Results of NTC Calculation Exercises on BSTP Regional Model

Slides:



Advertisements
Similar presentations
1 SETSO TF SETSO TF NACMPF SG Congestion Management and NTC.
Advertisements

Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Black Sea Regional Transmission Planning Project - renewables integration - By Predrag Mikša EKC - Electricity Coordinating Center Simferopol, June 2011.
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Purpose overview of the form and use of the AER’s augex tool Not
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
NETWORK ANALYSIS IN GIS ENVIRONMENT Uday Deshmukh North Delhi Power Limited.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Available Transfer Capability Determination Chen-Ching Liu and Guang Li University of Washington Third NSF Workshop on US-Africa Research and Education.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
CEE’07 - International Conference on Electrical Engineering Coimbra, 28 November Interchange Capacity between Portugal and Spain Methodology, Evolution.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
2nd GTE Conference Copenhagen, September 2004 Author:Milan Sedlacek SPP (Slovak Gas Industry) Slovak Republic GAS TRANSIT THROUGH A NEW EU MEMBER STATE.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Optimization for Operation of Power Systems with Performance Guarantee
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Midterm/Final Presentation Project Name Students: [Name1], [Name2] Supervisor: [SV Name] Context: Project [A/B/Special] Semester: Winter/Spring, Year Date:
SLED Electricity Modelling results – Serbia László Szabó, András Mezősi
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
ENTSO-E NET TRANSFER CAPACITY (NTC) CALCULATION METHODOLOGIES
Company introduction Please introduce your company shortly (industrial focus) Contact point for this idea: [name + organisation+ mail address] 1.
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
GRI SSE Work Plan Project proposal of HEA
Agenda TSOG 8th November
Congestion Management
L. Radulov, A. Nikolaev Black Sea Regional Energy Centre
3rd International Scientific Conference on "Energy and Climate Change"
GRI SSE Work Plan Project proposal of HEA
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
Advanced allocation starts with us!
SLED Electricity Modelling results – Serbia
HUM 102 Report Writing Skills
The Wine Culture Tourism Exchange (WCTE)
Perfect Competition in the Long-run
ERGEG GRI South South East – , Maribor
ECEN 460 Power System Operation and Control
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Björn Felten, Tim Felling, Christoph Weber
PSAST TCRM Script Structure
Local Area Planning Update to TRANSAC – March 15, 2017
GRI SSE Work Plan Project proposal of HEA
GRI SSE Work Plan Project proposal of HEA
Your gon’na need to know it eventually.
ECEN 460 Power System Operation and Control
GRI SSE Work Plan Project proposal of HEA
A Model of Power Transmission Disturbances in Simple Systems
A-6 Limits on amount of exchange or sharing of RR between Synchronous Areas according to Article 118(aa) SOGL.
Eurostat pension visits to Member States – Major issues
Special MRC – Fuel Security
Networking Together in the Future
Sharing What We Know: Strengthening Implementer Capacity
Dimensions of Data Quality
Technical and administrative support for the joint implementation of the MSFD in Bulgaria and Romania - Phase 3 Draft Final Report   Specific contract.
IAEA RER/9/141: Improving National Infrastructure for Safety   Regional Workshop: Drafting School for Regulations. Radiation Safety Stream Country IAEA.
KAVA activity – [Short Title Idea]
GRI SSE Work Plan Project proposal of HEA
Software Analysis Tools
<Your Team # > Your Team Name Here
IAEA RER/9/141: Improving National Infrastructure for Safety   Regional Workshop on Regulatory Enforcement and Inspection Vilnius, Lithuania 11 September.
Projects of Common Interest
KAVA activity – [Short Title Idea]
Author: Italo Fernandes
Midterm/Final Presentation Project Name
Projects of Common Interest
Presentation transcript:

Results of NTC Calculation Exercises on BSTP Regional Model Energy Technology and Governance Program Black Sea Transmission System Planning Project (BSTP) Results of NTC Calculation Exercises on BSTP Regional Model xxxxx, 2017 Xxxxx, Xxxxx This presentation is made possible by the support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of the United States Energy Association and do not necessarily reflect the views of USAID or the United States Government.

Results of NTC Calculation Exercises on BSTP Regional Model [please enter considered border] LOGO TSO, COUNTRY Authors: Name and Surname, Organization

Contents Introduction NTC Calculation Prerequisites: Base Case Exchange (BCE) and Notified Transmission Flows (NTF) Transmission Reliability Margin (TRM) Already Allocated Capacity (AAC) Generation Shift Keys (GSK) NTC Calculation Procedure: Algorithm Creation of Auxiliary Files for Calculation (MON, CON, SUB) Static and Dynamic Security Calculations NTC Calculation Results Conclusions 3 3

Introduction Short description of the NTC calculation scenario i.e. observed border between two areas, in one or two slides (list of active tie-lines given by voltage levels? single line diagram of bordering substations with observed tie-lines? position in the systems with geographical scope?) Xxxxx 4 4

NTC Calculation Prerequisites: BCE&NTF Explanation of assumed Base Case Exchange programs (BCE) between two areas for observed regimes and their physical cross-border flows – Notified Transmission Flow (NTF) (why these amounts? why these directions?) Xxxxx 5 5

NTC Calculation Prerequisites: TRM Explanation of assumed value for Transmission Reliability Margin (TRM) (if any? if exists, why this value? which kind of uncertainties are included there?) Xxxxx 6 6

NTC Calculation Prerequisites: AAC Explanation of Already Allocated Capacity (AAC) if exists at observed border (if exists, why this value? which kind of already allocated transmission rights are included there?) Xxxxx 7 7

NTC Calculation Prerequisites: GSK Explanation of applied Generation Shift Keys (GSK) in both areas in one or two slides (why this type of shift keys? list of generation units which are engaged? what are the possible limits in generation shifting in both directions (in case of power increasing and power decreasing)? what is the solution in case of exceeded power limit?) Xxxxx 8 8

NTC Calculation Procedure: Algorithm Short description of applied NTC calculation procedure in one or two slides (with algorithm chart) taking into account local specifics and necessary assumptions (do you perform usually any kind of capacity calculation and capacity allocation in your practice? if yes, which kind of standard procedure is usually applied in capacity calculation? do you have some expected loop flows?) Xxxxx 9 9

NTC Calculation Procedure: MON, CON, SUB Short description of applied auxiliary files for calculation (MON, CON, SUB) (explain list of observed critical branches and critical outages in considered TSOs? what are the specific loading limits applied within the calculation process?) Xxxxx 10 10

NTC Calculation Procedure: Static and Dynamic Security Calculations Explanation of achieved static/dynamic security limits within the calculation process for each observed regime and each considered direction (if dynamic security limits exist, please stress critical elements and critical contingencies? explain them?) Xxxxx 11 11

NTC Calculation Results Table with calculation results for observed border and observed regimes (please see an example below) Xxxxx

Conclusions Summary of the results. General observation and comments concerning differences between regimes and directions Xxxxx 13 13

Questions and Discussion

Proposal for Homework Scenarios BSTP Member Border Regime Direction Armenia AM-GE 2020 year Winter Maximum Summer Minimum Both Bulgaria BG-RO Georgia GE-TR Moldova MD-UA Romania RO-MD Turkey TR-BG Ukraine UA-RO 15 15