MicroTCA Development and Status

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
6/2/2015EIFast Workshop Hamburg, May A Klystron Interlock for the XFEL RF Stations Holger Leich DESY Hamburg and Zeuthen  Joint project: DESY Hamburg.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
The planned new system Tom Himel Dec 1, Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of.
Global accelerator TTF Raimund Kammering DESY MVP TTF2 Review Meeting at Salzau, January 2003.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Synchronous Device Interface at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
The Machine Protection System for the European XFEL E. Castro on behalf of the MPS team
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
6-10 Oct 2002GREX 2002, Pisa D. Verkindt, LAPP 1 Virgo Data Acquisition D. Verkindt, LAPP DAQ Purpose DAQ Architecture Data Acquisition examples Connection.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Kay Rehlich xTCA RT2012 MicroTCA.4 Timing Distribution and Power Supply Issues.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser DESY Status and Possible Controls Contributions to the ILC Kay Rehlich.
LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
LCLS MD Downtime William Colocho June 2014 to June 2016.
ESS LLRF and Beam Interaction
DAQ and TTC Integration For MicroTCA in CMS
SLAC I&C Division / EE Department
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
E-XFEL Status and First Beam Results
Overview and System Design for ESS LLRF Systems
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
LLRF systems status update
New xTCA Developments at SLAC
Hosting Orsay Walid KAABI
MicroTCA.4 based data acquisition system for KSTAR Tokamak
Automation and Feedbacks
WP02 PRR: Master Oscillator and RF Reference Distribution
MicroTCA Common Platform For CMS Working Group
Racks Coordination 09 September 2011 E. Negodin
WP02 PRR: Master Oscillator and RF Reference Distribution
Racks Coordination 16 September 2011 E. Negodin
High speed LWL connections for WP02
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Functionality Stefan Simrock How to edit the title slide
WP Coordinaten XFEL RF Operation
WP02 PRR: Master Oscillator and RF Reference Distribution
Front-end for BAMs Samer Bou Habib How to edit the title slide
Photon beamline crates
Markus Hüning 3rd XFEL Collaboration Meeting
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LLRF and Beam-based Longitudinal Feedback Readiness
Advanced Research Electron Accelerator Laboratory
Modified Beam Parameter Range
LCLS Control System Personnel Linac & BC2 Controls progress
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

MicroTCA Development and Status Kay Rehlich DESY Real Time Conference 2016 June 9 2016 How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row.

Motivation and Outline 1993 2016 FLASH + FLASH 2 1.6 km cold accelerator XFEL start The used standard Architecture Hardware Software Kay Rehlich, DESY June 6 2016, Real Time Conference

From VME to MicroTCA Since 1993 Most cables from rear Interne Clock & Trigger distribution Redundant fans Redundant power supply optional Modern, high-speed data transfer Excellent signal quality Since 1993 Kay Rehlich, DESY June 6 2016, Real Time Conference

PICMG Standards “Telecom Computing Architecture” Single Double AMC.0 MTCA.0 MTCA.4 > 150 Mitglieder Kay Rehlich, DESY June 6 2016, Real Time Conference

MicroTCA.4: Compact and Modular Design Cables from rear side Space for …. See MTCA.4.1 Redundant: Power Fan © Elma Kay Rehlich, DESY June 6 2016, Real Time Conference

MTCA.4: Clocks, Triggers und Interlocks Common modules Application modules Trigger Interlock Clock Machine Protection System ADC Digi. IO Controller …. LLRF Diagnostics Cpl. Interlocks Laser … MCH Trigger Clock Timing From central timing CPU Ethernet MTCA.4 Backplane Kay Rehlich, DESY June 6 2016, Real Time Conference

Timing System: Synchronization of all Subsystems Transmitter Piggyback with 3 channels of link drift compensation Fiber IO RJ45 LVDS x2timer / NAMC-psTimer receiver / transmitter / repeater Kay Rehlich, DESY June 6 2016, Real Time Conference

