigation AIRM Review Forum AIRM Status Report.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
FIXM Breakout Introduction
The European Organisation for the Safety of Air Navigation WXXM, December 2012 Dennis Hart Senior Aviation Meteorology Expert EUROCONTROL
ICAO: Global Harmonization Plan
Information Management Panel Update
Information Management The ICAO Perspective
Delivering Digital Services International Collaboration - Towards the 4DT for FF-ICE Step 1 Presented By: Dr. Stéphane Mondoloni Date:August 27, 2014.
Status Report WXXM Delivering Digital Services Presented By:
Sam Van der Stricht Eurocontrol
Delivering Digital Services FIXM - Flight Information Exchange Model Presented By: Rob Hunt Manager, FAA, Air Traffic Organization, Technical Analysis.
Delivering Digital Services SESAR AIRM Status Report Presented By: Hubert LEPORI EUROCONTROL Date:August 26, 2014.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
FAA International Activities
Integrating information towards Digital ATM Mini Global Demonstration Presented By: Thien Ngo Date:August 28, 2013.
Integrating information towards Digital ATM FIXM – Flight Information Exchange Model Presented By: Richard Jehlen Director, FAA, Air Traffic Organization,
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
The European Organisation for the Safety of Air Navigation Focus Area: Meteorology “What Scott promised” The CRs from MET AIRM Review Forum – 12-Sept-2011.
Integrating information towards Digital ATM FAA/SESAR Coordination on Data Modelling Presented By: Paul Jackson Date:August 27, 2013.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
The European Organisation for the Safety of Air Navigation OGC Aviation DWG - Bonn Hubert LEPORI EUROCONTROL – DSR/CMN/IM 01-March-2011.
AIXM - purpose, scope, implementation and future evolution.
The European Organisation for the Safety of Air Navigation AIXM 5.1 Seminar Introduction.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
How the NextGen Florida Test Bed could enable integration of Domestic and International Space Traffic airspace.
Aviation System Block Upgrades and NAV CANADA Planning
AIS-AIMSG/12 Briefing to ANC 23 October 2015
Collaborative Decision Making (CDM) Saulo Da Silva
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
System Wide Information Management
5-7 DEC 2016, EUROCONTROL HQ, Brussels
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
AIXM 5.1 – Interoperability issues
Workshop on preparations for ANConf/12 − ASBU methodology
FIXM – What’s it all about?
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Messaging support FIXM 4.0 Guidance Materials
Mini Global Demonstration
FIXM – GUFI Manfred Beckmann (SOLITEC)
SIP/2012/ASBU/Nairobi-WP/7
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
ANConf/12 – Agenda H. Sudarshan
AIXM CCB meeting EUROCONTROL HQ, Brussels
Flight and Flow Information for a Collaborative Environment (FF-ICE)
ANConf/12 – Agenda H. Sudarshan
AIXM 5 Development Status
Presented by Eduard Porosnicu, EUROCONTROL
AIXM CCB meeting EUROCONTROL HQ, Brussels
AIXM 5.2 – WIP AIXM CCB – Webex 26 July 2018.
AIM Global Strategy Air Navigation Procedures for AIM Seminar
P. Cruellas EUROCONTROL DSR SWIM/EA Unit
AIXM 5.1 – Interoperability issues
Block 1 Overview Rubén Oscar González Air Navigation Commissioner
30 NOV – 01 DEC 2017, Eurocontrol, Brussels
ICAO AIRM briefing for the AIXM CCB Scott WILSON
Presentation transcript:

FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM 05-Dec-2016

Content Part 1: FIXM overview Part 2: FIXM talking points for the AIXM CCB FIXM briefing

Part 1 FIXM overview FIXM briefing

What is FIXM? www.FIXM.aero FIXM Primer FIXM briefing

FF-ICE Concept (ICAO Doc 9965) Why FIXM? FF-ICE Concept (ICAO Doc 9965) 2020 The requirement for FIXM was identified by International Civil Aviation Organisation (ICAO) Air Traffic Management Requirements and Performance Panel (ATMRPP) and endorsed at the 12th Air Navigation Conference as part of the Aviation System Block Upgrades (ASBU) and as described in Flight and Flow Information for a Collaborative Environment (FF-ICE) . This concept is expected to form the basis for more detailed concepts developed by SESAR in Europe and Nextgen in the USA, and thus FIXM should be used by those programmes in any related work. FIXM will be used to define the payloads for data exchanges defined either through services or via more traditional message exchanges. As FIXM develops and matures it is expected that other users will adopt it on an opportunistic basis, and in the longer term regulation to support its implementation is not ruled out. FIXM briefing

