Proton Driver Scenarios at RAL and CERN

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

ISIS Accelerator Division
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
2nd EuroNu Plenary Meeting Review of CERN Proton Driver bunch compression studies 02/06/2010M.M. - EUROnu1.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Parameters of 2 nd SPL feasibility study A.M.Lombardi (reporting for the working group)
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
LAGUNA meeting September , 2010 CAES – CNRS – Aussois - FRANCE Prospective Proton Drivers for neutrino facilities at CERN 8/09/2010 R. Garoby.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
MW Upgrades for the ISIS Facility John Thomason. OptionCommentsBeam Power (MW) Neutron Yield 1(a)Add 180 MeV LinacTechnical Issues~ (b)Add 800.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
8-10 January Paris Diderot University High Power Protons Drivers for Beams in Europe R. Garoby [using material from M. Dracos (CNRS), T. Ekelof.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
Proton Driver Developments and the Neutrino Factory Christopher R Prior ASTeC Intense Beams Group STFC Rutherford Appleton Laboratory, U.K.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
UK Neutrino Factory Conceptual Design
ISIS Accelerator Division
Plans for a Superconducting Proton Linac at CERN
Towards a Common Proton Driver for a Neutrino Factory
Linac4 M. Vretenar for the Linac4 design team
The Accelerator Complex from the International Design Study
Alternative/complementary Possibilities
Alternative/complementary Possibilities
Other Scenarios for a partial Upgrade of the Injector Complex C
Plans for a Superconducting Proton Linac at CERN
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Proton Drivers Leo jenner – Joint Fermi / Imperial
Superbeams with SPL at CERN
Plans for new LHC injectors R. Garoby
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
A Design Study of a Compressor ring for
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Proton Driver Scenarios at RAL and CERN John Thomason Synchrotron Group Leader ISIS Accelerator Division

Revised Neutrino Factory Design

High Power Proton Driver Supply protons to target to produce pions Proton kinetic energy 5 – 15 GeV Basic specifications: 4 MW proton beam power RMS bunch length 1 – 3 ns 50 Hz repetition rate Three bunches, extracted > 80 µs apart

Green Field Solution

Proton Driver for a Neutrino Factory Chris Prior, Grahame Rees, Shinji Machida ( ) Proton Driver for a Neutrino Factory Lower injection energies provide smaller bucket area in the ring and the small longitudinal emittance needed for final ns bunch compression. Studies show that 180 MeV is a realistic energy for NF Separate main ring with optics chosen for ns bunch compression. Could be FFAG (cheaper but insufficiently developed) or a synchrotron (reliable, tried and tested) 10 GeV RCS Special achromat for collimation (longitudinal and transverse) and momentum ramping for injection Compressed bunches need to be held and sent to target at intervals of ~100 μs. Possible in FFAG and also synchrotron with flat top Separate booster ring designed for low loss phase space painting for beam injection and accumulation. Synchrotron moving buckets give flexibility to capture all of the injected beam

ISIS Upgrade + NF Solution

ISIS Synchrotron Group and (amongst others) I S K Gardner, Y Irie3, S J S Jago, L J Jenner4, A P Letchford, J Pasternak2, D C Plostinar1, C R Prior1, G H Rees1 ISIS and 1ASTeC, Rutherford Appleton Laboratory, UK 2ISIS and Imperial College, London, UK 3KEK and J-PARC, Japan 4Imerpial College and Fermilab

ISIS Upgrades Present operations for two target stations Operational Intensities: 220 – 230 μA (185 kW) Experimental Intensities of 31013 ppp (equiv. 240 μA) DHRF operating well: High Intensity & Low Loss Now looking at overall high intensity optimisation Study ISIS upgrade scenarios 0) Linac and TS1 refurbishment 1) Linac upgrade leading to ~0.5 MW operations on TS1 Overlap with NF proton driver 2) ~3.3 GeV booster synchrotron: MW Target 3) 800 MeV direct injections to booster synchrotron: 2 – 5 MW Target 4) Upgrade 3) + long pulse mode option

ISIS MW Upgrade Scenarios 1) Replace ISIS linac with a new ≈ 180 MeV linac (≈ 0.5MW) 2) Based on a ≈ 3.3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW, perhaps more) 3) RCS design also accommodates multi-turn charge exchange injection to facilitate a further upgrade path where the RCS is fed directly from an 800 MeV linac (2 – 5 MW)