Timing System: Versatile IO 9 Lemo outputs (50 Ohm): Triggers, Clocks, Data 3 channels with 5ps resolution Optional RTM backplane AMC RJ45 LVDS > 100 m x2timer / NAMC-psTimer receiver / transmitter 9 SFP outputs: with length compensated fiber links 9 Fiber outputs (ST): Triggers, Clocks, Data used for modulators Kay Rehlich, DESY June 6 2016, Real Time Conference

Timing System: Principle of Operation Distributes: Triggers, gates, clocks (10ns … 5ps resolution) Bunch information (charge, destination,…), unique ID Link drift compensation: Jitter ~10ps RMS Transmitter Receiver ∿∿∿∿ 1.3 GHz Fiber Cable 4 km Clock Trigger Data Generation Delay Clock Trigger Data Clock & Data Recovery Controller ∿ 50 Hz Delay Trigger Kay Rehlich, DESY June 6 2016, Real Time Conference

XFEL Injector Operation Photo Gun 2 superconducting acceleration modules (1.3 and 3.9 GHz) length: 45m In operation since Dec. 2015 Implements most of the XFEL subsystems: Klystron, Modulator, LLRF, BPM, Toroid, Magnet, Laser, Undulator, Vacuum, Water, Camera, Motor, Cryo, Timing, Protection, Dump, … DAQ system, middle layer servers, GUI programs and tools, … > 3.3・106 control system properties online now (270 000 channels with history) Kay Rehlich, DESY June 6 2016, Real Time Conference

XFEL Injector: 1. Diagnostics Crate Gun Rack Cooling Kay Rehlich, DESY June 6 2016, Real Time Conference

XFEL Injector: Regelung der Hochfrequenz Rear Front Kay Rehlich, DESY June 6 2016, Real Time Conference

MicroTCA Crate Inside the XFEL Tunnel 1 von 100 Superconducting Accelerator Modules 1 Klystron drives 4 Modules MicroTCA Crates: 2 LLRF 2 Coupler Interlocks 1 Diagnostics LLRF MicroTCA Crate Kay Rehlich, DESY June 6 2016, Real Time Conference

MicroTCA Remote Management Display by standard controls tool jddd Management View DOOCS Control System View 1414 Kay Rehlich, DESY June 6 2016, Real Time Conference

MicroTCA Crate Management View Shows all Crates in XFEL Shows all Modules in selected Crate Kay Rehlich, DESY June 6 2016, Real Time Conference

DOOCS Control System Data Flow Kay Rehlich, DESY June 6 2016, Real Time Conference

DOOCS Data Acquisition System Fast Collector Slow Collector Buffer Manager Shared Memory Orbit Server Energy Other Writer Feedback Server Disk Tape Configuration Controller Front-end Ethernet Multicast to several DAQ instances DAQ Toroid Server Toroid 1 Toroid 2 Kay Rehlich, DESY June 6 2016, Real Time Conference

Analyze all Shots with Bunch Resolution Jddd: GUI editor DAQ GUI MATLAB Fast Collector Slow Collector Buffer Manager Shared Memory Orbit Server Energy Other Writer Kay Rehlich, DESY June 6 2016, Real Time Conference

DAQ Maintenance Panel (Example: FLASH) Storage Streams Attached Processes Data Collectors Distributed Front-ends Kay Rehlich, DESY June 6 2016, Real Time Conference

Started 2009  MTCA.4 published 2011 Summary PICMG Standard Started 2009  MTCA.4 published 2011 Q2 2016: MTCA.4.1 extensions Other projects can benefit from the standard XFEL fast Diagnostics and Controls platform is Final installation > 200 MicroTCA.4 Crates Injector is fully operational since Dec. 2015 Linac cool-down will start Oct. 2016 Critical Hardware and Software is successful in operation Kay Rehlich, DESY June 6 2016, Real Time Conference

More info: doocs.desy.de Thank you! More info: doocs.desy.de Kay Rehlich, DESY June 6 2016, Real Time Conference