ST software status, Jeroen van Tilburg

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
TB analysis update Gwen & Alessandra VELO Group Meeting, Monday October 6 th first fits of the landaus header correction algorithms irradiated RD50: status.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
CSC DQA and Commissioning Summary  We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility  We are ready for.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
1 G4MICE Malcolm Ellis SciFi Tracker Meeting, KEK Thursday 31st March 2005.
SSD Status P. Christakoglou (NIKHEF-UU) for the SSD collaboration Thanks to: Marco vL, Enrico, Mino, Marek and Massimo.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Muon commissioning status and plans G.P. C. De Plano.
LHCb Lausanne Workshop, 21st March /12 Tracking Software for DC’06 E. Rodrigues, NIKHEF LHCb Tracking and Alignment Workshop  To do list, and done.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
Refitting Tracks from DST E. Rodrigues, NIKHEF LHCb Tracking and Alignment Workshop, Lausanne, 8-9th November 2006  Motivations  Step-by-step …  Current.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Louis Nicolas – LPHE-EPFL T-Alignment: Track Selection December 11, 2006 Track Selection for T-Alignment studies Louis Nicolas EPFL Monday Seminar December.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
David Hutchcroft 1 VELO software. Lite clusters in Kalman fit 2 The VELO clusters are available both as a lite and “full” version Two consecutive blocks.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
PHOS offline status report Yuri Kharlov ALICE offline week 7 July 2008.
Abraham Gallas for the LHCb Silicon Tracker Group 7 th International Hiroshima Symposium on Development and Application of Semiconductor Tracking Devices.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
ST Occupancies (revisited) M. Needham EPFL. Introduction Occupancies matter Date rates/sizes In particular was data size on links from Tell1 to farm estimated.
3 May 2003, LHC2003 Symposium, FermiLab Tracking Performance in LHCb, Jeroen van Tilburg 1 Tracking performance in LHCb Tracking Performance Jeroen van.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
LHCb Alignment Strategy 26 th September 2007 S. Viret 1. Introduction 2. The alignment challenge 3. Conclusions.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Aras Papadelis, NIKHEF Jaarvergadering 19/12/06 1 Fresh results from the LHCb Vertex Locator test beam Aras Papadelis Ann Van Lysebetten, Anne Keune, Eddy.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
ST Analysis: Introduction M. Needham EPFL. Outline Aims of the meeting Releasing code Performance Monitoring Results (IT and TT): Active fraction, noise.
Custom Classes DetectorShapeView2D: Detector mouseover callbacks (default is mouse click). EventControl:
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
First collisions in LHC
Rainer Stamen, Norman Gee
Christoph Blume Offline Week, July, 2008
FVTX High Multiplicity Trigger for Run15
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
DPG Activities DPG Session, ALICE Monthly Mini Week
TOF CALIBRATION DATABASE
Preparation of LHCb for data taking
ALiBaVa A brief overlook of Liverpool software changes, common issues and questions. A. Affolder, A. Greenall, I. Tsurin, G. Casse, V. Chmill, M. Wormald,
Tracking System at CERN 06 and 07 test beams
Roberto Chierici - CERN
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
VELO Software Status Some highlights of recent work
Tracker Software Status
CMS Pixel Data Quality Monitoring
LHCb Alignment Strategy
Muon Group Software Report
The CMS Tracking Readout and Front End Driver Testing
Current status Minjung Kim
VELO Software Update TELL1 Algorithms Error analysis
LHCb Data Quality Check web. cern
First results from the LHCb Vertex Locator
Presentation transcript:

ST software status, Jeroen van Tilburg Since last software week: 3 ST software meetings 2 dedicated to TED preparations. LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

ST software status, Jeroen van Tilburg ST occupancy in MC09 Matt Needham Following the request from Niko the expected occupancy numbers are updated on Twiki page: https://lbtwiki.cern.ch/bin/view/Online/Tell1PortNum IT occupancy increased dramatically in MC09 (up to 160 bytes/event) → Identified to problem with wrong material in OT foam. Fixed in the latest version of the dbase. LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