FIXM evolution FIXM v1.0 FIXM v2.0 FIXM v3.0 FIXM v4.0 Aug 2012 Flight and Flow Management ICAO 2012 ATS ICAO 2012 AIDC messages TFM (Strategic) Airport CDM 4DT ICAO 2012 ATS ICAO 2012 AIDC messages TFM (Strategic) Airport CDM Surface data 4D Trajectories- Package 1 ICAO Provisions Global Applicability ICAO 2012 ATS 4D Trajectories- Package 2 Messaging Package FF-ICE/1 Compliant ICAO 2012 ATS – FPL message GUFI (Globally Unique Flight Identifier) FIXM briefing

Notes on FIXM v4.0.0 FIXM v4.0.0 supports: The content of the individual ATS message fields described in ICAO Doc 4444 The new flight data items identified by ICAO ATMRPP as part of the requirements for FF-ICE Block 1 (based on working paper ref. ATMRPP-WG/31-WP/713 “Manual on FF-ICE Implementation Guidance”). FIXM v4.0.0 content is entirely traced to ICAO information exchange requirements Some capabilities previously enabled by FIXM v3.0 are no longer supported. FIXM briefing

Next FIXM releases in support of FF-ICE/1 * FIXM 4.0: First operationally suitable version maturity Capture the evolving FF-ICE/1 requirements in FIXM core, and keep learning… Optimize FIXM based on implementers' feedback Progress on the implementation guidance so that FIXM is usable in support of FF-ICE/1 FIXM 4.0* Aug 2016 Scoping based on draft FF-ICE/1 FIXM ready for full FF-ICE/1 implementation Keep learning about FF-ICE/1 time FIXM briefing

Next FIXM releases in support of FF-ICE/1 This plan is still to be formally endorsed ATMRPP WG31 – Summary of discussions 3.1.21 […] amend the applicability date for FF-ICE to 2020. This implies that a fully coordinated and agreed product should be available by Oct/Nov 2018. The FIXM Release Plan will reflect the FIXM CCB vision, in line with ATMRPP plans * FIXM 4.0: First operationally suitable version maturity FIXM 5.0.0 FIXM 4.1.0 Mid 2019 FIXM 4.0* Aug 2016 End of 2017 Scoping based on draft FF-ICE/1 FIXM ready for full FF-ICE/1 implementation Keep learning about FF-ICE/1 time FIXM briefing

ICAO IMP ICAO ATMRPP FIXM CCB FIXM Governance Defines the FF-ICE IERs Decides what is globally applicable Supervises the FIXM development ICAO IMP ICAO ATMRPP ICAO AIRM, SWIM governance … FIXM CCB Governs the evolution of FIXM under ATMRPP supervision. FIXM briefing

FIXM CCB + ATMRPP supervision Extensions to FIXM FIXM CCB + ATMRPP supervision FIXM briefing

FIXM talking points for the AIXM CCB Part 2 FIXM talking points for the AIXM CCB FIXM briefing

(ATS) route designator FIXM v4.0.0 AIXM v5.1.1 FIXM briefing

Significant point FIXM v4.0.0 FIXM briefing

Some candidate FIXM v4.1.0 Change Requests Not yet discussed by FIXM CCB! CR - Unrestricted URI Referencing Enable the inclusion of XLink references (to AIXM data) in FIXM datasets <complexType abstract="true" name="SignificantPointType"> ... <attributeGroup ref="xlink:simpleAttrs"/> </complexType> CR - Make use of the GML Aviation Profile Or develop another profile… More candidate CRs in the OGC Testbed-12 FIXM GML Engineering Report FIXM briefing

AIXM and FIXM are different solutions for different business cases FIXM and AIXM have different technical designs This is normal! AIXM and FIXM are designed and optimized for their respective use cases! FIXM does not import a profile of AIXM Why should FIXM integrate and then misuse the AIXM temporality model, which is created for enabling Digital NOTAM exchanges? BUT FIXM is “mappable” to AIXM The next FIXM version might enable references to AIXM data using Xlink href Eventually, FIXM and AIXM should map to the ICAO AIRM FIXM briefing

Talking about the ICAO AIRM Slide presented during the ATMRPP/IMP joint session (Nov 2016) FIXM briefing

Talking about the ICAO AIRM Slide presented during the ATMRPP/IMP joint session (Nov 2016) FIXM briefing

FIXM briefing