1) Injection Upgrade Study

ISIS MW Upgrade Scenarios 1) Replace ISIS linac with a new ≈ 180 MeV linac (≈ 0.5MW) 2) Based on a ≈ 3.3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW, perhaps more) 3) RCS design also accommodates multi-turn charge exchange injection to facilitate a further upgrade path where the RCS is fed directly from an 800 MeV linac (2 – 5 MW)

Possible ≈ 3.3 GeV RCS Rings

Bucket-to-Bucket Transfer

5SP RCS Ring Energy 0.8 – 3.2 GeV Rep Rate 50 Hz C, R/R0 367.6 m, 9/4 Gamma-T 7.2 h 9 frf sweep 6.1-7.1 MHz Peak Vrf ≈ 750 kV Peak Ksc ≈ 0.1 εl per bunch ≈ 1.5 eV s B[t] sinusoidal

ISIS MW Upgrade Scenarios 1) Replace ISIS linac with a new ≈ 180 MeV linac (≈ 0.5MW) 2) Based on a ≈ 3.3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW, perhaps more) 3) RCS design also accommodates multi-turn charge exchange injection to facilitate a further upgrade path where the RCS is fed directly from an 800 MeV linac (2 – 5 MW)

Accelerating Structures DTL/SC Elliptical Cavities Frequency Grahame Rees, Ciprian Plostinar ( ) 800 MeV, Hˉ Linac Design Parameters Ion Species H- Output Energy 800 MeV Accelerating Structures DTL/SC Elliptical Cavities Frequency 324/648 MHz Beam Current 43 mA Repetition Rate 30 Hz (Upgradeable to 50 ) Pulse Length 0.75 ms Duty Cycle 2.25 % Average Beam Power 0.5 MW Total Linac Length 243 m

Design Options

Common Proton Driver for the Neutron Source and the Neutrino Factory Based on MW ISIS upgrade with 800 MeV Linac and 3.2 (≈ 3.3) GeV RCS Assumes a sharing of the beam power at 3.2 GeV between the two facilities Both facilities can have the same ion source, RFQ, chopper, linac, H− injection, accumulation and acceleration to 3.2 GeV Requires additional RCS machine in order to meet the power and energy needs of the Neutrino Factory Options for the bunch compression to 1 – 3 ns RMS bunch length: - adiabatic compression in the RCS - ‘fast phase rotation’ in the RCS - ‘fast phase rotation’ in a dedicated compressor ring

Summary of Assumptions for the Common Proton Driver Bunches will be transfered from the booster RCS at ≈ 3.2 GeV, 50 Hz Assume 4 – 5 MW from booster RCS, and 4MW required from NF proton driver : 3 bunches, 3.91013 protons/bunch, 4.3 GeV 2 MW to ISIS NF ISIS 5 MW 2 bunches, 3.91013 protons/bunch, 6.4 GeV 3 MW to ISIS 3 bunches, 2.21013 protons/bunch, 7.7 GeV 3⅓ MW to ISIS 3 bunches, 1.761013 protons/bunch, 9.6 GeV 2⅔ MW to ISIS 4 MW

Preliminary design of the second RCS Jaroslaw Pasternak, Leo Jenner ( , , ) Parameters of 3.2 – 9.6 GeV RCS Number of superperiods 6 Circumference 694.352 m Harmonic number 17 RF frequency 7.149 – 7.311 MHz Gamma transition 13.37 Beam power at 9.6 GeV 4 MW for 3 bunches Injection energy 3.2 GeV Extraction energy 9.6 GeV Peak RF voltage per turn ≈ 3.7 MW Repetition rate 50 Hz Max B field in dipoles 1.2 T Length of long drift 14 m Present-day, cost-effective RCS technology Only three quadrupole families Allows a flexible choice of gamma transition Up to 3.7 MV/turn?