ST software status, Jeroen van Tilburg TELL1 algorithm Anne Keune Viktor Hangartner Nicola Chiapolini Current emulation Extensively studied by Anne. Bit-perfect when events arrive in order. Data taken during TED run to study pedestal following with clusters. Investigate running emulation online to find discrepancies. New studies indicate that Header correction can be more effective Either, calculate pedestal for each header configuration or, fixed correction for each header configuration Pedestal depends on whether PCN is odd/even Order of 5 ADC counts Effect is removed by the common mode correction. Revise the current implementation of the TELL1 Discussion with Guido on 30 June. Improve header correction… Simplify and improve LCMS algorithm… LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

TELL1 parameter uploading Johan Luisier Create PVSS recipes from TELL1 parameters in conditions DB. Common effort with VELO. Get the XML data and converts to addresses and registers. Existing fwTell1 component extended. Tested and working Creation of recipes ready before TED Discrepancies in pedestals found between old and new TELL1 configuration. Under investigation… LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

ST software status, Jeroen van Tilburg Monitoring Mark Tobin Nicola Chiapolini A lot of work done in last few months Optimizing of code. All online histograms defined Twiki page Divided into Expert and Summary e.g. noise values for each channel Repacking of algorithms in STMonitors: real and simulated data STCheckers: only simulated data Tool to create Pages in Presenter (HistDBPython) Created by Nicola. Heavily used to setup pages Setting up monitoring pages for the TED Especially histograms to display TAE data. Histograms to verify timing settings. Monitoring of all banks (NZS, raw, error) New and useful histograms. All online histograms defined Twiki page. TT hit map LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

ST software status, Jeroen van Tilburg TED runs TED spin-offs: Discovery of infrequent problems Tell1 parity errors Error banks due to low optical power Discovery of cable swaps, HV problems. Boosted software development Many other things. Still working on: Reprocessing of NZS data needed due to wrong Tell1 configuration Already finished 50% by Johan! Need to put in a central place. Note that old (ZS) data was not totally useless. Updating the databases IT in open position Masking of bad channels/ports for track reconstruction Tracking and alignment with June TED data. Pulse shapes and HV scan. LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

ST software status, Jeroen van Tilburg TED timing settings Mathias Knecht Jonathan Anderson Well-prepared analysis chain → setup by Mathias and Jonny: Fit MPV of Landau (charge) distributions. Plot MPV as function of delay. Fit and find the maximum and adjust timings. At some point minimize for spill-over. During preparations: → In TT found 2 TFC cables swapped by looking at 2008 TED data. After timing scan correct timing settings at hand within 10 minutes! → IT timing setting took a bit longer Many different delay settings Code confusing Late hour of the day LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

Silicon overlap for TED tracks Used numbers Slope of TED tracks: 11.4 mrad IT open position: ±50 cm Velo open position: ±30 mm “Do you have long tracks?” Excellent overlap IT—TT Good overlap Velo—IT Good overlap Velo—TT Moderate overlap IT—TT No overlap Velo—IT Moderate overlap Velo—TT LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

TED tracking and alignment Matt Needham Vincent Fave Louis Nicolas IT in open position Sample of ~ 12k IT tracks collected with low intensity (very useful for alignment) ~ 50k tracks in total Box and layer alignment performed Alignment confirmed with a precision of 30 μm LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

ST software status, Jeroen van Tilburg Adding TT hits Currently, several methods exists to add TT hits to a track Home-grown algorithms from PatForward, Matching, Upstream and Downstream tracking. Idea: Investigate the commonalities of these methods. Create a single tool which combines or takes the best of all worlds. Manpower: Jonathan and Michel (Zurich) LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg

ST software status, Jeroen van Tilburg Summary of summaries Updated occupancy numbers based on MC09 Available on Twiki. TELL1 algorithms Bit-perfect emulation Discussion on improving algorithms. TELL1 uploading Creating recipes from XML ready. Debugging parameter calculation. Monitoring Successfully used during TED run. TED runs Reprocessing the data. Need to insert in bookkeeping. Tracking and alignment with TED First tracking and alignment performed. Still requires a lot of work for a more detailed study. LHCb software week, 17-06-2009 ST software status, Jeroen van Tilburg