Adiabatic Bunch Compression Initial Mid-point Final Φ (degrees) ΔE (MeV) Preliminary longitudinal simulations using ESME code 3.2 → 9.6 GeV acceleration 26.6 → 2.52 ns (rms) bunch compression Up to 3.7 MV/turn No consideration yet given to beam transport to target In order to obtain more realistic simulation results the longitudinal ring impedance needs to be estimated and input into ESME, and to simulate a realistic beam the simulation must be run with a larger number of macroparticles 0 2 4 6 8 10 time (ms) 0 1 2 3 4 RF (MV/turn)

Necessary Hardware R&D High power front end (FETS) RF Systems Stripping Foils Diagnostics Targets Kickers etc. To realise ISIS MW upgrades, NF and generic high power proton driver development, common hardware R&D will be necessary in key areas: In the neutron factory context SNS and J-PARC are currently dealing with many of these issues during facility commissioning and we have a watching brief for all of these Active programmes in some specific areas

NF on Harwell Oxford Site decay ring to Norsaq ~10° into ground RLA 2 RLA 1 muon linac cooling phase rotation bunching

SPL-Based NF Proton Driver

Roland Garoby, Simone Gilardoni, Gersende Prior, Frank Gerigk Information from (amongst others) Roland Garoby, Simone Gilardoni, Gersende Prior, Frank Gerigk

Main requirements of PS2 on its injector: LP-SPL: Low Power-Superconducting Proton Linac (4 GeV) Back-up PSB SPS Linac4 LP-SPL PS LHC / sLHC Output energy 160 MeV 1.4 GeV 4 GeV 26 GeV 50 GeV 450 GeV 7 TeV Linac2 50 MeV Proton flux / Beam power PS2 Present 2.0 GeV LIU (2019) HP-SPL: Upgrade of infrastructure (cooling water, electricity, cryogenics etc.) Replacement of klystron power supplies Addition of 5 high b cryomodules to accelerate up to 5 GeV Main requirements of PS2 on its injector: Requirement Parameter Value 2.2 x ultimate brightness with nominal emittances Injection energy 4 GeV Nb. of protons / cycle for LHC (180 bunches) 6.7 × 1013 Single pulse filling of SPS for fixed target physics Nb. of protons / cycle for SPS fixed target 1.1 × 1014

SPL-Based NF Proton Driver: Principle Accumulation of beam from the High Power SPL in a fixed energy Accumulator (5 GeV, 4MW beam power). Bunch compression («rotation») in a separate Compressor ring

HP-SPL: Main Characteristics Required for low loss in accumulator Ion species H− Output Energy 5 GeV Bunch Frequency 352.2 MHz Repetition Rate 50 Hz High speed chopper < 2 ns (rise & fall times) Required for muon production Required for flexibility and low loss in accumulator Option 1 Option 2 Energy (GeV) 2.5 or 5 2.5 and 5 Beam power (MW) 2.25 MW (2.5 GeV) or 4.5 MW (5 GeV) 5 MW (2.5 GeV) and 4 MW (5 GeV) Protons/pulse (x 1014) 1.1 2 (2.5 GeV) + 1 (5 GeV) Av. Pulse current (mA) 20 40 Pulse duration (ms) 0.9 1 (2.5 GeV) + 0.4 (5 GeV) 2 ´ beam current Þ 2 ´ nb. of klystrons etc .

To HP-PS and/or Accumulator HP-SPL: Block Diagram 0 m 0.16 GeV 110 m 0.73 GeV 291 m 2.5 GeV 500 m 5 GeV Medium b cryomodule High b cryomodules High b cryomodules Debunchers From Linac4 Ejection To HP-PS and/or Accumulator 9 x 6 b=0.65 cavities 11 x 8 b=1 cavities 13 x 8 b=1 cavities EURISOL to Segmented cryogenics / separate cryo-line / room temperature quadrupoles: Medium b (0.65) – 3 cavities / cryomodule High b (1) – 8 cavities / cryomodule Low energy Intermediate energy High energy

HP-SPL: R&D Objective Design, construction and test of a string of 4 b=1 cavities equipped with main couplers & tuners inside a “short” prototype cryo-module before the end of 2014 tested in 2014. Cryomodule (CERN – CNRS)

HP-SPL: Cavity & Cryomodule Design SPL b = 1 cavity + helium tank + tuner + main coupler Bulk niobium cavities (CERN) HOM coupler (CERN – Uni Rostock) Helium tank (CERN – CEA) Tuner (CEA) Main coupler (CERN)

Accumulator/compressor lattices from M. Aiba Collective effect related limitations have also been studied

HP-SPL: Cost Estimate (1/3/12) 806.9 MCHF without contingency

NF on CERN Site Other potential neutrino physics sources at CERN To Pyhäsalmi Transfer line SPS → Target Target 0.75 – 2MW Near detector Other potential neutrino physics sources at CERN Super-beam: LAGUNA-LBNO SPS (750 kW) HP-PS LAGUNA-LBNO HP-PS (2 MW) Beta-beam: EURISOL (200kW) To EURISOL